{"id":66889,"date":"2017-08-27T14:52:40","date_gmt":"2017-08-27T11:52:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66889"},"modified":"2017-08-27T14:53:17","modified_gmt":"2017-08-27T11:53:17","slug":"aksa-enerjinin-afrikadaki-santrallerinin-gucu-2-426-mwa-yukseldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerjinin-afrikadaki-santrallerinin-gucu-2-426-mwa-yukseldi\/","title":{"rendered":"(Turkish) Aksa Enerji\u2019nin Afrika&#8217;daki Santrallerinin G\u00fcc\u00fc 2.426 MW&#8217;a Y\u00fckseldi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66889\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">\u00dclkemizde\u00a0rekabet g\u00fcc\u00fc azalan santrallerini y\u00fcksek kapasite kullan\u0131m oranlar\u0131yla \u00e7al\u0131\u015ft\u0131rabilmek y\u00f6nelik yeni rotas\u0131n\u0131 Afr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/aksa-ile-enerjiniz-hic-bitmesin.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-39993\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/aksa-ile-enerjiniz-hic-bitmesin.jpg\" alt=\"aksa-ile-enerjiniz-hic-bitmesin\" width=\"300\" height=\"268\" \/><\/a>ika\u2019ya \u00e7eviren Aksa Enerji taraf\u0131ndan Afrika \u00fclkelerindeki acil enerji ihtiyac\u0131na santraller ile\u00a0\u00e7\u00f6z\u00fcmler sunuluyor.<\/span><\/strong><\/p>\n<p>\u015eirketin Gana Cumhuriyeti\u2019ndeki HFO santralinin g\u00fcc\u00fc 192,5 MW\u2019tan 280 MW\u2019a; Madagaskar Cumhuriyeti\u2019ndeki HFO santralinin kurulu g\u00fcc\u00fc ise 36 MW\u2019tan 50 MW\u2019a \u00e7\u0131kar\u0131ld\u0131\u00a0ve Mali Santrali ise 10 MW ile ticari faaliyetine de ba\u015flad\u0131.<\/p>\n<p>Aksa Enerji Grup Ba\u015fkan\u0131, CEO ve Y\u00f6netim Kurulu \u00dcyesi C\u00fcneyt Uygun taraf\u0131ndan,\u00a0Afrika\u2019da insanlar\u0131n yakla\u015f\u0131k be\u015fte birinin elektri\u011fe hi\u00e7 ula\u015famad\u0131\u011f\u0131n\u0131 bu y\u00fczden de \u00f6ncelikle ihtiya\u00e7 olan yerde \u00e7\u00f6z\u00fcm \u00fcretmeyi tercih ettiklerini, y\u00fczde 58,35\u2019i Aksa Enerji\u2019ye, y\u00fczde 41,65\u2019i yerel orta\u011fa ait olan\u00a0Mauritius\u2019da yerle\u015fik Aksa Power ad\u0131nda bir \u015firketin kuruldu\u011funu ve Santralin ise y\u0131lda 500.000 MWsa \u00fcretim yapmas\u0131 \u00f6ng\u00f6r\u00fcld\u00fc\u011f\u00fc a\u00e7\u0131kland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00dclkemizde\u00a0rekabet g\u00fcc\u00fc azalan santrallerini y\u00fcksek kapasite kullan\u0131m oranlar\u0131yla \u00e7al\u0131\u015ft\u0131rabilmek y\u00f6nelik yeni rotas\u0131n\u0131 Afrika\u2019ya \u00e7eviren Aksa Enerji taraf\u0131ndan Afrika \u00fclkelerindeki acil enerji ihtiyac\u0131na santraller [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48944,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[1976,1571,68,67,1009,34923,23311,33664,33754,24797,33665,35133],"views":1231,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66889"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66889"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66889\/revisions"}],"predecessor-version":[{"id":66890,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66889\/revisions\/66890"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48944"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}