{"id":67358,"date":"2017-09-14T12:00:58","date_gmt":"2017-09-14T09:00:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67358"},"modified":"2017-09-14T12:00:58","modified_gmt":"2017-09-14T09:00:58","slug":"ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini\/","title":{"rendered":"(Turkish) GE Yenilenebilir Enerji&#8217;den En B\u00fcy\u00fck Kara Tipi R\u00fczgar T\u00fcrbini"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67358\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>GE Yenilenebilir Enerji, yeni 4.8-158 kara tipi r\u00fczgar t\u00fcrbinini tan\u0131tt\u0131. Yeni r\u00fczgar t\u00fcrbini, GE&#8217;nin bug\u00fcne kadarki en y\u00fcksek verimlili\u011fe sahip t\u00fcrbini olma \u00f6zelli\u011fini ta\u015f\u0131yor. Segmentteki en b\u00fcy\u00fck rotor ile yenilik\u00e7i bir kanat tasar\u0131m\u0131na sahip 4.8-158 t\u00fcrbini, Y\u0131ll\u0131k Enerji \u00dcretiminde (AEP) \u00f6nemli bir iyile\u015fme sa\u011flayarak d\u00fc\u015f\u00fck ve orta r\u00fczgar h\u0131zl\u0131 sahalardaki m\u00fc\u015fterilerin enerji maliyetlerini d\u00fc\u015f\u00fcr\u00fcyor.<\/strong><\/p>\n<p>GE&#8217;nin Onshore R\u00fczgar Enerjisi \u0130\u015f Alan\u0131 Ba\u015fkan ve CEO&#8217;su Pete McCabe, \u015fu yorumda bulundu: &#8220;4.8-158 tasar\u0131m\u0131, t\u00fcrbin teknolojisi ve verimlilik i\u00e7in at\u0131lan \u00f6nemli bir ad\u0131m. \u015eu anda bu t\u00fcrbini sizlere tan\u0131t\u0131yor olmaktan b\u00fcy\u00fck heyecan duyuyoruz. <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-67359\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini-300x168.jpg\" alt=\"ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ge-yenilenebilir-enerjiden-en-buyuk-kara-tipi-ruzgar-turbini.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>T\u00fcrbin, Almanya, T\u00fcrkiye ve Avustralya gibi d\u00fc\u015f\u00fck ve orta r\u00fczgar h\u0131z\u0131 olan b\u00f6lgelerin yan\u0131 s\u0131ra ihale gibi s\u00fcre\u00e7ler i\u00e7in de uygun. \u00c7\u00fcnk\u00fc; d\u00fcnya genelinde bir\u00e7ok \u00fclke, enerji maliyetlerini d\u00fc\u015f\u00fcrmeye giderek daha \u00e7ok \u00f6nem veriyor.&#8221;<\/p>\n<p>GE&#8217;nin 4 MW segmentindeki ilk kara tipi (onshore) giri\u015fi olan yeni 4,8 MW r\u00fczgar t\u00fcrbini, 158 metrelik bir rotora ve 240 metreye kadar tepe y\u00fcksekli\u011fine sahip. Daha b\u00fcy\u00fck bir rotor ve y\u00fcksek kulelerin bir arada bulunmas\u0131, t\u00fcrbinin daha y\u00fcksek r\u00fczgar h\u0131zlar\u0131n\u0131 almas\u0131n\u0131 ve daha fazla enerji \u00fcretmesini sa\u011fl\u0131yor.<\/p>\n<p>GE&#8217;nin en yeni t\u00fcrbininde y\u00fcksek teknolojili kanatlar, geli\u015fmi\u015f y\u00fck ve kontroller ile daha y\u00fcksek ve daha uygun maliyetli kuleler bulunuyor. Bu yeni inovatif \u00f6zellikler, LM Wind Power, Blade Dynamics ve GE&#8217;nin K\u00fcresel Ara\u015ft\u0131rma Merkezi ile olan yak\u0131n i\u015fbirlikleri sayesinde geli\u015ftirilebildi.<\/p>\n<p>77 metre uzunlu\u011fundaki karbon kanatlar, LM Wind Power&#8217;\u0131n ge\u00e7mi\u015fteki g\u00fc\u00e7l\u00fc performans\u0131ndan ve malzeme inovasyonlar\u0131ndan yararlan\u0131yor. Bir yandan da \u015firketin bug\u00fcne kadar sundu\u011fu en uzun kara tipi (onshore) kanatlar\u0131 olma \u00f6zelli\u011fini ta\u015f\u0131yor. Rotor, spesifik m\u00fc\u015fteri ve saha gerekliliklerine ba\u011fl\u0131 olarak, \u00f6zelle\u015ftirilmi\u015f karbon kanatlarla \u00e7e\u015fitli ko\u015fullara g\u00f6re adapte edilebilir. Bu esneklik, GE&#8217;nin y\u00fcksek verimli \u00fcr\u00fcnler sunmada ve elektrik maliyetini a\u015fa\u011f\u0131 \u00e7ekmede m\u00fc\u015fterilere yard\u0131mc\u0131 olmas\u0131n\u0131 sa\u011fl\u0131yor. Ayr\u0131ca sekt\u00f6rdeki en k\u00fc\u00e7\u00fck Civata Halkas\u0131 \u00c7aplar\u0131na sahip olan kanatlar, imalat ve lojistik maliyetlerini de minimum d\u00fczeyde tutuyor.