{"id":66212,"date":"2017-08-03T16:10:36","date_gmt":"2017-08-03T13:10:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=66212"},"modified":"2017-08-03T16:10:57","modified_gmt":"2017-08-03T13:10:57","slug":"1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi\/","title":{"rendered":"(Turkish) 2.nci YEKA \u0130halesini T\u00fcrkerler\u2019in Bulundu\u011fu Konsorsiyum Kazand\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/66212\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"text-align: left;\" align=\"center\"><strong>1 milyar dolarl\u0131k R\u00fczg\u00e2r Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesini T\u00fcrkerler, Siemens, Kalyon konsorsiyumu kazand\u0131.<\/strong><\/p>\n<p style=\"text-align: left;\" align=\"center\"><strong>T\u00fcrkerler Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m T\u00fcrker, \u201cT\u00fcrkiye\u2019nin en b\u00fcy\u00fck yenilenebilir enerji yat\u0131r\u0131mc\u0131s\u0131 olmak istiyoruz\u201d dedi.<\/strong><\/p>\n<p style=\"text-align: left;\" align=\"center\"><strong>Konsorsiyum, T\u00fcrkiye\u2019nin ilk yerli r\u00fczgar t\u00fcrbinlerini \u00fcretecek. 100 milyon dolar\u0131n \u00fczerinde yat\u0131r\u0131m maliyeti olan bir r\u00fczgar t\u00fcrbin fa<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-66213\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi-300x246.jpg\" alt=\"1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi\" width=\"300\" height=\"246\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi-300x246.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi-487x400.jpg 487w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi-60x50.jpg 60w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/08\/1-milyar-dolarlik-yeka-ihalesini-turkerlerin-bulundugu-konsorsiyum-kazandi.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>brikas\u0131 kuracak. Fabrikada her biri en az 2,3 megavat g\u00fcc\u00fcnde yerli r\u00fczgar t\u00fcrbini \u00fcretilecek. 1.1 milyon evin elektrik ihtiyac\u0131 r\u00fczgar enerjisiyle kar\u015f\u0131lanacak.<\/strong><\/p>\n<p>Yenilenebilir enerjide T\u00fcrkiye\u2019de yeni bir d\u00f6nem ba\u015fl\u0131yor. Heyecanla beklenen 1 milyar dolarl\u0131k R\u00fczg\u00e2r Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesi ger\u00e7ekle\u015ftirildi. 1.1 milyon evin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layacak projenin ihalesini T\u00fcrkerler Holding, Siemens, Kalyon konsorsiyumu kazand\u0131.<\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019nda a\u00e7\u0131k eksiltme y\u00f6ntemiyle yap\u0131lan ihalede d\u00fcnya r\u00fczg\u00e2r enerjisi piyasas\u0131n\u0131n yakla\u015f\u0131k y\u00fczde 90&#8217;\u0131n\u0131 elinde bulunduran 8 dev yar\u0131\u015ft\u0131. Kilovatsaat ba\u015f\u0131 tavan fiyat\u0131 7 dolar\/centten ba\u015flayan ihale 3,48 dolar\/cent olarak sonu\u00e7land\u0131. Kaz\u0131m T\u00fcrker yapt\u0131\u011f\u0131 ilk a\u00e7\u0131klamada bu rakama r\u00fczgar enerjisini \u00e7ok iyi bilen ekiplerimiz sayesinde d\u00fc\u015ft\u00fcklerinin alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p><strong>\u201cT\u00fcrkerler Holding olarak gururluyuz\u201d <\/strong><\/p>\n<p>T\u00fcrkerler Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m T\u00fcrker, \u201cT\u00fcrkiye\u2019yi enerjide, \u00e7ok daha g\u00fc\u00e7l\u00fc, yeni bir boyuta ta\u015f\u0131yacak projeyi hayata ge\u00e7irme f\u0131rsat\u0131n\u0131 kazanman\u0131n gururunu ya\u015f\u0131yoruz\u201d dedi. Kaz\u0131m T\u00fcrker, \u201cT\u00fcrkerler Holding olarak T\u00fcrkiye\u2019nin en b\u00fcy\u00fck yenilenebilir enerji yat\u0131r\u0131mc\u0131s\u0131 olmak istiyoruz. Bu hedefe emin ad\u0131mlarla ilerliyoruz\u201d diye konu\u015ftu.<\/p>\n<p>Bu projenin bir\u00e7ok y\u00f6n\u00fcyle T\u00fcrkiye ekonomisine b\u00fcy\u00fck katk\u0131 sa\u011flayaca\u011f\u0131n\u0131 kaydeden T\u00fcrker \u015f\u00f6yle konu\u015ftu: \u201cT\u00fcrkiye\u2019de ilk defa yerli t\u00fcrbin \u00fcretimi yapaca\u011f\u0131z. \u00d6te yandan T\u00fcrkerler Holding olarak, Say\u0131n Cumhurba\u015fkan\u0131m\u0131z\u0131n ba\u015flatt\u0131\u011f\u0131 istihdam seferberli\u011fine t\u00fcm T\u00fcrkiye\u2019de bu y\u0131l ger\u00e7ekle\u015ftirece\u011fimiz yeni istihdamlarla \u00f6nc\u00fcl\u00fck etmenin gururunu ya\u015f\u0131yoruz. Buna ek olarak bug\u00fcn sonu\u00e7lanan 1 milyar dolarl\u0131k bu ihalede T\u00fcrk ekonomisine duyulan g\u00fcveni de g\u00f6rm\u00fc\u015f olduk. Bu da bizim i\u00e7in ayr\u0131 bir gurur vesilesi olacakt\u0131r.\u201d<\/p>\n<p>Kaz\u0131m T\u00fcrker \u015f\u00f6yle devam etti: \u201cBug\u00fcn T\u00fcrkiye\u2019nin her zamankinden daha h\u0131zl\u0131 ko\u015fmaya, daha fazla \u00fcretmeye ihtiyac\u0131 oldu\u011funun bilincindeyiz. T\u00fcrkiye ekonomisindeki istikrar\u0131n devam\u0131 i\u00e7in bundan sonra da \u00e7ok daha g\u00fc\u00e7l\u00fc bir \u015fekilde \u00e7al\u0131\u015fmaya, \u00fcretmeye devam edece\u011fiz. Bu vizyonla, faaliyetlerimizi \u00e7ok daha cesur ad\u0131mlarla, daha ileri seviyelere ta\u015f\u0131maya kararl\u0131y\u0131z.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 1 milyar dolarl\u0131k R\u00fczg\u00e2r Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesini T\u00fcrkerler, Siemens, Kalyon konsorsiyumu kazand\u0131. T\u00fcrkerler Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":66213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,2054,8638,474,69,16,231,23318,22615,4784,8637,25578,31711],"views":1200,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66212"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=66212"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66212\/revisions"}],"predecessor-version":[{"id":66215,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/66212\/revisions\/66215"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/66213"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=66212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=66212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=66212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}