{"id":66453,"date":"2017-08-13T16:13:55","date_gmt":"2017-08-13T13:13:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66453"},"modified":"2017-08-13T16:28:19","modified_gmt":"2017-08-13T13:28:19","slug":"siirt-ve-vana-318-mwlik-keskin-hes-kurulmasi-planlaniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siirt-ve-vana-318-mwlik-keskin-hes-kurulmasi-planlaniyor\/","title":{"rendered":"(Turkish) Siirt ve Van&#8217;a 318 MW&#8217;l\u0131k Keskin HES Kurulmas\u0131 Planlan\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66453\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Batman Enerji, Siirt &#8211; Pervari \u0130l\u00e7esi ve Van &#8211; \u00c7atak \u0130l\u00e7esinde iki kademe \u015feklinde\u00a0yap\u0131la<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hesler-elektrik-uretirken-dereleri-temizliyor.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-40490\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hesler-elektrik-uretirken-dereleri-temizliyor.jpg\" alt=\"hesler-elektrik-uretirken-dereleri-temizliyor\" width=\"300\" height=\"215\" \/><\/a>cak\u00a0Keskin Baraj\u0131 ve HES Projesi\u2019nin yap\u0131l\u0131p i\u015fletilmesini planlamaktad\u0131r.<\/strong><\/p>\n<p>808.434.097 TL yat\u0131r\u0131m bedeline sahip santral Sinebel Deresi, Belenoluk Deresi ve Botan \u00c7ay\u0131 \u00fczerinde yer alacak. Projenin tamamen i\u015fletmeye al\u0131nmas\u0131yla\u00a0beraber toplam kurulu g\u00fcc\u00fc\u00a0318 MWe\/327,69 MWm olacakt\u0131r. \u0130n\u015faat i\u015flemlerinin yakla\u015f\u0131k 4 y\u0131lda tamamlanmas\u0131 planlan\u0131rken projenin in\u015faat a\u015famas\u0131nda 100 personel, i\u015fletme a\u015famas\u0131nda ise 10 personel \u00e7al\u0131\u015facakt\u0131r.<\/p>\n<p>Halk\u0131 proje hakk\u0131nda bilgilendirmek, g\u00f6r\u00fc\u015f ve \u00f6nerilerini almak amac\u0131yla <strong>07\/09\/2017<\/strong> tarihinde Halk\u0131n Kat\u0131l\u0131m Toplant\u0131s\u0131 yap\u0131lacakt\u0131r.\u00a0Yer ve saat ile ilgili \u00c7ED \u0130zin Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc ve S\u0130\u0130RT \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fcnden bilgi verilmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Batman Enerji, Siirt &#8211; Pervari \u0130l\u00e7esi ve Van &#8211; \u00c7atak \u0130l\u00e7esinde iki kademe \u015feklinde\u00a0yap\u0131lacak\u00a0Keskin Baraj\u0131 ve HES Projesi\u2019nin yap\u0131l\u0131p i\u015fletilmesini planlamaktad\u0131r. 808.434.097 TL [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40490,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[34927,63,1009,34923,23311,34926,26043,1090,26044,34928,5196,4224],"views":2314,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66453"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66453"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66453\/revisions"}],"predecessor-version":[{"id":66459,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66453\/revisions\/66459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40490"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}