{"id":66637,"date":"2017-08-19T17:02:25","date_gmt":"2017-08-19T14:02:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66637"},"modified":"2017-08-19T17:04:36","modified_gmt":"2017-08-19T14:04:36","slug":"konya-beysehire-ruzgar-enerjisi-santrali-res-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konya-beysehire-ruzgar-enerjisi-santrali-res-kurulacak\/","title":{"rendered":"(Turkish) Konya Bey\u015fehir\u2019e R\u00fczgar Enerjisi Santrali (RES) Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66637\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Bey\u015fehir\u2019in yine ilklere imza att\u0131\u011f\u0131n\u0131\u00a0belirten Ba\u015fkan \u00d6zaltun taraf\u0131ndan r\u00fczgar santralinin bu y\u0131l ekimde bir k\u0131sm\u0131n\u0131n faaliyete ge\u00e7ece\u011fi bilgisinin al\u0131nd\u0131\u011f\u0131\u00a0ifade edildi.<\/span><\/strong><\/p>\n<p>Yakamanast\u0131r Tabiat Alan\u0131\u2019n<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-41267\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak-300x179.jpg\" alt=\"es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak\" width=\"300\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak-300x179.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak-500x298.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/es-yel-elektrik-konyada-50-mwlik-ruzgar-enerjisi-santrali-res-kuracak.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131n \u00fcst taraflar\u0131 hatta para\u015f\u00fct tepesi, take off denilen yerin biraz \u00fcst k\u0131sm\u0131nda\u00a0yat\u0131r\u0131mc\u0131n\u0131n yapt\u0131rd\u0131\u011f\u0131 yakla\u015f\u0131k 9 adetlik r\u00fczgar t\u00fcrbini in\u015faat\u0131\u00a0s\u00fcrmektedir.<\/p>\n<p>Yat\u0131r\u0131mc\u0131 firman\u0131n \u015fantiye \u015fefi olan Alpkan Kantaro\u011flu yapt\u0131\u011f\u0131 a\u00e7\u0131klamada\u00a0\u201cBey\u015fehir\u2019de 87 metre kule uzunlu\u011fu ve 63 metre kanat uzunlu\u011fuyla 9 t\u00fcrbinlik bir proje haz\u0131rlad\u0131k. Bir tane t\u00fcrbinimiz 2,5 mw elektrik \u00fcretimi ger\u00e7ekle\u015ftirecektir. Toplamda 22,5 mwl\u0131k\u00a0bir enerji \u00fcretimi yap\u0131lacakt\u0131r. 2018 y\u0131l\u0131n\u0131n yar\u0131s\u0131na kadar b\u00fct\u00fcn t\u00fcrbinlerin devreye al\u0131nmas\u0131\u00a0planlanmaktad\u0131r. Ekim&#8217;in sonuna kadar 3 r\u00fczgar t\u00fcrbini devreye girmi\u015f olacakt\u0131r&#8221; dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bey\u015fehir\u2019in yine ilklere imza att\u0131\u011f\u0131n\u0131\u00a0belirten Ba\u015fkan \u00d6zaltun taraf\u0131ndan r\u00fczgar santralinin bu y\u0131l ekimde bir k\u0131sm\u0131n\u0131n faaliyete ge\u00e7ece\u011fi bilgisinin al\u0131nd\u0131\u011f\u0131\u00a0ifade edildi. Yakamanast\u0131r Tabiat Alan\u0131\u2019n\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41267,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[32367,68,63,67,1009,34923,2838,23311,13,474,24949,231,23318,34961,34960,324],"views":4513,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66637"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66637"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66637\/revisions"}],"predecessor-version":[{"id":66641,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66637\/revisions\/66641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41267"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}