{"id":67270,"date":"2017-09-11T08:09:11","date_gmt":"2017-09-11T05:09:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67270"},"modified":"2017-09-15T03:06:36","modified_gmt":"2017-09-15T00:06:36","slug":"afganistan-55-mw-gucunde-3-hibrit-ges-kurulumu-gerceklestirecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/afganistan-55-mw-gucunde-3-hibrit-ges-kurulumu-gerceklestirecek\/","title":{"rendered":"(Turkish) Afganistan 55 MW G\u00fcc\u00fcnde 3 Hibrit GES Kurulumu Ger\u00e7ekle\u015ftirecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67270\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Afganistan&#8217;da, toplamda 55 MW g\u00fcc\u00fcnde \u00fc\u00e7 ayr\u0131 hibrit g\u00fcne\u015f enerjisi projesine y\u00f6nelik ihale\u00a0yap\u0131lacak.<\/strong><\/p>\n<p>Elektri\u011fe eri\u015fim oran\u0131n\u0131n sadece y\u00fczde 30 oldu\u011fu Afganistan y\u00fcz\u00fcn\u00fc art\u0131k yenilenebilir enerji yat\u0131r\u0131mlar\u0131na d\u00f6n\u00fcyor.\u00a0Afganistan <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/afganistan-55-mw-gucunde-3-hibrit-ges-kurulumu-gerceklestirecek.png\"><img loading=\"lazy\" class=\"alignleft  wp-image-67271\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/afganistan-55-mw-gucunde-3-hibrit-ges-kurulumu-gerceklestirecek-300x118.png\" alt=\"afganistan-55-mw-gucunde-3-hibrit-ges-kurulumu-gerceklestirecek\" width=\"300\" height=\"144\" \/><\/a>Ulusal \u0130hale Kurumu taraf\u0131ndan Celalabat&#8217;ta 40 MW, Host&#8217;ta 10 MW ve Daykundi&#8217;de 5 MW olmak \u00fczere toplam olarak 55 MW\u2019l\u0131k hibrit g\u00fcne\u015f enerjisi projelerine y\u00f6nelik ihale ger\u00e7ekle\u015ftirilecek. \u0130haleler i\u00e7in 7, 8 ve 10 Ekim 2017 tarihlerine kadar teklif ler verilecek.<\/p>\n<p>Afganistan Enerji ve Su Bakanl\u0131\u011f\u0131&#8217;n\u0131n ise 2020&#8217;ye kadar 500 MW g\u00fcne\u015f santrali kurulumu hedefi bulunmaktad\u0131r. \u00dclkenin yenilenebilir enerji politikas\u0131 do\u011frultusunda\u00a02030&#8217;a kadar 4-5 GW g\u00fcc\u00fcnde yeni yenilenebilir enerji kapasitesinin hayata ge\u00e7irilmesi planlanmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Afganistan&#8217;da, toplamda 55 MW g\u00fcc\u00fcnde \u00fc\u00e7 ayr\u0131 hibrit g\u00fcne\u015f enerjisi projesine y\u00f6nelik ihale\u00a0yap\u0131lacak. Elektri\u011fe eri\u015fim oran\u0131n\u0131n sadece y\u00fczde 30 oldu\u011fu Afganistan y\u00fcz\u00fcn\u00fc art\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[1624,2326,23416,2569,23133,34925,23131,35307],"views":1366,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67270"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67270"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67270\/revisions"}],"predecessor-version":[{"id":67272,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67270\/revisions\/67272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67271"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}