{"id":66690,"date":"2017-08-21T11:20:41","date_gmt":"2017-08-21T08:20:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66690"},"modified":"2017-08-21T11:21:45","modified_gmt":"2017-08-21T08:21:45","slug":"abd-enerji-sektorunde-dev-satin-alma-gerceklesti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abd-enerji-sektorunde-dev-satin-alma-gerceklesti\/","title":{"rendered":"(Turkish) ABD Enerji Sekt\u00f6r\u00fcnde Dev Sat\u0131n Alma Ger\u00e7ekle\u015fti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66690\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Do\u011falgaz ve jeotermal kaynak<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/romanya-elektrik-iletimi-hatti-icin-dugmeye-basildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-22122\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/romanya-elektrik-iletimi-hatti-icin-dugmeye-basildi-300x200.jpg\" alt=\"elektrik-iletimi-hatti\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/romanya-elektrik-iletimi-hatti-icin-dugmeye-basildi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/romanya-elektrik-iletimi-hatti-icin-dugmeye-basildi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/02\/romanya-elektrik-iletimi-hatti-icin-dugmeye-basildi.jpg 439w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>lar\u0131 kullanarak ABD\u2019nin en b\u00fcy\u00fck elektrik \u00fcreticisi oldu\u011fu iddia edilen ve 26 bin megawatt (MW) kapasitesi olan Calpine firmas\u0131 sat\u0131ld\u0131.<\/span><\/strong><\/p>\n<p>Yar\u0131s\u0131 Teksas\u2019ta olmak \u00fczere \u00fcretiminin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc Kuzey Amerika ve California\u2019da ger\u00e7ekle\u015ftiren Calpine, \u00f6zel sermaye \u015firketi Energy Capital Partners ve bir grup d\u0131\u015f yat\u0131r\u0131mc\u0131 konsorsiyumunca sat\u0131n al\u0131nd\u0131.<\/p>\n<p>Calpine, bir d\u00f6nem g\u00fc\u00e7l\u00fc nakit ak\u0131\u015f\u0131 ve varl\u0131k temeli olmas\u0131na ra\u011fmen hisse\u00a0de\u011ferinde beklentileri yakalayamam\u0131\u015ft\u0131. Dev \u015firketin\u00a011.3 milyar borcu\u00a0oldu\u011fu ifade edilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Do\u011falgaz ve jeotermal kaynaklar\u0131 kullanarak ABD\u2019nin en b\u00fcy\u00fck elektrik \u00fcreticisi oldu\u011fu iddia edilen ve 26 bin megawatt (MW) kapasitesi olan Calpine firmas\u0131 sat\u0131ld\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":22122,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[1198,35049,34979,19638,34980,26353,33693,35050,67,1009,34923,165,23311,35051],"views":949,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66690"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66690"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66690\/revisions"}],"predecessor-version":[{"id":66692,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66690\/revisions\/66692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/22122"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}