{"id":65612,"date":"2017-07-13T14:49:17","date_gmt":"2017-07-13T11:49:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65612"},"modified":"2017-07-13T14:49:17","modified_gmt":"2017-07-13T11:49:17","slug":"nordexten-turkiyede-iki-yeni-proje-daha","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordexten-turkiyede-iki-yeni-proje-daha\/","title":{"rendered":"(Turkish) Nordex\u2019ten T\u00fcrkiye\u2019de \u0130ki Yeni Proje Daha&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65612\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Nordex Grup T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirece\u011fi projelerine bir yenisini daha ekliyor. Pakmem Elektrik\u2019e ait Cerit RES projesi i\u00e7in 16 adet N131\/3600 t\u00fcrbini 2018 ilkbahar\u0131nda teslim edilecek. Ayr\u0131ca proje i\u00e7in 15 y\u0131l\u0131 kapsayan her \u015fey dahil \u201cPremium Servis\u201d anla\u015fmas\u0131 da imzaland\u0131.<\/strong><\/p>\n<p>\u0130kinci yeni proje ise Sur Grup b\u00fcnyesindeki Sur Enerji&#8217;ye ait &#8220;Kurtini&#8221; projesi oldu. Nordex, bu projeye de Ekim 2017&#8217;den itibaren 4 adet N117\/3600 t\u00fcrbin tedar<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-65613\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha-300x212.jpg\" alt=\"nordexten-turkiyede-iki-yeni-proje-daha\" width=\"300\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha-500x354.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/nordexten-turkiyede-iki-yeni-proje-daha.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i\u011finde bulunacak ve 10 y\u0131l s\u00fcreyle her \u015fey dahil \u201cPremium Servis\u201d hizmeti sa\u011flayacak.<\/p>\n<p>57.6 MW\u2019l\u0131k Cerit RES projesi, T\u00fcrkiye\u2019de N131\/3600 t\u00fcrbinlerinin kullan\u0131laca\u011f\u0131 ilk proje olacak. Kahramanmara\u015f\u2019a 36 kilometre uzakl\u0131ktaki \u00c7a\u011flayancerit il\u00e7esinde yer alacak santral, 1510 ve 1865 metre y\u00fckseklikteki iki s\u0131rt \u00fczerinde 84 metre \u00e7elik kuleler ile in\u015fa edilecek. Cerit RES sahas\u0131ndaki y\u0131ll\u0131k ortalama r\u00fczgar h\u0131z\u0131 6,6 m\/s olarak \u00f6ng\u00f6r\u00fcl\u00fcyor. N131\/3600 t\u00fcrbinlerinin y\u00fcksek verimle \u00e7al\u0131\u015faca\u011f\u0131 santral, 2018 ilkbahar\u0131nda kurulacak. Santralin tamamlanmas\u0131n\u0131n ard\u0131ndan Cerit RES y\u0131ll\u0131k yakla\u015f\u0131k 16,000 MWh temiz elektrik \u00fcretecek ve Nordex b\u00f6ylece Kahramanmara\u015f\u2019taki ikinci projesini tamamlam\u0131\u015f olacak.<\/p>\n<p>Nordex, Akdeniz\u2019in 20 kilometre kuzeyinde, Mersin\u2019de bulunan &#8220;Kurtini&#8221; projesinde ise Sur Enerji ile birlikte ilk defa \u00e7al\u0131\u015facak. N117\/3600 t\u00fcrbinler, 91 metre \u00e7elik kulelerle 1150 ila 1250 metre rak\u0131mda y\u00fckselecek. Projenin 2018 ilkbahar\u0131nda tamamlanmas\u0131n\u0131n ard\u0131ndan, projenin y\u0131ll\u0131k 45.000 MWh elektrik \u00fcretmesi bekleniyor. Yakla\u015f\u0131k 15.000 haneye elektrik sa\u011flayacak bu kapasite ile ortalama 26.500 ton karbondioksit emisyonu sa\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Nordex Grup T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirece\u011fi projelerine bir yenisini daha ekliyor. Pakmem Elektrik\u2019e ait Cerit RES projesi i\u00e7in 16 adet N131\/3600 t\u00fcrbini 2018 ilkbahar\u0131nda teslim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":65613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,2455,474,69,16,23318,22615,4784,324],"views":1397,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65612"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65612"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65612\/revisions"}],"predecessor-version":[{"id":65614,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65612\/revisions\/65614"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/65613"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}