{"id":65576,"date":"2017-07-12T12:05:22","date_gmt":"2017-07-12T09:05:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65576"},"modified":"2017-07-12T12:05:22","modified_gmt":"2017-07-12T09:05:22","slug":"yeka-icin-guclu-bir-konsorsiyum-olusturuldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu\/","title":{"rendered":"(Turkish) YEKA \u0130\u00e7in G\u00fc\u00e7l\u00fc Bir Konsorsiyum Olu\u015fturuldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65576\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Siemens Gamesa Renewable Energy, Kalyon \u0130n\u015faat ve T\u00fcrkerler Enerji; Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) projesi kapsam\u0131nda d\u00fczenlenecek ihaleye kat\u0131lmak \u00fczere bir konsorsiyum olu\u015fturdu.<\/strong><\/p>\n<p>Ekipman ve teknolojide yerlile\u015fme amac\u0131n\u0131 ta\u015f\u0131yan ve en az y\u00fczde 65\u2019lik yerli girdi \u015fart\u0131 getiren YEKA projesi, toplam 1000 MW\u2019l\u0131k r\u00fczgar santrali kurulmas\u0131n\u0131 kaps\u0131yor.Kalyon \u0130n\u015faat\u2019\u0131n mega projelerdeki tecr\u00fcbesi ve enerji alan\u0131nda b\u00fcy\u00fcme kararl\u0131l\u0131\u011f\u0131; <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-65577\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu-300x216.jpg\" alt=\"Getriebelose Windenergieanlagen f\u00fcr Wales: Siemens erh\u00e4lt gro\u00dfen Onshore-Auftrag \/ Wales: Siemens receives UK\u2019s largest direct drive order for onshore wind farm\" width=\"300\" height=\"216\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu-300x216.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/07\/yeka-icin-guclu-bir-konsorsiyum-olusturuldu.jpg 420w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>T\u00fcrkerler Enerji\u2019nin r\u00fczgar enerjisi alan\u0131ndaki proje geli\u015ftirme deneyimi ve uzman ekibi, Gamesa ile birle\u015ferek d\u00fcnyan\u0131n lider r\u00fczgar t\u00fcrbini \u00fcreticisi konumuna gelen Siemens Gamesa\u2019n\u0131n yenilik\u00e7i ve verimli teknolojileri, konsorsiyumu g\u00fc\u00e7l\u00fc k\u0131lan \u00f6zellikler aras\u0131nda yer al\u0131yor<\/p>\n<p>YEKA konsorsiyum anla\u015fmas\u0131 ile birlikte \u00fc\u00e7 \u015firket bir de \u00e7er\u00e7eve anla\u015fmas\u0131 imzalad\u0131. Bu anla\u015fmaya g\u00f6re Kalyon \u0130n\u015faat ve T\u00fcrkerler Enerji\u2019nin ortak oldu\u011fu 210 MW g\u00fcc\u00fcnde iki r\u00fczgar santrali, Siemens teknolojisiyle yap\u0131lacak. Bu projelerden Zonguldak R\u00fczgar Enerjisi Santrali, 120 MW g\u00fcc\u00fcnde, 34 adet SWT-3.7- 130 t\u00fcrbin, y\u0131lda yakla\u015f\u0131k 366 milyon KW\/saat enerji \u00fcretecek ve 110 bin hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak. Bozh\u00f6y\u00fck R\u00fczgar Enerji Santrali ise Bilecik\u2019in B\u00f6zh\u00f6y\u00fck il\u00e7esinde, 90 MW g\u00fcc\u00fcnde, 25 adet SWT- 3.7 \u2013 130 t\u00fcrbin ile y\u0131lda 300 milyon KW\/saat enerji \u00fcretecek, 95 bin hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p>YEKA projesi i\u00e7in olu\u015fturulan \u00fc\u00e7l\u00fc konsorsiyum, uzun vadeli bir i\u015fbirli\u011fi i\u00e7eriyor ve ilerleyen y\u0131llarda ger\u00e7ekle\u015ftirilmesi muhtemel YEKA projelerini de kaps\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Siemens Gamesa Renewable Energy, Kalyon \u0130n\u015faat ve T\u00fcrkerler Enerji; Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n R\u00fczgar Enerjisi Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) projesi kapsam\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":65577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,34581,474,69,16,231,23318,22615,4784,34580,34582,25578],"views":881,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65576"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65576"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65576\/revisions"}],"predecessor-version":[{"id":65578,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65576\/revisions\/65578"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/65577"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}