{"id":66488,"date":"2017-08-14T12:38:13","date_gmt":"2017-08-14T09:38:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66488"},"modified":"2017-08-14T12:38:13","modified_gmt":"2017-08-14T09:38:13","slug":"batmanin-geslerine-cw-enerji-damgasini-vurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/batmanin-geslerine-cw-enerji-damgasini-vurdu\/","title":{"rendered":"(Turkish) Batman\u2019\u0131n GES\u2019lerine CW Enerji Damgas\u0131n\u0131 Vurdu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66488\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn lider panel \u00fcreticisi CW Enerji, Batman\u2019da 6.6 Megavat kurulu g\u00fcc\u00fcnde g\u00fcne\u015f enerjisi santralinin (GES) kurulumunu ger\u00e7ekle\u015ftirdi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-66489\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu-300x199.jpg\" alt=\"batmanin-geslerine-cw-enerji-damgasini-vurdu\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/batmanin-geslerine-cw-enerji-damgasini-vurdu.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Antalya Organize Sanayi B\u00f6lgesi\u2019nde faaliyet g\u00f6steren CW Enerji\u2019nin CEO\u2019su Tar\u0131k Sarvan, 24.948 panelin kullan\u0131ld\u0131\u011f\u0131 santralde titiz bir \u00e7al\u0131\u015fma s\u00fcrd\u00fcrd\u00fcklerini belirterek, \u201c\u00c7evre dostu, temiz enerji kayna\u011f\u0131 g\u00fcne\u015fi ke\u015ffeden Batman, g\u00fcne\u015f gibi s\u0131n\u0131rs\u0131z ve \u00fccretsiz olan bir kaynaktan sonuna kadar faydalanmay\u0131 hedefliyor. Batman, g\u00fcne\u015flenme a\u00e7\u0131s\u0131ndan \u00e7ok \u015fansl\u0131 bir co\u011frafya. \u00dclke olarak g\u00fcne\u015f enerjisi potansiyelimiz toplam elektrik enerjisi ihtiyac\u0131m\u0131z\u0131n tamam\u0131ndan kat ve kat daha fazlas\u0131n\u0131 tek ba\u015f\u0131na kar\u015f\u0131layabilecek kadar b\u00fcy\u00fck. Biz de CW Enerji olarak yapt\u0131\u011f\u0131m\u0131z ciddi yat\u0131r\u0131m hamleleriyle bu potansiyeli ortaya \u00e7\u0131karmaya devam ediyoruz\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fcn lider panel \u00fcreticisi CW Enerji, Batman\u2019da 6.6 Megavat kurulu g\u00fcc\u00fcnde g\u00fcne\u015f enerjisi santralinin (GES) kurulumunu ger\u00e7ekle\u015ftirdi. Antalya Organize Sanayi B\u00f6lgesi\u2019nde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[2793,34868,67,1009,2698,34923,23311,23416,23133,34925,23131,34869],"views":1586,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66488"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66488"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66488\/revisions"}],"predecessor-version":[{"id":66490,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66488\/revisions\/66490"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66489"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66488"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66488"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}