{"id":67736,"date":"2017-09-24T20:53:05","date_gmt":"2017-09-24T17:53:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67736"},"modified":"2017-09-24T20:58:12","modified_gmt":"2017-09-24T17:58:12","slug":"aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek\/","title":{"rendered":"(Turkish) Aksa, \u0130ncesu HES\u2019in Sat\u0131\u015f\u0131 \u0130\u00e7in Gelen Teklifleri De\u011ferlendirecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67736\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji taraf\u0131ndan \u00c7orum \u00c7ekerek \u00c7ay\u0131 \u00fczerinde yer alan 15 MW\u2019l\u0131k \u0130ncesu HES&#8217;in sat\u0131\u015f\u0131 i\u00e7in gelen tekliflerin de\u011ferlendirmesine y\u00f6nelik karar al\u0131nd\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-67740\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek-1-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek-1-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek-1-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek-1-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/aksa-incesu-hesin-satisi-icin-gelen-teklifleri-degerlendirecek-1.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Aksa Enerji, \u00fcretim filosunun ilk hidroelektrik enerji santrali olan ve 2011&#8217;de devreye giren \u0130ncesu HES\u2019i\u00e7in sat\u0131\u015f karar\u0131 ald\u0131. \u0130ncesu Hidroelektrik Santrali&#8217;nin sat\u0131\u015f\u0131 i\u00e7in gelen tekliflerin de\u011ferlendirilmesine \u015firketce karar al\u0131nd\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada, &#8220;Y\u00f6netim Kurulu&#8217;nun 21 Eyl\u00fcl 2017&#8217;de alm\u0131\u015f oldu\u011fu karar ile Aksa Enerji \u00dcretim A.\u015e. b\u00fcnyesinde bulunan 15 MW kurulu g\u00fc\u00e7teki \u0130ncesu Hidroelektrik Santrali&#8217;nin sat\u0131\u015f\u0131 i\u00e7in \u015firketimize gelen tekliflerin de\u011ferlendirilmesine karar verilmi\u015ftir. Sat\u0131\u015fa istinaden gelen tekliflerin de\u011ferlendirilmesi sonras\u0131nda geli\u015fmelerle ilgili bilgilendirme yap\u0131lacakt\u0131r.&#8221; ifadelerine yer verildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji taraf\u0131ndan \u00c7orum \u00c7ekerek \u00c7ay\u0131 \u00fczerinde yer alan 15 MW\u2019l\u0131k \u0130ncesu HES&#8217;in sat\u0131\u015f\u0131 i\u00e7in gelen tekliflerin de\u011ferlendirmesine y\u00f6nelik karar al\u0131nd\u0131. Aksa Enerji, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67740,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1571,34926,26043,1090,26044,35468],"views":2050,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67736"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67736"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67736\/revisions"}],"predecessor-version":[{"id":67742,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67736\/revisions\/67742"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67740"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67736"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67736"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67736"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}