{"id":67281,"date":"2017-09-11T09:14:45","date_gmt":"2017-09-11T06:14:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67281"},"modified":"2017-09-11T09:14:45","modified_gmt":"2017-09-11T06:14:45","slug":"buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti\/","title":{"rendered":"(Turkish) Buski G\u00fcn\u00fcm\u00fcze Kadar 10 Milyon 500 Bin kWh Elektrik \u00dcretti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67281\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji alan\u0131na y\u00f6nelik pek \u00e7ok yat\u0131r\u0131m yapt\u0131klar\u0131n\u0131\u00a0belirten BUSK\u0130 Genel M\u00fcd\u00fcr\u00fc \u0130smail Hakk\u0131 \u00c7etinavc\u0131 taraf\u0131ndan g\u00fcn\u00fcm\u00fcze\u00a0kadar 10 milyon 500 bin kilovatsaatlik elektrik \u00fcretimi ger\u00e7ekle\u015ftirildi\u011fi belirtildi.<\/strong><\/p>\n<p>Enerji yat\u0131r\u0131mlar\u0131n\u0131 \u201chidroel<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-67282\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti-300x171.jpg\" alt=\"buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti\" width=\"300\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti-300x171.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti-500x285.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/buski-gunumuze-kadar-10-milyon-500-bin-kwh-elektrik-uretti.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ektrik\u201d, \u201cr\u00fczgar\u201d ve \u201cg\u00fcne\u015f\u201d enerjisinden yararlanarak hayata ge\u00e7irdiklerini belirten\u00a0\u00c7etinavc\u0131,\u00a0hidroelektrik santralinden y\u0131ll\u0131k ortalama\u00a08 milyon 500 bin kWh\u2019l\u0131k enerji \u00fcretildi\u011fini,\u00a0250 kW kurulu g\u00fc\u00e7te\u00a0890 bin TL\u2019lik kurulum maliyetli g\u00fcne\u015f enerjisi santralinden bug\u00fcne kadar 536 bin kWh elektrik enerjisi \u00fcretti\u011fini ve\u00a030 kW\u2019l\u0131k Do\u011fu At\u0131ksu Ar\u0131tma Tesisi ile birlikte Haziran 2014\u2019te hayata ge\u00e7irdi\u011fimiz toplam kurlu g\u00fcc\u00fc 130 kW olan Bat\u0131 At\u0131ksu Ar\u0131tma Tesisi\u2019nde de elektrik \u00fcretiminin ger\u00e7ekle\u015fti\u011fini belirtti.<\/p>\n<p>\u00c7etinavc\u0131 ayr\u0131ca Mudanya Tepedevrent su deposu yan\u0131nda 1 milyon 470 bin TL\u2019lik yat\u0131r\u0131m ile kurulmas\u0131 planlanan\u00a0r\u00fczgar elektrik santralinin test \u00fcretim a\u015famas\u0131nda oldu\u011fu ifade edildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji alan\u0131na y\u00f6nelik pek \u00e7ok yat\u0131r\u0131m yapt\u0131klar\u0131n\u0131\u00a0belirten BUSK\u0130 Genel M\u00fcd\u00fcr\u00fc \u0130smail Hakk\u0131 \u00c7etinavc\u0131 taraf\u0131ndan g\u00fcn\u00fcm\u00fcze\u00a0kadar 10 milyon 500 bin kilovatsaatlik elektrik \u00fcretimi ger\u00e7ekle\u015ftirildi\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67282,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[3825,68,34979,19638,34980,26353,13,23416,70,35203,16],"views":1201,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67281"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67281"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67281\/revisions"}],"predecessor-version":[{"id":67283,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67281\/revisions\/67283"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67282"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}