{"id":66699,"date":"2017-08-21T15:12:06","date_gmt":"2017-08-21T12:12:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66699"},"modified":"2017-08-22T14:33:51","modified_gmt":"2017-08-22T11:33:51","slug":"turkiyenin-ilk-dual-flash-teknolojili-jeotermal-enerji-santrali-22-6-mw-efe-6-uretime-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-ilk-dual-flash-teknolojili-jeotermal-enerji-santrali-22-6-mw-efe-6-uretime-basladi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin \u0130lk \u201cDual-Flash&#8221; Teknolojili JES&#8217;i 22.6 MW EFE 6 Art\u0131k Faaliyette&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66699\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin Jeotermal Enerji Sekt\u00f6r\u00fcnde ilk \u201cdual-flash&#8221; teknolojili jeotermal enerji santralini kuran ve bu alanda \u00fclkemizdeki en b\u00fcy\u00fck yat\u0131r\u0131mc\u0131 olan G\u00dcR\u0130\u015e HOLD\u0130NG, jeotermal enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131na 2017 senesinde de devam ediyor. <\/strong><\/p>\n<p>Ayd\u0131n ili Germencik il\u00e7esinde yap\u0131m\u0131 tamamlanan, 22,6 MW kapasiteli EFE 6 Jeotermal Enerji Santrali\u2019nin devreye al\u0131nmas\u0131yla, y\u0131lda 190.000.000 kWh elektrik \u00fcretilecek olup, 80.000 hanenin elektrik ihtiyac\u0131 milli kaynaklar kullan\u0131la<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-66700\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi-300x168.jpg\" alt=\"turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/turkiyenin-en-buyuk-jeotermal-santrali-22-6-mw-efe-6-uretime-basladi.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>rak kar\u015f\u0131lanm\u0131\u015f olacakt\u0131r. 1958 y\u0131l\u0131nda kurulan ve 2000 y\u0131l\u0131ndan beri yenilenebilir enerji alan\u0131nda yat\u0131r\u0131mlar\u0131n\u0131 devam ettiren G\u00dcR\u0130\u015e HOLD\u0130NG, faaliyete ge\u00e7irmi\u015f oldu\u011fu EFE 6 Jeotermal Enerji Santrali ile 6. jeotermal enerji santralini kurmu\u015f ve jeotermal enerji alan\u0131nda toplam kurulu g\u00fcc\u00fcn\u00fc 184,9 MW\u2019 a \u00e7\u0131kartm\u0131\u015ft\u0131r.<\/p>\n<p>Gerek kurulu g\u00fcc\u00fc gerek toplam \u00fcretimi g\u00f6z \u00f6n\u00fcne al\u0131nd\u0131\u011f\u0131nda G\u00dcR\u0130\u015e HOLD\u0130NG jeotermal enerji sekt\u00f6r\u00fcnde T\u00fcrkiye\u2019nin en b\u00fcy\u00fc\u011f\u00fc olmas\u0131n\u0131n yan\u0131 s\u0131ra, r\u00fczg\u00e2r enerjisinde de zirveyi zorlayan en b\u00fcy\u00fck 2.nci yat\u0131r\u0131mc\u0131s\u0131d\u0131r.<\/p>\n<p>G\u00dcR\u0130\u015e HOLD\u0130NG, 8 R\u00fczg\u00e2r Enerji Santrali (RES), 6 Jeotermal Enerji Santrali (JES) ve 6 Hidroelektrik Santrali (HES) toplamda 20 Ye\u015fil Enerji Santrali ile 767 MW kurulu g\u00fc\u00e7 kapasitesine ula\u015fm\u0131\u015ft\u0131r.<\/p>\n<p>G\u00dcR\u0130\u015e HOLD\u0130NG HAKKINDA:<\/p>\n<p>1958 y\u0131l\u0131nda kurulan ve kuruldu\u011fu g\u00fcnden itibaren Ana M\u00fcteahhit olarak \u00e7al\u0131\u015fan G\u00dcR\u0130\u015e \u0130N\u015eAAT VE M\u00dcHEND\u0130SL\u0130K A.\u015e. 1974 y\u0131l\u0131ndan beri DS\u0130 ve TEK\u2019e (E\u00dcA\u015e) enerji santralleri yapmaktad\u0131r. G\u00dcR\u0130\u015e, \u00fclkemizin artan enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak, enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 azaltmak ve yerli kaynaklardan enerji \u00fcretmek i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin Jeotermal Enerji Sekt\u00f6r\u00fcnde ilk \u201cdual-flash&#8221; teknolojili jeotermal enerji santralini kuran ve bu alanda \u00fclkemizdeki en b\u00fcy\u00fck yat\u0131r\u0131mc\u0131 olan G\u00dcR\u0130\u015e HOLD\u0130NG, jeotermal enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66700,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[7179,35052,35053,67,1009,34923,23311,18950,6320,35056,10686,35055,35040,23226,34986,34985,6322,26829,35054],"views":2256,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66699"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66699"}],"version-history":[{"count":11,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66699\/revisions"}],"predecessor-version":[{"id":66731,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66699\/revisions\/66731"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66700"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}