{"id":66864,"date":"2017-08-26T18:42:02","date_gmt":"2017-08-26T15:42:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66864"},"modified":"2017-08-26T18:42:58","modified_gmt":"2017-08-26T15:42:58","slug":"hindistanin-en-ucuz-enerji-kaynagi-gunes-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistanin-en-ucuz-enerji-kaynagi-gunes-oldu\/","title":{"rendered":"(Turkish) Hindistan\u2019\u0131n En Ucuz Enerji Kayna\u011f\u0131 G\u00fcne\u015f Oldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66864\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #222222;\">Hindistan, g\u00fcne\u015f elektri\u011fi al\u0131m fiyatlar\u0131nda yeni bir rekora imza att\u0131.<\/span><\/strong><\/p>\n<p>Hindistan&#8217;\u0131n\u00a0Madhya Pradesh ey<img loading=\"lazy\" class=\"alignleft size-medium wp-image-50051\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gunes-elektrigi-fiyati-hindistanda-komurun-altina-indi-300x163.jpg\" alt=\"gunes-elektrigi-fiyati-hindistanda-komurun-altina-indi\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gunes-elektrigi-fiyati-hindistanda-komurun-altina-indi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gunes-elektrigi-fiyati-hindistanda-komurun-altina-indi-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/02\/gunes-elektrigi-fiyati-hindistanda-komurun-altina-indi.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>aletinde \u015eubat ay\u0131nda\u00a0her biri 250 MW, toplamda ise 750 MW\u2019l\u0131k kapasitelik \u00fc\u00e7 proje hakk\u0131 i\u00e7in yap\u0131lan\u00a0yar\u0131\u015fmada en d\u00fc\u015f\u00fck fiyat kilovat-saat ba\u015f\u0131na 2,97 Rupi\u00a0 (4,4 Dolar-sent) oldu.<\/p>\n<p>Hindistanl\u0131 g\u00fcne\u015f enerjisi sekt\u00f6r\u00fc uzmanlar\u0131n\u0131n a\u00e7\u0131klamalar\u0131na g\u00f6re in\u015fa edilecek santrallerin ya\u015fam \u00f6mr\u00fcn\u00fc dikkate alarak hesaplanan seviyelendirilmi\u015f al\u0131m fiyat\u0131 ise 3,27 Rupi\/kWh olarak ger\u00e7ekle\u015fti. Al\u0131m fiyatlar\u0131 15 y\u0131ll\u0131\u011f\u0131na ge\u00e7erli olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hindistan, g\u00fcne\u015f elektri\u011fi al\u0131m fiyatlar\u0131nda yeni bir rekora imza att\u0131. Hindistan&#8217;\u0131n\u00a0Madhya Pradesh eyaletinde \u015eubat ay\u0131nda\u00a0her biri 250 MW, toplamda ise 750 MW\u2019l\u0131k kapasitelik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":50051,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,34923,23311,23416,23133,34925,23131,4034,105],"views":979,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66864"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66864"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66864\/revisions"}],"predecessor-version":[{"id":66866,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66864\/revisions\/66866"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/50051"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}