{"id":66919,"date":"2017-08-29T10:38:37","date_gmt":"2017-08-29T07:38:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66919"},"modified":"2017-08-29T10:41:06","modified_gmt":"2017-08-29T07:41:06","slug":"denizliye-14mwlik-yeni-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/denizliye-14mwlik-yeni-ges-yatirimi\/","title":{"rendered":"(Turkish) Denizli&#8217;ye 14MW&#8217;l\u0131k Yeni Ges Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66919\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ge\u00e7ti\u011fimiz aylarda InTEC Energy Solutions firmas\u0131yla ortakl\u0131k imzalad\u0131\u011f\u0131n\u0131 duyuran Prime Enerji, Denizli iline yap\u0131lacak g\u00fcne\u015f enerjisi santralinin kurulumu i\u00e7in Bereket Enerji ile anla\u015ft\u0131.<\/strong><\/p>\n<p>Almanya merkezli InTEC Energy Solutions firmas\u0131 ve Prime Enerji ge\u00e7ti\u011fimiz hafta yeni bir GES projesine imza att\u0131.<\/p>\n<p>Denizli b\u00f6lgesinde yat\u0131r\u0131m\u0131 yap\u0131lacak projenin toplam g\u00fcc\u00fc 14 MW. \u00c7eltik\u00e7i b\u00f6lgesine yap\u0131lacak yat\u0131r\u0131m i\u00e7in toplamda 52.335 adet panel, 13 adet merkezi inverter kullan\u0131lacak. Projenin m\u00fchendislik, kurulum, sat\u0131nalma, elektrik ve in\u015faat i\u015flerinin tamam\u0131n\u0131 Prime Enerji ve InTEC Energy Solutions beraber \u00fcstlenecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-66920\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-300x200.jpg\" alt=\"denizli-yeni-ges-yatirimi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/denizli-yeni-ges-yatirimi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Yine Prime Enerji ve InTEC Energy Solutions\u2019\u0131n ortakla\u015fa \u00e7al\u0131\u015faca\u011f\u0131 Erzurum projesine ait saha d\u00fczeltme \u00e7al\u0131\u015fmalar\u0131 i\u00e7in\u00a0imzalar at\u0131ld\u0131. Erzurum projesinin toplam g\u00fcc\u00fc 11.8MWp.<\/p>\n<p><strong>ANAHTAR TESL\u0130M G\u00dcNE\u015e ENERJ\u0130S\u0130 SANTRAL KURUMLARI DEVAM ED\u0130YOR<\/strong><\/p>\n<p>Ge\u00e7ti\u011fimiz ay imzalanan ve Sivas ili\u00a0 b\u00f6lgesinde yat\u0131r\u0131m\u0131 yap\u0131lan 11MW g\u00fcc\u00fcndeki g\u00fcne\u015f enerjisi santralinin 3,51 MWp\u2019lik k\u0131sm\u0131n\u0131n kurulum ve ge\u00e7ici kabulu yap\u0131ld\u0131. Projenin ikinci etab\u0131 olan 2,34 MWp\u2019lik k\u0131sm\u0131n\u0131n kurulumu son a\u015famada, bayramdan sonra ge\u00e7ici kabul i\u00e7in ba\u015fvuru yap\u0131lacak.<\/p>\n<p>Toplamda 4 MW g\u00fcc\u00fcndeki anahtar teslim Bal\u0131kesir ve Bursa projelerinde saha d\u00fczeltmeleri devam ediyor.<\/p>\n<p>Prime Enerji\u2019nin portf\u00f6y\u00fcnde; \u00fclkemizin farkl\u0131 b\u00f6lgelerinde yapm\u0131\u015f oldu\u011fu GES projeleri ile Konya Meram b\u00f6lgesindeki enerji nakil hatlar\u0131 ve hala devam eden Aksaray, Ni\u011fde, K\u0131r\u015fehir b\u00f6lgelerindeki \u015fantiyeleri mevcut. InTEC Energy Solutions, uluslararas\u0131 yat\u0131r\u0131mc\u0131lar ve kamu kurumlar\u0131na dan\u0131\u015fmanl\u0131k hizmeti vermeye devam etmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ge\u00e7ti\u011fimiz aylarda InTEC Energy Solutions firmas\u0131yla ortakl\u0131k imzalad\u0131\u011f\u0131n\u0131 duyuran Prime Enerji, Denizli iline yap\u0131lacak g\u00fcne\u015f enerjisi santralinin kurulumu i\u00e7in Bereket Enerji ile anla\u015ft\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66920,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[35158,845,67,1009,34923,23311,2326,2569,34898,33731],"views":1120,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66919"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66919"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66919\/revisions"}],"predecessor-version":[{"id":66922,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66919\/revisions\/66922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66920"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}