{"id":65682,"date":"2017-07-17T08:59:44","date_gmt":"2017-07-17T05:59:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65682"},"modified":"2017-07-17T08:59:44","modified_gmt":"2017-07-17T05:59:44","slug":"siirt-botan-cayinda-11-mw-gucunde-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siirt-botan-cayinda-11-mw-gucunde-hes-kurulacak\/","title":{"rendered":"(Turkish) Siirt Botan \u00c7ay\u0131&#8217;nda 11 MW G\u00fcc\u00fcnde HES Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65682\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Odaba\u015f\u0131-Bal Elektrik taraf\u0131ndan Siirt Pervari il\u00e7esi Botan \u00c7ay\u0131nda 11 MW g\u00fcc\u00fcnde Karas<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-48553\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak-300x165.jpg\" alt=\"10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/10-milyar-liralik-101-baraj-ve-hesin-toplu-acilisi-14-ocakta-yapilacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>u Hidroelektrik Santrali kurulmas\u0131\u00a0planlanmaktad\u0131r.<\/strong><\/p>\n<p>Karasu HES projesi ile y\u0131lda \u00fcretilecek toplam da 35,35 GWh elektrik, 33.00 kV gerilime y\u00fckseltilerek yakla\u015f\u0131k 18 km uzunlu\u011fundaki \u00e7ift devre nakil hatt\u0131yla Siirt TM&#8217;nin OG Baras\u0131na ba\u011flanarak sisteme aktar\u0131m\u0131n\u0131n yap\u0131lmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>\u0130n\u015faat a\u015famas\u0131nda 75, i\u015fletme a\u015famas\u0131nda 10 ki\u015finin \u00e7al\u0131\u015ft\u0131r\u0131lmas\u0131n\u0131n planland\u0131\u011f\u0131\u00a0hes in\u00a041.954.642 TL yat\u0131r\u0131m bedeli ile,\u00a050 y\u0131l \u00f6mr\u00fcn\u00fcn olmas\u0131 ve\u00a02 y\u0131lda bitirilmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Odaba\u015f\u0131-Bal Elektrik taraf\u0131ndan Siirt Pervari il\u00e7esi Botan \u00c7ay\u0131nda 11 MW g\u00fcc\u00fcnde Karasu Hidroelektrik Santrali kurulmas\u0131\u00a0planlanmaktad\u0131r. Karasu HES projesi ile y\u0131lda \u00fcretilecek toplam da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48553,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[17617,63,67,1009,2698,165,35370,1090,34613,34612,34614,5196,105],"views":3172,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65682"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65682"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65682\/revisions"}],"predecessor-version":[{"id":65683,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65682\/revisions\/65683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48553"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}