{"id":67748,"date":"2017-09-24T21:49:38","date_gmt":"2017-09-24T18:49:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67748"},"modified":"2017-09-24T21:50:51","modified_gmt":"2017-09-24T18:50:51","slug":"gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Panellerinden Elektrik \u00dcretim Kapasitesi N\u00fckleer Enerjiyi Ge\u00e7ecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67748\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f enerjisi \u00fczerine ara\u015ft\u0131rmalar yapan GTM Research taraf\u0131ndan d\u00fcnyan\u0131n g\u00fcne\u015ften elektrik \u00fcretim kapasitesinin gelecek aylarda n\u00fckleer santrallerin \u00fcretim kapasitesini ge\u00e7ece\u011fi a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-67749\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/gunes-panellerinden-elektrik-uretim-kapasitesi-nukleer-enerjiyi-gececek.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span id=\"more-93980\"><\/span>2017 y\u0131l\u0131n\u0131n sonunda g\u00fcne\u015fte 391,5 GW elektrik \u00fcretim kapasitesine ula\u015f\u0131laca\u011f\u0131 \u00f6ng\u00f6r\u00fclmekte olunup g\u00fcne\u015f enerjisi sistemleri 390 GW kapasiteye sahip n\u00fckleeri ise arkas\u0131nda b\u0131rakacak.<\/p>\n<p>GTM Research, bu y\u0131l elektrik \u00fcretimine ilave olacak 81 GW kapasiteli g\u00fcne\u015f panelinin oldu\u011fu, bunun 2014 y\u0131l\u0131na g\u00f6re 2 kat, 10 y\u0131l \u00f6ncesine g\u00f6re ise 32 kat fazla bir b\u00fcy\u00fckl\u00fck oldu\u011fu ve ilaveten \u201c2022 y\u0131l\u0131nda k\u00fcresel g\u00fcne\u015f enerjisi \u00fcretim kapasitesinin 871 GW ula\u015fmas\u0131n\u0131 \u00f6ng\u00f6rmekteyiz. Bu, 2017 y\u0131l\u0131nda n\u00fckleer santral kapasitesinin iki kat\u0131na ula\u015fmak anlam\u0131n\u0131 ta\u015f\u0131maktad\u0131r\u201d ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f enerjisi \u00fczerine ara\u015ft\u0131rmalar yapan GTM Research taraf\u0131ndan d\u00fcnyan\u0131n g\u00fcne\u015ften elektrik \u00fcretim kapasitesinin gelecek aylarda n\u00fckleer santrallerin \u00fcretim kapasitesini ge\u00e7ece\u011fi a\u00e7\u0131kland\u0131. 2017 y\u0131l\u0131n\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67749,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,43,18007],"tags":[17882,68,19,63,35472,35473,227,23416,23133,142,34925,23131,1133,71,23134,25480,34930],"views":2746,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67748"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67748"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67748\/revisions"}],"predecessor-version":[{"id":67750,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67748\/revisions\/67750"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67749"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}