{"id":67095,"date":"2017-09-05T09:21:01","date_gmt":"2017-09-05T06:21:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67095"},"modified":"2017-09-05T09:22:07","modified_gmt":"2017-09-05T06:22:07","slug":"bornova-belediyesi-fotovoltaik-guc-tesisinden-kar-elde-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bornova-belediyesi-fotovoltaik-guc-tesisinden-kar-elde-etti\/","title":{"rendered":"(Turkish) Bornova Belediyesi Fotovoltaik G\u00fc\u00e7 Tesisinden Kar Elde Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67095\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130zmir Kalk\u0131nma Ajans\u0131 taraf\u0131ndan (\u0130ZKA) hibe deste\u011fi alarak 820 bin liral\u0131k yat\u0131r\u0131m\u00a0bedelinin 234 bin liras\u0131n\u0131 kar\u015f\u0131layan\u00a0Bornova Belediyesi&#8217;nin 300 kw&#8217;l\u0131k Fotovoltaik G\u00fc\u00e7 Tesisi&#8217;nde 2014 sonundan g\u00fcn\u00fcm\u00fcze\u00a0kadar \u00fcretti\u011fi elektri\u011fin parasal k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-67096\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi-300x171.jpg\" alt=\"bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi\" width=\"300\" height=\"171\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi-300x171.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi-500x285.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/bornova-belediyesi-fotovoltaik-guc-tesisi-ile-kar-sagladi.jpg 698w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ar\u015f\u0131l\u0131\u011f\u0131 410 bin liraya ula\u015ft\u0131.<\/strong><\/p>\n<p>Erzene Mahallesi&#8217;nde g\u00fcne\u015f panellerinin kuruldu\u011fu\u00a07 d\u00f6n\u00fcml\u00fck arazi de faaliyete ge\u00e7en\u00a0Fotovoltaik G\u00fc\u00e7 Tesisi, da\u011f\u0131t\u0131m \u015febekesine verilen elektri\u011fin bedeli ile yat\u0131r\u0131m maliyetini kar\u015f\u0131lay\u0131p kar etmeye ba\u015flad\u0131.<\/p>\n<p>Santralin bir y\u0131ll\u0131k s\u00fcre\u00e7te toplam kar miktar\u0131 176 bin liraya buldu.\u00a02013&#8217;te \u00e7al\u0131\u015fmalara ba\u015flayan ve 2014&#8217;\u00fcn sonunda \u00fcretime ge\u00e7mi\u015f olan tesis, 2014&#8217;\u00fcn son iki ay\u0131nda 6 bin 250, 2015 y\u0131l\u0131nda 150 bin lira, 2016 y\u0131l\u0131nda 163 bin 500 lira tutara kar\u015f\u0131l\u0131k gelen elektrik \u00fcretimi sa\u011flad\u0131. 2017 y\u0131l\u0131n\u0131n ilk alt\u0131 ay\u0131ndaki \u00fcretimin parasal kar\u015f\u0131l\u0131\u011f\u0131 ise 87 bin liraya ula\u015ft\u0131. \u00dcretilen elektrik enerji da\u011f\u0131t\u0131m \u015febekesine verilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130zmir Kalk\u0131nma Ajans\u0131 taraf\u0131ndan (\u0130ZKA) hibe deste\u011fi alarak 820 bin liral\u0131k yat\u0131r\u0131m\u00a0bedelinin 234 bin liras\u0131n\u0131 kar\u015f\u0131layan\u00a0Bornova Belediyesi&#8217;nin 300 kw&#8217;l\u0131k Fotovoltaik G\u00fc\u00e7 Tesisi&#8217;nde 2014 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67096,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[3527,67,1009,34923,23311,35241,35240,2326,23416,2569,23133,34925,2401,23131,5411,2689,1429],"views":1200,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67095"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67095"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67095\/revisions"}],"predecessor-version":[{"id":67099,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67095\/revisions\/67099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67096"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}