{"id":67897,"date":"2017-09-29T11:54:54","date_gmt":"2017-09-29T08:54:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67897"},"modified":"2017-09-29T11:56:18","modified_gmt":"2017-09-29T08:56:18","slug":"aksa-enerjiden-endonezyaya-dogalgaz-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjiden-endonezyaya-dogalgaz-santrali\/","title":{"rendered":"(Turkish) Aksa Enerji&#8217;den Endonezya\u2019ya Do\u011falgaz Santrali"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67897\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><img loading=\"lazy\" class=\"alignleft wp-image-48944\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg\" alt=\"\" width=\"292\" height=\"292\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/acil-enerji-ihtiyacina-cozum-kiralik-jenerator-50x50.jpg 50w\" sizes=\"(max-width: 292px) 100vw, 292px\" \/><\/p>\n<p><strong>Aksa Enerji taraf\u0131ndan Endonezya\u2019n\u0131n Aceh Eyaleti\u2019nde do\u011falgaz santrali kurma konusunda niyet anla\u015fmas\u0131 imzaland\u0131. Hitay Holding de jeotermal enerji projeleri geli\u015ftirme \u00fczerine niyet anla\u015fmas\u0131 imzalad\u0131.<\/strong><\/p>\n<p><span id=\"more-94245\"><\/span>Hitay Holding, Enersis ve Aksa Enerji, Endonezya\u2019n\u0131n Aceh Eyaleti\u2019nde jeotermal enerji projelerinin geli\u015ftirilmesi ve do\u011falgaz santrali kurulmas\u0131na y\u00f6nelik ayr\u0131 ayr\u0131 niyet mektubu ve mutabakat zapt\u0131 imzalad\u0131lar.<\/p>\n<p>Anla\u015fma ile, bilgi teknolojileri, \u00f6deme sistemleri, online ara\u015ft\u0131rma, g\u00fcvenlik teknolojileri ve online \u015fans oyunlar\u0131nda yat\u0131r\u0131mlar\u0131 olan Hitay Holding, jeotermal varl\u0131klar\u0131 geli\u015ftirmek ve projenin finansman\u0131n\u0131 y\u00f6netmek i\u00e7in bir \u00f6n ara\u015ft\u0131rma ger\u00e7ekle\u015ftirmek \u00fczere Aceh H\u00fck\u00fcmetiyle beraber \u00e7al\u0131\u015fmalar y\u00fcr\u00fctecek. Niyet mektubuna g\u00f6re, Aksa Enerji ile Enersis ise Aceh Eyaleti\u2019ndeki elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131 amac\u0131 ile enerji santrallerinin yat\u0131r\u0131m ve i\u015fletimi i\u00e7in gerekli t\u00fcm teknoloji, mal ve hizmetleri tedarik edecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji taraf\u0131ndan Endonezya\u2019n\u0131n Aceh Eyaleti\u2019nde do\u011falgaz santrali kurma konusunda niyet anla\u015fmas\u0131 imzaland\u0131. Hitay Holding de jeotermal enerji projeleri geli\u015ftirme \u00fczerine niyet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1571,1128,19761,34929,4725,23219,16200,35531,35532,35533],"views":1488,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67897"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67897"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67897\/revisions"}],"predecessor-version":[{"id":67899,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67897\/revisions\/67899"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}