{"id":66814,"date":"2017-08-25T10:50:49","date_gmt":"2017-08-25T07:50:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66814"},"modified":"2017-08-25T10:50:49","modified_gmt":"2017-08-25T07:50:49","slug":"2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak\/","title":{"rendered":"(Turkish) 2017&#8217;de G\u00fcne\u015f&#8217;teki Kurulu G\u00fc\u00e7 N\u00fckleeri Yakalayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66814\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>ABD merkezli ara\u015ft\u0131rma kurulu\u015fu GTM Research taraf\u0131ndan g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn kurulu g<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-66815\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak-300x200.jpg\" alt=\"2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/2017de-gunes-teki-kurulu-guc-nukleeri-yakalayacak.jpg 590w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00fc\u00e7 bak\u0131m\u0131ndan 2017 sonunda n\u00fckleer enerji sekt\u00f6r\u00fcn\u00fc yakalayaca\u011f\u0131 \u00f6ng\u00f6r\u00fcs\u00fcnde bulunuldu.<\/strong><\/p>\n<p>Kurulu\u015f taraf\u0131ndan haz\u0131rlanan son \u00e7al\u0131\u015fmadaki \u00f6ng\u00f6r\u00fclere g\u00f6re k\u00fcresel d\u00fczeydeki g\u00fcne\u015f elektri\u011fi g\u00fcc\u00fc bu y\u0131l 81 GW\u2019l\u0131k art\u0131\u015f ile 390 MW\u2019a ula\u015farak, halihaz\u0131rda 391,4 GW d\u00fczeyinde olan n\u00fckleer enerji reakt\u00f6rlerinin toplam g\u00fcc\u00fcne ula\u015faca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<p>2022 y\u0131l\u0131 sonu itibari ile de k\u00fcresel g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fc 871 GW\u2019a ula\u015farak, hem bug\u00fcnk\u00fc n\u00fckleer enerji kurulu g\u00fcc\u00fcn\u00fcn iki kat\u0131na ula\u015fabilecek hem de o tarihteki k\u00fcm\u00fclatif r\u00fczgar enerjisi g\u00fcc\u00fc ise 43 GW s\u0131n\u0131r\u0131n\u0131 a\u015fabilecektir. N\u00fckleer enerji santralleri 2016 y\u0131l\u0131nda 2.476.671 Gigavat-saatlik (GWh) \u00fcretimle k\u00fcresel elektrik arz\u0131n\u0131n y\u00fczde 11\u2019ini kar\u015f\u0131larken, g\u00fcne\u015f enerjisi santrallerinin ise 375.000 GWh ile y\u00fczde 1,8\u2019ini kar\u015f\u0131lamas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ABD merkezli ara\u015ft\u0131rma kurulu\u015fu GTM Research taraf\u0131ndan g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn kurulu g\u00fc\u00e7 bak\u0131m\u0131ndan 2017 sonunda n\u00fckleer enerji sekt\u00f6r\u00fcn\u00fc yakalayaca\u011f\u0131 \u00f6ng\u00f6r\u00fcs\u00fcnde bulunuldu. Kurulu\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66815,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,43],"tags":[63,67,1009,2698,165,2008,1169,23416,2206,23133,34925,23131],"views":9228,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66814"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66814"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66814\/revisions"}],"predecessor-version":[{"id":66816,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66814\/revisions\/66816"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66815"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}