{"id":68080,"date":"2017-10-04T14:37:03","date_gmt":"2017-10-04T11:37:03","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68080"},"modified":"2017-10-04T14:37:03","modified_gmt":"2017-10-04T11:37:03","slug":"gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek\/","title":{"rendered":"(Turkish) GM, 2023 Y\u0131l\u0131na Kadar 20 \u00c7e\u015fit Elektrikli Otomobil \u00dcretecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68080\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>General Motors taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada \u00f6n\u00fcm\u00fczdeki 18 ay i\u00e7ersinde 2 tane tamamen elektrikli olan otomobil tan\u0131taca\u011f\u0131 duyuruldu. \u015eirketin hedefi ise 2023 y\u0131l\u0131na kadar 20 farkl\u0131 model elektrikli otomobil \u00e7\u0131kartmak olacakt\u0131r.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-68082\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek-300x209.jpg\" alt=\"\" width=\"300\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek-500x348.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/10\/gm-2023-yilina-kadar-20-cesit-elektrikli-otomobil-uretecek.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>General Motors, elektrikli otomobillere olduk\u00e7a \u00f6nem vermektedir ve iki yeni modelini 2019 y\u0131l\u0131na kadar piyasaya s\u00fcrmeyi hedefllemektedir. \u015eirketin as\u0131l hedefi 2023&#8217;e kadar de\u011fi\u015fik segmentlerde ve s\u0131n\u0131flarda 20 farkl\u0131 tamamen elektrikli otomobil \u00fcretmek olacakt\u0131r.<\/p>\n<p>GM\u2019nin Detroit kentinde yap\u0131lan bas\u0131n toplant\u0131s\u0131nda \u015firketin \u00fcr\u00fcn geli\u015ftirme direkt\u00f6r yard\u0131mc\u0131s\u0131 olan Mark Reuss kendilerinin neredeyse t\u00fcm ara\u015ft\u0131rma ve geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 elektrikli otomobillere ay\u0131rd\u0131klar\u0131 ifade edildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.General Motors taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada \u00f6n\u00fcm\u00fczdeki 18 ay i\u00e7ersinde 2 tane tamamen elektrikli olan otomobil tan\u0131taca\u011f\u0131 duyuruldu. \u015eirketin hedefi ise 2023 y\u0131l\u0131na kadar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":68082,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,157],"tags":[34979,19638,34980,26353,215,1270,3549,35609,35610,35611,25957],"views":867,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68080"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68080"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68080\/revisions"}],"predecessor-version":[{"id":68083,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68080\/revisions\/68083"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/68082"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}