{"id":65974,"date":"2017-07-27T22:56:21","date_gmt":"2017-07-27T19:56:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65974"},"modified":"2017-07-28T22:19:37","modified_gmt":"2017-07-28T19:19:37","slug":"ruzgar-yekasi-ihalesine-8-konsorsiyumdan-teklif-geldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-yekasi-ihalesine-8-konsorsiyumdan-teklif-geldi\/","title":{"rendered":"(Turkish) R\u00fczgar YEKA&#8217;s\u0131 \u0130halesine 8 Konsorsiyumdan Teklif Geldi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65974\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">1000 mw&#8217;l\u0131k\u00a0R\u00fczgar\u00a0Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesine tekliflerini sunan firmalar belli oldu. Sekt\u00f6rde \u00f6nde gelen \u015firketlerden meydana gelen\u00a08 konsorsiyum tekliflerini\u00a0verdi.<\/span><\/strong><\/p>\n<h4 style=\"font-weight: 400; color: #111111;\"><strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-65084\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti-300x200.jpg\" alt=\"ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/06\/ruzgar-yarismalarinin-ilk-gununde-eksi-fiyat-cikti.jpg 816w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>TEKL\u0130FLER\u0130N\u0130 SUNAN F\u0130RMALAR<\/strong><\/h4>\n<p>Vestas (Danimarka) \u2013 Enerjisa<br \/>\nSiemens (Almanya) \u2013 T\u00fcrkerler- Kalyon<br \/>\nEnercon (Almanya) \u2013 Polat Enerji \u2013 Limak Enerji<br \/>\nNordex (Almanya) \u2013 \u0130klim Elektrik Yat\u0131r\u0131m \u2013 MKS Marmara \u2013 Zorlu Enerji<br \/>\nSenvion R\u00fczgar Enerjisi \u00c7\u00f6z\u00fcmleri (Almanya) \u2013 IC \u0130\u00e7ta\u015f Enerji<br \/>\nGoldwind (\u00c7in) \u2013 Akfen Holding \u2013 Bey\u00e7elik<br \/>\nGeneral Electric (GE- Amerika) \u2013 Fina Enerji<\/p>\n<p>YEKA yar\u0131\u015fmas\u0131yla\u00a0ilk defa teknoloji alan\u0131nda da yerli \u00fcretim yap\u0131lacak.\u00a0Yar\u0131\u015fmay\u0131 kazanan firma taraf\u0131ndan 100 milyon ABD dolar\u0131 \u00fczerinde yat\u0131r\u0131mla fabrika da kurulacak.<\/p>\n<p>T\u00fcrkiye\u2019nin kurulu r\u00fczgar \u00fcretim kapasitesini y\u00fczde 17 oran\u0131nda art\u0131racak\u00a0ve yat\u0131r\u0131m tutar\u0131 1 milyar dolar olarak hesaplanan 1000mw&#8217;l\u0131k\u00a0r\u00fczgar santrali kurulum ve t\u00fcrbin \u00fcretimi projesinin ihalesinin ise a\u011fustos ay\u0131nda yap\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.1000 mw&#8217;l\u0131k\u00a0R\u00fczgar\u00a0Enerjisi Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) ihalesine tekliflerini sunan firmalar belli oldu. Sekt\u00f6rde \u00f6nde gelen \u015firketlerden meydana gelen\u00a08 konsorsiyum tekliflerini\u00a0verdi. TEKL\u0130FLER\u0130N\u0130 SUNAN [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":65084,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,69,16,23318,34744,22615,4784,324,25578,31711,34745],"views":1336,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65974"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65974"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65974\/revisions"}],"predecessor-version":[{"id":66038,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65974\/revisions\/66038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/65084"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65974"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65974"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65974"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}