<\/p>\n<p>Pete McCabe s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc: &#8220;Bu t\u00fcrbin; K\u00fcresel Ara\u015ft\u0131rma Merkezi, LM Wind Power ve Blade Dynamics&#8217;in sundu\u011fu uzmanl\u0131k ve yenilik\u00e7i tasar\u0131m ile teknoloji ve geli\u015ftirmeleri bir araya getirerek GE Store ile neleri ba\u015farabilece\u011fimizin harika bir \u00f6rne\u011fi. Spesifik t\u00fcrbin gereksinimlerini kar\u015f\u0131lad\u0131\u011f\u0131m\u0131zdan emin olmak \u00fczere d\u00fcnya \u00e7ap\u0131nda 30&#8217;u a\u015fk\u0131n m\u00fc\u015fteriden veri toplad\u0131k; \u00e7\u00fcnk\u00fc bu m\u00fc\u015fteriler, daha d\u00fc\u015f\u00fck maliyetli yenilenebilir enerji sa\u011flamaya \u00e7al\u0131\u015f\u0131yor.&#8221;<\/p>\n<p>4.8-158; kan\u0131tlanm\u0131\u015f DFIG (\u00e7ift beslemeli end\u00fcksiyon jenerat\u00f6r\u00fc) ve sa\u011flam aktarma organlar\u0131 mimarisi de dahil olmak \u00fczere, GE&#8217;nin 2MW ve 3MW&#8217;l\u0131k platformlar\u0131ndan yararlan\u0131yor. En d\u00fc\u015f\u00fck ses emisyonu d\u00fczeylerini kar\u015f\u0131layan t\u00fcrbin, normal operasyonlar s\u0131ras\u0131nda 104 dB&#8217;e kadar inebiliyor. Yeni tasarlanan makina dairesi, daha b\u00fcy\u00fck vin\u00e7lere olan gereksinimi azalt\u0131rken, makina dairesinde yap\u0131lacak onar\u0131mlar\u0131 ve sorun giderme i\u015flemlerini kolayla\u015ft\u0131r\u0131yor.<\/p>\n<p>GE&#8217;nin en g\u00fc\u00e7l\u00fc kara tipi t\u00fcrbini, 30 binden fazla r\u00fczgar t\u00fcrbininden olu\u015fan \u015firket filosundan elde edilen i\u015f zekas\u0131 bilgileri kullan\u0131larak geli\u015ftirildi. B\u00f6ylesine b\u00fcy\u00fck bir kurulu g\u00fc\u00e7ten elde edilerek analiz edilen veriler, GE&#8217;nin yeni nesil kontrol sistemiyle 4.8-158&#8217;e g\u00fc\u00e7 veriyor. GE&#8217;nin Varl\u0131k Performans Y\u00f6netimi (Asset Performance Management, APM), Siber G\u00fcvenlik (Cybersecurity) ve \u0130\u015f Optimizasyonu (Business Optimization, BO) gibi Predix tabanl\u0131 uygulamalar\u0131n\u0131 kullanan m\u00fc\u015fterilerimiz, r\u00fczgar santrallerinin ya\u015fam d\u00f6ng\u00fcs\u00fcn\u00fcn uzat\u0131lmas\u0131 ve santral ekonomisinin iyile\u015ftirilmesi de dahil olmak \u00fczere bir\u00e7ok i\u015f sonucuna ula\u015f\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.GE Yenilenebilir Enerji, yeni 4.8-158 kara tipi r\u00fczgar t\u00fcrbinini tan\u0131tt\u0131. Yeni r\u00fczgar t\u00fcrbini, GE&#8217;nin bug\u00fcne kadarki en y\u00fcksek verimlili\u011fe sahip t\u00fcrbini olma \u00f6zelli\u011fini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67359,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[2422,19897,474,24949,231,23318,34961,34960,324,26829,12158],"views":1712,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67358"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67358"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67358\/revisions"}],"predecessor-version":[{"id":67360,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67358\/revisions\/67360"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67359"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}