{"id":66870,"date":"2017-08-26T21:33:56","date_gmt":"2017-08-26T18:33:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66870"},"modified":"2017-08-26T21:35:35","modified_gmt":"2017-08-26T18:35:35","slug":"karaman-a-1-4-mw-gucunde-biyokutle-tesisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi\/","title":{"rendered":"(Turkish) Karaman&#8217;a 1,4 MW G\u00fcc\u00fcnde Biyok\u00fctle Tesisi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66870\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Karaman Yenilenebilir Enerji \u00dcretim A.\u015e. Karaman \u0130li, Merkez \u0130l\u00e7esi, Barutkavuran K\u00f6y\u00fc&#8217;nde biyok\u00fctle santrali ile\u00a0hayv<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-66871\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi-300x204.jpg\" alt=\"karaman-a-1-4-mw-gucunde-biyokutle-tesisi\" width=\"300\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi-300x204.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/karaman-a-1-4-mw-gucunde-biyokutle-tesisi.jpg 484w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>an d\u0131\u015fk\u0131s\u0131 ve m\u0131s\u0131r silaj\u0131ndan elektrik, \u0131s\u0131 ve g\u00fcbre \u00fcretimi ger\u00e7ekle\u015ftiriliyor.<\/strong><\/p>\n<p>Daha \u00f6nceden\u00a0kurulmu\u015f olan\u00a0Hayvansal At\u0131klardan ve Taze Bitkilerden Biyogaz (Elektrik) ve G\u00fcbre \u00dcretim Tesisi istenilen verim al\u0131namad\u0131\u011f\u0131ndan tesisin \u00fcretim y\u00f6nteminde de\u011fi\u015fiklik yap\u0131ld\u0131. 7.500.000 TL yat\u0131r\u0131m bedeline sahip proje ile\u00a0tesiste kullan\u0131lacak b\u00fcy\u00fck ba\u015f hayvan d\u0131\u015fk\u0131lar\u0131 (kat\u0131+s\u0131v\u0131) ve tavuk d\u0131\u015fk\u0131lar\u0131yla m\u0131s\u0131r silaj\u0131 yak\u0131n \u00e7evredeki \u00e7iftliklerden\u00a0sa\u011flanmaktad\u0131r.<\/p>\n<p>Tesiste g\u00fcnde 1,414 MWe g\u00fcc\u00fcnde elektrik enerjisi, 1,5 MWt g\u00fcc\u00fcnde termal (\u0131s\u0131) enerjisi, 20 ton\/g\u00fcn kompost kat\u0131 g\u00fcbre ve 150 ton\/g\u00fcn s\u0131v\u0131 g\u00fcbre \u00fcretimi\u00a0yap\u0131lmakta ve\u00a0g\u00fcnl\u00fck 90 ton tavuk d\u0131\u015fk\u0131s\u0131, 5 ton b\u00fcy\u00fckba\u015f hayvan d\u0131\u015fk\u0131s\u0131 olmak \u00fczere toplam 95 ton\/g\u00fcn at\u0131k i\u015flenmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Karaman Yenilenebilir Enerji \u00dcretim A.\u015e. Karaman \u0130li, Merkez \u0130l\u00e7esi, Barutkavuran K\u00f6y\u00fc&#8217;nde biyok\u00fctle santrali ile\u00a0hayvan d\u0131\u015fk\u0131s\u0131 ve m\u0131s\u0131r silaj\u0131ndan elektrik, \u0131s\u0131 ve g\u00fcbre \u00fcretimi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66871,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[1678,35122,29816,35124,1484,35123,68,67,1009,34923,23311,1679,35125],"views":3619,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66870"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66870"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66870\/revisions"}],"predecessor-version":[{"id":66874,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66870\/revisions\/66874"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66871"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66870"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66870"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66870"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}