{"id":66658,"date":"2017-08-20T19:46:10","date_gmt":"2017-08-20T16:46:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66658"},"modified":"2017-08-20T19:47:30","modified_gmt":"2017-08-20T16:47:30","slug":"avustralyaya-dev-gunes-enerjisi-merkezi-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/avustralyaya-dev-gunes-enerjisi-merkezi-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Avustralya&#8217;ya Dev G\u00fcne\u015f Enerjisi Merkezi Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66658\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcney Avustralya h\u00fck\u00fcmeti taraf\u0131ndan SolarReserve firmas\u0131n\u0131n \u00f6nerdi\u011fi 150MW g\u00fc\u00e7 sa\u011flayacak olan\u00a0g\u00fcne\u015f enerjisi projesine\u00a0olumlu bir ya<img loading=\"lazy\" class=\"alignleft  wp-image-39648\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/05\/kybeleden-sanliurfaya-9-mwlik-gunes-enerjisi-santrali-ges-kurulumu-300x200.jpg\" alt=\"kybeleden-sanliurfaya-9-mwlik-gunes-enerjisi-santrali-ges-kurulumu\" width=\"300\" height=\"230\" \/>kla\u015f\u0131m sergilendi.<\/strong><\/p>\n<p>Firman\u0131n yerle\u015ftirece\u011fi dev boyutlu aynalar ve \u00f6zel yans\u0131t\u0131c\u0131larla g\u00fcne\u015f \u0131\u015f\u0131\u011f\u0131 merkezdeki erimi\u015f tuz kulesine odaklanacak. Saatlerce y\u00fcksek s\u0131cakl\u0131kta tanklarda depolanacak bu tuz ard\u0131ndan \u0131s\u0131 d\u00f6n\u00fc\u015ft\u00fcr\u00fcc\u00fc devreden ge\u00e7erek buhar olu\u015fturacak ve enerji\u00a0sa\u011flanacak. Kurulacak olan santral ile g\u00fcne\u015f bat\u0131m\u0131 sonras\u0131 bile enerji \u00fcretimine devam edecektir.<\/p>\n<p>Daha \u00f6nceden ise Tesla\u2019n\u0131n kuraca\u011f\u0131 100MW kapasiteli lityum bataryal\u0131 kuruluma onay verilmi\u015fti. Aurora ad\u0131 verilen yeni projeyle\u00a0ise\u00a0yakla\u015f\u0131k 500 milyon dolar \u00f6deme ger\u00e7ekle\u015ftirilecek. 2020 y\u0131l\u0131nda devreye al\u0131nd\u0131\u011f\u0131nda\u00a0\u00fclkenin enerji ihtiyac\u0131n\u0131n y\u00fczde 5\u2019ini\u00a0kar\u015f\u0131lam\u0131\u015f olacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcney Avustralya h\u00fck\u00fcmeti taraf\u0131ndan SolarReserve firmas\u0131n\u0131n \u00f6nerdi\u011fi 150MW g\u00fc\u00e7 sa\u011flayacak olan\u00a0g\u00fcne\u015f enerjisi projesine\u00a0olumlu bir yakla\u015f\u0131m sergilendi. Firman\u0131n yerle\u015ftirece\u011fi dev boyutlu aynalar ve \u00f6zel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39648,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,34923,23311,35038,23416,35039,23133,34925,35037,23131,35036,29740],"views":1162,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66658"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66658"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66658\/revisions"}],"predecessor-version":[{"id":66661,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66658\/revisions\/66661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/39648"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}