{"id":68016,"date":"2017-10-02T11:11:46","date_gmt":"2017-10-02T08:11:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=68016"},"modified":"2017-10-02T11:11:46","modified_gmt":"2017-10-02T08:11:46","slug":"aksa-enerjinin-malideki-santrali-artik-tam-kapasitede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-malideki-santrali-artik-tam-kapasitede\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019nin Mali\u2019deki Santrali Art\u0131k Tam Kapasitede"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/68016\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji \u00dcretim A\u015e taraf\u0131ndan Mali\u2019de kurulu olan 40 megavat kurulu g\u00fcce sahip elektrik santralinin tam kapasite ile i\u015fletmeye al\u0131nd\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><span id=\"more-94274\"><\/span><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-56253\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/aksa-enerji-madagaskar-santral-tesisi-icin-firma-kurdu-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/aksa-enerji-madagaskar-santral-tesisi-icin-firma-kurdu-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/aksa-enerji-madagaskar-santral-tesisi-icin-firma-kurdu-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/aksa-enerji-madagaskar-santral-tesisi-icin-firma-kurdu-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/08\/aksa-enerji-madagaskar-santral-tesisi-icin-firma-kurdu.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) yap\u0131lan a\u00e7\u0131klamada toplam da 40 mw kurulu g\u00fc\u00e7teki santralin kalan b\u00f6l\u00fcm\u00fcn\u00fcn kabul i\u015flemlerinin bug\u00fcn tamamland\u0131\u011f\u0131 ifade edilerek, \u015fu bilgilere yer verildi:<\/p>\n<p>\u201cToplam 40 megavat kurulu g\u00fc\u00e7teki santralin kalan 30 megavatl\u0131k b\u00f6l\u00fcm\u00fcn\u00fcn kabul\u00fc bug\u00fcn tamamlanarak, Bakanl\u0131k heyeti taraf\u0131ndan ticari i\u015fletmeye al\u0131nm\u0131\u015ft\u0131r. Avro cinsinden enerji sat\u0131\u015f\u0131 yapacak olan Mali santralimiz, d\u00f6viz bor\u00e7lulu\u011fumuzu do\u011fal bir mekanizma ile hedge etmemizi, karl\u0131l\u0131\u011f\u0131m\u0131z\u0131 art\u0131rmam\u0131z\u0131 ve sat\u0131\u015f hacmimizi y\u00fckseltmemizi sa\u011flayacakt\u0131r. Santralin y\u0131lda 10 milyon dolar FAV\u00d6K (Faiz Amortisman Vergi \u00d6ncesi Kar) yaratmas\u0131 ve \u00fclkenin toplam t\u00fcketiminin y\u00fczde 13\u2019\u00fcn\u00fc kar\u015f\u0131lamas\u0131 beklenmektedir.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji \u00dcretim A\u015e taraf\u0131ndan Mali\u2019de kurulu olan 40 megavat kurulu g\u00fcce sahip elektrik santralinin tam kapasite ile i\u015fletmeye al\u0131nd\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Kamuyu Ayd\u0131nlatma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":56253,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,160,67,1009,35582,7697,16538,5436,35583],"views":536,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68016"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=68016"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68016\/revisions"}],"predecessor-version":[{"id":68017,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/68016\/revisions\/68017"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/56253"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=68016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=68016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=68016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}