{"id":66759,"date":"2017-08-23T13:04:08","date_gmt":"2017-08-23T10:04:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66759"},"modified":"2017-08-23T13:05:32","modified_gmt":"2017-08-23T10:05:32","slug":"enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi\/","title":{"rendered":"(Turkish) Enerjisa&#8217;n\u0131n \u0130lk G\u00fcne\u015f Santrali Band\u0131rma\u2019da \u0130\u015fletmeye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66759\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin enerjisi Enerjisa, sadece 2,5 ayda in\u015faat\u0131n\u0131 tamamlad\u0131\u011f\u0131 ilk g\u00fcne\u015f enerjisi santralini Band\u0131rma\u2019da i\u015fletmeye ald\u0131. Yerli ve yenilenebilir enerji portf\u00f6y\u00fcyle milli kaynaklar\u0131n kullan\u0131m\u0131n\u0131 \u00f6nceliklendiren Enerjisa, devreye ald\u0131\u011f\u0131 Band\u0131rma\u2019daki 2 megavatl\u0131k g\u00fcne\u015f enerjisi santraliyle y\u0131lda 1.500 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek enerji \u00fcretecek.<\/strong><\/p>\n<p>G\u00fcne\u015f enerjisinin T\u00fcrkiye\u2019nin elektrik \u00fcretimindeki pay\u0131n\u0131 art\u0131rmak amac\u0131yla yerli ve yenilenebilir enerji portf\u00f6y\u00fcn\u00fc b\u00fcy\u00fctmeye devam eden Enerjisa, ilk g\u00fcne\u015f enerjisi santralini (GES) Band\u0131rma\u2019da i\u015fletmeye ald\u0131. Enerjisa, 2 milyon dolarl\u0131k <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-66760 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi-300x225.jpg\" alt=\"enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/enerjisanin-ilk-gunes-enerjisi-santrali-bandirmada-isletmeye-alindi.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>yat\u0131r\u0131mla 2,5 ayda tamamlad\u0131\u011f\u0131 g\u00fcne\u015f santraliyle yerli ve yenilenebilir enerji \u00fcretimine katk\u0131 sa\u011flayacak.<\/p>\n<p>2 megavat kurulu g\u00fcce sahip Band\u0131rma GES, y\u0131lda toplam 3,5 GWh elektrik \u00fcreterek 1.500 hanenin t\u00fcm enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p><strong>Milli kaynaklar\u0131n kullan\u0131m\u0131n\u0131 hedefliyoruz<\/strong><\/p>\n<p>Yerli ve yenilenebilir enerji kaynaklar\u0131na verdikleri \u00f6nemin alt\u0131n\u0131 \u00e7izen <strong>Enerjisa CEO\u2019su K\u0131van\u00e7 Zaimler<\/strong>, devreye ald\u0131klar\u0131 ilk g\u00fcne\u015f enerjisi santralinden sonra bu alanda ba\u015flayan yat\u0131r\u0131mlar\u0131na devam edeceklerini, k\u0131sa s\u00fcre i\u00e7erisinde 7 megavatl\u0131k ikinci g\u00fcne\u015f enerjisi santralini ve di\u011fer iki GES projesini daha devreye alacaklar\u0131n\u0131 belirtti. Zaimler, yat\u0131r\u0131mlar\u0131 planlarken T\u00fcrkiye\u2019nin elektrik \u00fcretiminde milli kaynaklar\u0131n kullan\u0131m\u0131 hedefine katk\u0131da bulunmaya devam ettiklerini belirterek, \u201cT\u00fcrkiye\u2019de cari a\u00e7\u0131\u011f\u0131n en b\u00fcy\u00fck kalemlerimden bir tanesini olu\u015fturan enerji ithalat\u0131 milli kaynaklar\u0131n daha fazla kullan\u0131larak yarat\u0131lacak katma de\u011fer ve art\u0131r\u0131lacak istihdam yan\u0131nda enerji ithalat\u0131m\u0131z\u0131 ve dolay\u0131s\u0131yla enerji ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde azaltacak. Cari a\u00e7\u0131\u011f\u0131n ve d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n azalt\u0131lmas\u0131, sekt\u00f6r\u00fcm\u00fczde milli kaynaklar\u0131n kullan\u0131lmas\u0131, AR-GE ve enerji teknolojilerinin daha da geli\u015ftirilmesiyle m\u00fcmk\u00fcn olacak. Enerji Bakanl\u0131\u011f\u0131\u2019m\u0131z\u0131n da stratejik odak alanlar\u0131ndan biri olan yenilenebilir enerji alan\u0131nda r\u00fczgar ve g\u00fcne\u015f enerjisi santrallerine yat\u0131r\u0131m yapmaya, b\u00fcy\u00fcme planlar\u0131m\u0131zda bu alana odaklanmaya devam edece\u011fiz. G\u00fcne\u015f enerjisinde bizim i\u00e7in ilk olan Band\u0131rma\u2019daki santralimizle birlikte yat\u0131r\u0131mlar\u0131m\u0131z\u0131 s\u00fcrd\u00fcrecek ve y\u0131lsonuna kadar toplam d\u00f6rt g\u00fcne\u015f enerjisi santralini devreye alaca\u011f\u0131z. Yeni santrallerimizin \u00fclkemize hay\u0131rl\u0131 olmas\u0131n\u0131 dilerim\u201d dedi.<\/p>\n<p>&nbsp;<\/p>\n<p>Avrupa ve di\u011fer d\u00fcnya devletlerine g\u00f6re \u00fclkemizin g\u00fcne\u015f enerjisi potansiyeli ve y\u0131ll\u0131k g\u00fcne\u015flenme s\u00fcresi olduk\u00e7a y\u00fcksek. G\u00fcne\u015f Enerjisi Potansiyeli Atlas\u0131\u2019na (GEPA) g\u00f6re \u00fclkemizde, y\u0131ll\u0131k toplam g\u00fcne\u015flenme s\u00fcresi 2737 saat ve ortalama toplam gelen g\u00fcne\u015f enerjisi miktar\u0131 ise 1527 kWh\/m\u00b2y\u0131l. T\u00fcrkiye, konumu itibariyle g\u00fcne\u015f enerjisi i\u00e7in Avrupa\u2019da \u0130spanya\u2019dan sonra en verimli \u00fclkelerden bir tanesi. D\u00fcnyada ve T\u00fcrkiye\u2019de yenilenebilir enerji kaynaklar\u0131 aras\u0131nda olduk\u00e7a \u00f6nemli bir yere sahip olan g\u00fcne\u015f enerjisinin elektrik \u00fcretimindeki pay\u0131 g\u00fcn ge\u00e7tik\u00e7e artmaya devam ediyor ve Enerjisa\u2019n\u0131n da bu alanda yapt\u0131\u011f\u0131 yat\u0131r\u0131mlar devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin enerjisi Enerjisa, sadece 2,5 ayda in\u015faat\u0131n\u0131 tamamlad\u0131\u011f\u0131 ilk g\u00fcne\u015f enerjisi santralini Band\u0131rma\u2019da i\u015fletmeye ald\u0131. Yerli ve yenilenebilir enerji portf\u00f6y\u00fcyle milli kaynaklar\u0131n kullan\u0131m\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66760,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[11832,67,1009,34923,23311,422,2326,23416,2569,23133,34925,23131,21689,105],"views":2046,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66759"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66759"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66759\/revisions"}],"predecessor-version":[{"id":66763,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66759\/revisions\/66763"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66760"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}