{"id":68280,"date":"2017-10-11T12:15:27","date_gmt":"2017-10-11T09:15:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68280"},"modified":"2017-10-11T12:15:52","modified_gmt":"2017-10-11T09:15:52","slug":"melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor\/","title":{"rendered":"(Turkish) Melikgazi Belediyesi Binas\u0131 Kendi Elektri\u011fini G\u00fcne\u015ften \u00dcretiyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68280\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Melikgazi Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7 taraf\u0131ndan Belediye Hizmet Binas\u0131 \u00e7at\u0131s\u0131nda g\u00fcne\u015f enerjisinden elektrik \u00fcretimine ba\u015fland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p><span id=\"more-94571\"><\/span>\u00c7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santralinin toplam 441 g\u00fcne\u015f panelinden meydana geldi\u011fini genel enerji hatt\u0131na ba\u011flant\u0131n\u0131n sa\u011fland\u0131\u011f\u0131n\u0131 dile getiren Ba\u015fkan Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7, g\u00fcne\u015f santralinden elde edilen <img loading=\"lazy\" class=\"alignleft size-medium wp-image-68281\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor-300x166.jpg\" alt=\"\" width=\"300\" height=\"166\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor-300x166.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor-500x277.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/melikgazi-belediyesi-binasi-kendi-elektrigini-gunesten-uretiyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>enerjinin Belediye Hizmet Binas\u0131 elektrik ihtiyac\u0131nda kullan\u0131larak enerjisini art\u0131k g\u00fcne\u015ften alan bir kurum konumuna geldiklerini s\u00f6yledi.<\/p>\n<p>G\u00fcne\u015f enerji santralinin 3 y\u0131lda kendini amorti edece\u011fini belirten B\u00fcy\u00fckk\u0131l\u0131\u00e7 \u201c Kesintisiz hizmet i\u00e7in kesintisiz ama daha ucuz enerji ile bundan b\u00f6yle hizmete ve yat\u0131r\u0131mlar\u0131 s\u00fcrd\u00fcrece\u011fiz. Enerji t\u00fcketimini kar\u015f\u0131lamak i\u00e7in T\u00fcrkiye\u2019de resmi kurum taraf\u0131ndan yap\u0131lan en b\u00fcy\u00fck \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f sistemini Melikgazi Belediyesi olarak yapt\u0131k. Belediyemiz hizmet binas\u0131n\u0131n \u00e7at\u0131s\u0131na 441 g\u00fcne\u015f panelinden olu\u015fan ve 120 KWP hibrit sistem \u00fczerine kurulan g\u00fcne\u015f enerjisinden elektrik \u00fcretmektedir.&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Melikgazi Belediye Ba\u015fkan\u0131 Memduh B\u00fcy\u00fckk\u0131l\u0131\u00e7 taraf\u0131ndan Belediye Hizmet Binas\u0131 \u00e7at\u0131s\u0131nda g\u00fcne\u015f enerjisinden elektrik \u00fcretimine ba\u015fland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. \u00c7at\u0131 \u00fcst\u00fc g\u00fcne\u015f santralinin toplam 441 g\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[35699,68,148,2326,13,23416,2569,1353,23133,34925,23131,2231,2261],"views":1068,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68280"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68280"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68280\/revisions"}],"predecessor-version":[{"id":68283,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68280\/revisions\/68283"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68281"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}