{"id":66235,"date":"2017-08-05T12:15:04","date_gmt":"2017-08-05T09:15:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66235"},"modified":"2017-08-05T12:15:04","modified_gmt":"2017-08-05T09:15:04","slug":"yabanci-basindan-dev-yeka-ihalesinin-yansimalari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yabanci-basindan-dev-yeka-ihalesinin-yansimalari\/","title":{"rendered":"(Turkish) Yabanc\u0131 Bas\u0131ndan Dev YEKA \u0130halesinin Yans\u0131malar\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66235\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">T\u00fcrkiye ve\u00a0Almanya aras\u0131nda s\u0131k\u0131nt\u0131lar\u0131n ya\u015fand\u0131\u011f\u0131\u00a0bir d\u00f6nemde T\u00fcrkiye\u2019nin ilk R\u00fczgar <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/yabanci-basindan-dev-yeka-ihalesinin-yansimalari.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-66236\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/yabanci-basindan-dev-yeka-ihalesinin-yansimalari-300x141.jpg\" alt=\"yabanci-basindan-dev-yeka-ihalesinin-yansimalari\" width=\"300\" height=\"166\" \/><\/a>Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesinin Alman Siemens \u015firketi taraf\u0131ndan kazan\u0131lmas\u0131\u00a0dikkatleri \u00fczerine \u00e7ekti.<\/span><\/strong><\/p>\n<p>DWelle T\u00fcrk\u00e7e, YEKA ihalesini Siemens-T\u00fcrkerler-Kalyon konsorsiyumunun kazand\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131\u011f\u0131\u00a0haberde \u201cKonsorsiyum, 1 milyar dolar\u0131n \u00fczerinde r\u00fczgar tesisi yat\u0131r\u0131m\u0131 yapacak\u201d\u00a0a\u00e7\u0131klamalar\u0131na yer verdi.<\/p>\n<p>Euronews ise\u00a0Siemens\u2019in Alman \u015firketi oldu\u011funu belirterek \u201cAlmanya\u2019n\u0131n Siemens&#8217;i T\u00fcrkiye\u2019nin r\u00fczgar enerji projesini kazand\u0131.\u201d ba\u015fl\u0131\u011f\u0131 ile habere yer verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye ve\u00a0Almanya aras\u0131nda s\u0131k\u0131nt\u0131lar\u0131n ya\u015fand\u0131\u011f\u0131\u00a0bir d\u00f6nemde T\u00fcrkiye\u2019nin ilk R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesinin Alman Siemens \u015firketi taraf\u0131ndan kazan\u0131lmas\u0131\u00a0dikkatleri \u00fczerine \u00e7ekti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66236,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[34841,63,67,1009,2698,165,34842,474,69,30145,16,231,23318,22615,4784,1053,34843,34844,25578,31711],"views":1090,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66235"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66235"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66235\/revisions"}],"predecessor-version":[{"id":66237,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66235\/revisions\/66237"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66236"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}