{"id":65759,"date":"2017-07-20T12:06:15","date_gmt":"2017-07-20T09:06:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65759"},"modified":"2017-07-20T12:07:23","modified_gmt":"2017-07-20T09:07:23","slug":"catilara-kuracaginiz-gunes-panelleri-ile-23-yil-bedava-elektrik-uretin","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/catilara-kuracaginiz-gunes-panelleri-ile-23-yil-bedava-elektrik-uretin\/","title":{"rendered":"(Turkish) \u00c7at\u0131lara Kuraca\u011f\u0131n\u0131z G\u00fcne\u015f Panelleriyle 23 Y\u0131l Bedava Elektrik \u00dcretin&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65759\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Mersin Elektrik M\u00fchendisleri Odas\u0131 Ba\u015fkan\u0131 Seyfettin Atar taraf\u0131ndan \u00e7at\u0131 \u00fcst\u00fc\u00a0g\u00fcne\u015f sistemlerine y\u00f6nelik yap\u0131 ruhsat ko\u015fulunun kald\u0131rmas\u0131 ile birlikte \u00e7at\u0131lara kurulacak sistemin 7.5 y\u0131lda kendini\u00a0am<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-49165\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/resmi-kurum-tarafindan-yapilan-en-buyuk-cati-ustu-gunes-sistemi.jpg\" alt=\"cati-ustu-gunes-sistemi\" width=\"300\" height=\"239\" \/><\/a>orti edece\u011fi ve 23 y\u0131l bedava elektrik \u00fcretece\u011fi de\u011ferlendirmesi yap\u0131ld\u0131.<\/span><\/strong><\/p>\n<p>Atar,\u00a0\u201cMersin ilimizde g\u00fcne\u015fleme ortalama 7 saattir. Binalar\u0131m\u0131za 5 kilovatl\u0131k bir sistemi rahat\u00e7a kurabiliyoruz. Bu sistemin maliyeti ise 41 bin TL civar\u0131ndad\u0131r. Kurulu g\u00fcc\u00fcm\u00fcz olan 5 kilovat ile \u00e7arpt\u0131\u011f\u0131m\u0131zda her y\u0131l yakla\u015f\u0131k 12 bin 250 saat enerji elde ediyoruz. Bunun kar\u015f\u0131l\u0131\u011f\u0131nda ise y\u0131ll\u0131k 5 bin 512 TL gelir elde etmi\u015f olunacakt\u0131r.\u201d dedi.<\/p>\n<p>Atar ayr\u0131ca \u201cKurulan g\u00fcne\u015f enerjisi sisteminin en az 30 y\u0131l \u00f6mr\u00fc bulunmaktad\u0131r. B\u00f6ylece\u00a0yakla\u015f\u0131k 23 y\u0131l bedava elektrik \u00fcretimi sa\u011flanabilinecek bu sistemlere istenirse ak\u00fc de konarak elektrik depolamas\u0131 ile elektrik kesintilerinde kesintiden etkilenmemenizi de sa\u011flayacakt\u0131r.&#8221; dedi.<\/p>\n<p><span style=\"color: #993300;\"><strong>Daha Detayl\u0131 Bilgi ve Fiyat Teklifi \u0130\u00e7in\u00a0\u2013&gt;<\/strong><\/span>\u00a0<strong><span style=\"color: #993300;\">Yetkili Ki\u015fi:<\/span>\u00a0<\/strong>Suat AYDO\u011eAN \u2013\u00a0<span style=\"color: #993300;\"><strong>Mail:<\/strong><\/span>\u00a0<a href=\"mailto:konseptenerji@gmail.com\">konseptenerji@gmail.com<\/a><\/p>\n<p><em>Detayl\u0131 Bilgi, Fiyat Teklifi ve Kurulum \u0130\u00e7in \u0130leti\u015fim Bilgileriniz \u0130le Birlikte\u00a0Mesaj G\u00f6nderiniz\u00a0Taraf\u0131n\u0131za En Ge\u00e7 24\u00a0Saat \u0130\u00e7erisinde Geri D\u00f6n\u00fc\u015f Yap\u0131lacakt\u0131r.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mersin Elektrik M\u00fchendisleri Odas\u0131 Ba\u015fkan\u0131 Seyfettin Atar taraf\u0131ndan \u00e7at\u0131 \u00fcst\u00fc\u00a0g\u00fcne\u015f sistemlerine y\u00f6nelik yap\u0131 ruhsat ko\u015fulunun kald\u0131rmas\u0131 ile birlikte \u00e7at\u0131lara kurulacak sistemin 7.5 y\u0131lda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49165,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[19,63,67,1009,2698,165,2326,227,939,469,13,1353,1876,23133,142,22975,4269,34642],"views":857,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65759"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65759"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65759\/revisions"}],"predecessor-version":[{"id":65762,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65759\/revisions\/65762"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49165"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}