{"id":67477,"date":"2017-09-17T11:39:58","date_gmt":"2017-09-17T08:39:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67477"},"modified":"2017-09-17T12:11:40","modified_gmt":"2017-09-17T09:11:40","slug":"renoenin-ges-projesine-lisans-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/renoenin-ges-projesine-lisans-verildi\/","title":{"rendered":"(Turkish) Renoe&#8217;n\u0131n GES Projesine Lisans Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67477\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Lisansl\u0131 g\u00fcne\u015f enerjisi projelerinden Renoe Ac\u0131payam GES projesinin elektrik \u00fcretimine y\u00f6nelik, Enerji Piyasas\u0131 D\u00fczenleme Kurulu&#8217;nca 16 A\u011fustos 2017&#8217;de Resmi Gazete\u2019de\u00a0<\/strong><strong>yay\u0131mlanan ilana g\u00f6re, 27 Temmuz 2017 tarihli ve 7199-16 say\u0131l\u0131 Kurul Kara<\/strong><strong>r\u0131 ile 49 y\u0131l s\u00fcreli olarak elektrik \u00fcretim lisans\u0131 verildi.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-67478\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/renoenin-ges-projesine-lisans-verildi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Proje ile T\u00fcrkiye Elektrik \u0130letim A.\u015e.&#8217;nin 29 Ocak 2015&#8217;te yapt\u0131\u011f\u0131 kapasite tahsisi yar\u0131\u015fmas\u0131nda Denizli b\u00f6lgesi i\u00e7in 10 MW\u2019l\u0131k kapasite hakk\u0131 elde etmi\u015fti.<\/p>\n<p>Proje sahibi Renoe Enerji Yat\u0131r\u0131m Bili\u015fim Teknolojileri Sanayi ve Ticaret A.\u015e. bu hakk\u0131, MW ba\u015f\u0131na 1.450.000 TL olmak \u00fczere 14.500.000 TL\u2019lik katk\u0131 pay\u0131 \u00f6deme taahh\u00fcd\u00fc ile alm\u0131\u015ft\u0131. Renoe Enerji, Eriko\u011flu Holding\u2019in grup \u015firketleri i\u00e7erisinde bulunmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Lisansl\u0131 g\u00fcne\u015f enerjisi projelerinden Renoe Ac\u0131payam GES projesinin elektrik \u00fcretimine y\u00f6nelik, Enerji Piyasas\u0131 D\u00fczenleme Kurulu&#8217;nca 16 A\u011fustos 2017&#8217;de Resmi Gazete\u2019de\u00a0yay\u0131mlanan ilana g\u00f6re, 27 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67478,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[35379,2326,7440,23416,17606,2569,2206,23133,35380,35377,35378,26829],"views":1048,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67477"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67477"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67477\/revisions"}],"predecessor-version":[{"id":67479,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67477\/revisions\/67479"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67478"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67477"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67477"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67477"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}