{"id":68177,"date":"2017-10-08T16:41:15","date_gmt":"2017-10-08T13:41:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68177"},"modified":"2017-10-08T16:41:15","modified_gmt":"2017-10-08T13:41:15","slug":"bursada-pilic-kesimhane-atigindan-elektrik-uretilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek\/","title":{"rendered":"(Turkish) Bursa\u2019da Pili\u00e7 Kesimhane At\u0131\u011f\u0131ndan Elektrik \u00dcretilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68177\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>C.P. Standart G\u0131da taraf\u0131ndan Bursa\u2019n\u0131n \u0130neg\u00f6l il\u00e7esindeki Pili\u00e7 kesimhanelerinden \u00e7\u0131kan d\u00f6rt farkl\u0131 at\u0131k tipi yak\u0131larak elektrik \u00fcretimi yap\u0131lacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-68178\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/bursada-pilic-kesimhane-atigindan-elektrik-uretilecek.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>38.704,24 m2 alan i\u00e7indeki \u0130\u015flenmi\u015f Pili\u00e7 Eti faaliyet alan\u0131n\u0131n 2.209 m2\u2019lik k\u0131sm\u0131nda, g\u00fcnde maksimum 95 ton\/g\u00fcn \u00e7amur yakma kapasitesine sahip, 2 mod\u00fclden olu\u015fan (47,5 ton\/g\u00fcn &#8211; 47,5 ton\/g\u00fcn yada 60 ton\/g\u00fcn &#8211; 35 ton\/g\u00fcn), ak\u0131\u015fkan yatakl\u0131 reakt\u00f6r kurulumu yap\u0131lacak.<\/p>\n<p>16 milyon lira yat\u0131r\u0131m bedelli proje ile \u0131s\u0131 d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc kazanda iki \u00fcnite toplam (tek \u00fcnite 3.6 ton\/saat buhar \u00fcretmekte) 7.26 ton\/saat buhar enerjisine d\u00f6n\u00fc\u015f\u00fcp 7.26 ton \/saat buhar, buhar t\u00fcrbininde yakla\u015f\u0131k 1 MW\/saat elektrik enerjisi \u00fcretecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.C.P. Standart G\u0131da taraf\u0131ndan Bursa\u2019n\u0131n \u0130neg\u00f6l il\u00e7esindeki Pili\u00e7 kesimhanelerinden \u00e7\u0131kan d\u00f6rt farkl\u0131 at\u0131k tipi yak\u0131larak elektrik \u00fcretimi yap\u0131lacak. 38.704,24 m2 alan i\u00e7indeki \u0130\u015flenmi\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68178,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[6226,640,35143,29816,958,35642,68,1009,34923,23311,35643,35644],"views":1887,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68177"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68177"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68177\/revisions"}],"predecessor-version":[{"id":68179,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68177\/revisions\/68179"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68178"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}