{"id":68463,"date":"2017-10-17T13:36:10","date_gmt":"2017-10-17T10:36:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68463"},"modified":"2017-10-17T13:36:10","modified_gmt":"2017-10-17T10:36:10","slug":"zorlu-enerji-ve-first-solardan-turkiyeye-gunes-paneli-fabrikasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-ve-first-solardan-turkiyeye-gunes-paneli-fabrikasi\/","title":{"rendered":"(Turkish) Zorlu Enerji ve First Solar&#8217;dan T\u00fcrkiye\u2019ye G\u00fcne\u015f Paneli Fabrikas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68463\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Enerji Grubu Ba\u015fkan\u0131 Ak taraf\u0131ndan ABD merkezli First Solar\u2019\u0131n 1000 mw \u00fczerinde bir kapasiteye ula\u015fmas\u0131 halinde Zorlu Enerji ortakl\u0131\u011f\u0131 ile T\u00fcrkiye\u2019ye de bir g\u00fcne\u015f paneli fabrikas\u0131 kurmay\u0131 planlad\u0131\u011f\u0131 belirtildi.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-68464 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi-300x167.jpg\" alt=\"\" width=\"300\" height=\"167\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi-300x167.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi-768x427.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi-500x278.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/first-solar-zorlu-enerji-isbirligi.jpg 960w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Ak, \u201cFirst Solar y\u00f6netimi olarak 1000mw \u00fczerinde bir kapasiteye ula\u015fabilirsek, T\u00fcrkiye\u2019de fabrika kurabileceklerini ifade etti. Y\u0131ll\u0131k \u00fcretim g\u00fc\u00e7lerini 3 binden 6 bin mw, sonras\u0131nda da bu t\u00fcr yeni a\u00e7\u0131l\u0131mlarla 10 bin mw \u00e7\u0131karma hedefi olan First Solar\u2019la bu hafta ABD\u2019de T\u00fcrkiye\u2019de kurulma plan\u0131 olan panel fabrikas\u0131 i\u00e7in de g\u00f6r\u00fc\u015fece\u011fiz\u201d dedi.<\/p>\n<p>Pakistan\u2019da daha \u00f6nce yapt\u0131klar\u0131 50 mw r\u00fczgar enerjisi santralindan sonra \u015fimdi de g\u00fcne\u015f enerjisine y\u00f6nelik \u00e7al\u0131\u015fmalara ba\u015flad\u0131klar\u0131n\u0131 da belirten Sinan Ak &#8220;Bat\u0131 \u015eeria\u2019n\u0131n y\u00fczde 30\u2019unda elektrik da\u011f\u0131t\u0131m\u0131 yapan Kud\u00fcs Elektrik \u015firketi ile de 30 mw bir g\u00fcne\u015f santrali kurma plan\u0131 bulunmaktad\u0131r&#8221;ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji Grubu Ba\u015fkan\u0131 Ak taraf\u0131ndan ABD merkezli First Solar\u2019\u0131n 1000 mw \u00fczerinde bir kapasiteye ula\u015fmas\u0131 halinde Zorlu Enerji ortakl\u0131\u011f\u0131 ile T\u00fcrkiye\u2019ye de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,67,1009,532,35801,13694,2326,13,23416,23133,142,23131,1315,2582,3228,344],"views":1053,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68463"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68463"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68463\/revisions"}],"predecessor-version":[{"id":68465,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68463\/revisions\/68465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68464"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}