{"id":67070,"date":"2017-09-04T13:50:12","date_gmt":"2017-09-04T10:50:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=67070"},"modified":"2017-09-04T13:50:50","modified_gmt":"2017-09-04T10:50:50","slug":"ingilterenin-gunesi-127-gw-sinirini-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ingilterenin-gunesi-127-gw-sinirini-asti\/","title":{"rendered":"(Turkish) \u0130ngiltere&#8217;nin G\u00fcne\u015fi 12,7 GW S\u0131n\u0131r\u0131n\u0131 A\u015ft\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/67070\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>\u0130ngiltere\u2019de g\u00fcne\u015f enerjisi<img loading=\"lazy\" class=\"alignright wp-image-67071 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ingilterenin-gunesi-127-gw-sinirini-asti-300x163.jpg\" alt=\"ingilterenin-gunesi-127-gw-sinirini-asti\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ingilterenin-gunesi-127-gw-sinirini-asti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ingilterenin-gunesi-127-gw-sinirini-asti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/09\/ingilterenin-gunesi-127-gw-sinirini-asti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ne dayal\u0131 elektrik \u00fcretim kapasitesi 2017\u2019nin ilk yar\u0131s\u0131nda 848 MW\u00a0art\u0131\u015f g\u00f6sterdi.<\/strong><\/p>\n<p>Birle\u015fik Krall\u0131k Ekonomi, Enerji ve Sanayi Stratejisi Bakanl\u0131\u011f\u0131&#8217;nca a\u00e7\u0131klanan tahmini\u00a0verilere g\u00f6re \u00fclkedeki kurulumlar\u0131n toplam say\u0131s\u0131 919.872 olurken, bu kurulumlar\u0131n toplam g\u00fcc\u00fc ise 12.720 MW\u2019a\u00a0\u00e7\u0131kt\u0131.<\/p>\n<p>Verilere g\u00f6re bu g\u00fcc\u00fcn 2.496 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fc 4 kW alt\u0131 sistemler, 207 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fc ise 4 ila 10 kW aras\u0131 kurulumlardan meydana gelmektedir. 5 MW ve \u00fczeri g\u00fcce sahip kurulumlar\u0131n pay\u0131 ise 5.900 MW\u2019a y\u00fckseldi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130ngiltere\u2019de g\u00fcne\u015f enerjisine dayal\u0131 elektrik \u00fcretim kapasitesi 2017\u2019nin ilk yar\u0131s\u0131nda 848 MW\u00a0art\u0131\u015f g\u00f6sterdi. Birle\u015fik Krall\u0131k Ekonomi, Enerji ve Sanayi Stratejisi Bakanl\u0131\u011f\u0131&#8217;nca a\u00e7\u0131klanan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":67071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,18007],"tags":[67,1009,34923,23311,1169,23416,2569,1876,23133,34925,2401,23131,1092],"views":942,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67070"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=67070"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67070\/revisions"}],"predecessor-version":[{"id":67072,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/67070\/revisions\/67072"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/67071"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=67070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=67070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=67070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}