{"id":67230,"date":"2017-09-09T14:32:43","date_gmt":"2017-09-09T11:32:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67230"},"modified":"2017-09-09T14:32:43","modified_gmt":"2017-09-09T11:32:43","slug":"aksa-enerjinin-madagaskar-santralindeki-ilk-faz-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-madagaskar-santralindeki-ilk-faz-tamamlandi\/","title":{"rendered":"(Turkish) Aksa Enerji&#8217;nin Madagaskar Santralindeki \u0130lk Faz Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67230\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #0a0a0a;\"><strong>Aksa Enerji \u00dcretim A\u015e taraf\u0131ndan Madagaskar kurulumu devam eden enerji santralinin 66 mw kurulu g\u00fc\u00e7teki ilk faz\u0131 tamamlan<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/aksa-ile-enerjiniz-hic-bitmesin.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-39993\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/aksa-ile-enerjiniz-hic-bitmesin.jpg\" alt=\"aksa-ile-enerjiniz-hic-bitmesin\" width=\"300\" height=\"263\" \/><\/a>d\u0131.<\/strong><\/p>\n<p>Aksa firmas\u0131n\u0131n Kamuyu Ayd\u0131nlatma Paltformu\u2019nda (KAP) yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, santralin 5 Eyl\u00fcl tarihinde i\u015fletmeye al\u0131nd\u0131\u011f\u0131\u00a0a\u00e7\u0131kland\u0131.<\/p>\n<p>Santralin 54 mw g\u00fc\u00e7teki ikinci faz\u0131n\u0131n ise b\u00f6lgedeki iletim hatlar\u0131n\u0131n tamamlanmas\u0131n\u0131n ard\u0131ndan devreye girmesinin planlad\u0131\u011f\u0131n\u0131n belirtildi\u011fi a\u00e7\u0131klamada, \u015fu ifadeler kullan\u0131ld\u0131.<\/p>\n<p>\u201cMadagaskar enerji santralimizin 66 mw kurulu g\u00fc\u00e7teki ilk faz\u0131 tamamlanarak 5 Eyl\u00fcl\u2019de bakanl\u0131k taraf\u0131ndan ticari i\u015fletmeye al\u0131nm\u0131\u015f olunup 6 mw yedek motorlardan olu\u015fan santralde s\u00f6zle\u015fme gere\u011fi belirtilen kapasiteye ula\u015f\u0131lm\u0131\u015ft\u0131r. ABD dolar\u0131 cinsinden 20 y\u0131l s\u00fcreli garantili al\u0131m anla\u015fmas\u0131 \u00e7er\u00e7evesinde enerji \u00fcretecek olan Madagaskar santralimiz, d\u00f6viz bor\u00e7lulu\u011fumuzu do\u011fal bir mekanizma ile hedge etmemizi, karl\u0131l\u0131\u011f\u0131m\u0131z\u0131 art\u0131rmam\u0131z\u0131 ve sat\u0131\u015f hacmimizi y\u00fckseltecektir.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji \u00dcretim A\u015e taraf\u0131ndan Madagaskar kurulumu devam eden enerji santralinin 66 mw kurulu g\u00fc\u00e7teki ilk faz\u0131 tamamland\u0131. Aksa firmas\u0131n\u0131n Kamuyu Ayd\u0131nlatma [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[1571,2838,35298,5436,35299,33665],"views":821,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67230"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67230"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67230\/revisions"}],"predecessor-version":[{"id":67231,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67230\/revisions\/67231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}