{"id":65455,"date":"2017-07-07T11:25:22","date_gmt":"2017-07-07T08:25:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65455"},"modified":"2017-07-07T11:25:22","modified_gmt":"2017-07-07T08:25:22","slug":"sivasta-coplerden-10-bin-hanenin-elektrik-ihtiyaci-karsilaniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivasta-coplerden-10-bin-hanenin-elektrik-ihtiyaci-karsilaniyor\/","title":{"rendered":"(Turkish) Sivas\u2019ta \u00c7\u00f6plerden 10 Bin Hanenin Elektrik \u0130htiyac\u0131 Kar\u015f\u0131lan\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65455\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Sivas Belediyesi taraf\u0131ndan iki y\u0131l \u00f6nce \u00f6rnek bir projeye imza at\u0131larak hem \u015fehir<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-53704\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-300x200.jpg\" alt=\"copten-elektrik-uretim-tesisi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-1024x682.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/06\/elaziga-10-bin-konutun-ihtiyacini-karsilayacak-copten-elektrik-uretim-tesisi.jpg 1068w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>den toplanan \u00e7\u00f6plerin \u00e7evreye verdi\u011fi zarar engellendi hem de \u00e7\u00f6plerden 10 bin hanenin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek d\u00fczeyde elektrik enerjisi \u00fcretildi.<\/span><\/strong><\/p>\n<p>\u0130ki y\u0131l \u00f6nce 1.5 MGVS g\u00fcc\u00fcnde kurulan ve metan gaz\u0131yla \u00e7al\u0131\u015fan santralin kurulu g\u00fcc\u00fc 2.8 MGVS y\u00fckseltildi. Gelecek\u00a0y\u0131llarda kurulu g\u00fcc\u00fc 3.5 MGVS y\u00fckseltilmesi planlanan santral ile \u015fu anda y\u0131lda bin MGVS civar\u0131nda elektrik enerjisi\u00a0\u00fcretmektedir.<\/p>\n<p>Santral Sivas Belediyesi\u2019ne ait olan 900 dekarl\u0131k d\u00fczenli \u00e7\u00f6p depolama sahas\u0131nda toplanan \u00e7\u00f6plerin \u00fcretti\u011fi metan gaz\u0131 ile \u00e7al\u0131\u015fmaktad\u0131r. \u00c7\u00f6plerin \u00fcretti\u011fi gaz \u00f6zel borularla ayr\u0131\u015ft\u0131rarak santrale ta\u015f\u0131nmakta,\u00a0santrale ta\u015f\u0131nan gaz burada yak\u0131larak \u00f6nce kinetik enerjiye ard\u0131ndan ise elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclmektedir.<\/p>\n<p>Haberin <a href=\"http:\/\/enerjienstitusu.com\/2017\/07\/05\/sivasta-coplerden-10-bin-hanenin-enerji-ihtiyaci-karsilandi\/\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sivas Belediyesi taraf\u0131ndan iki y\u0131l \u00f6nce \u00f6rnek bir projeye imza at\u0131larak hem \u015fehirden toplanan \u00e7\u00f6plerin \u00e7evreye verdi\u011fi zarar engellendi hem de \u00e7\u00f6plerden 10 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":53704,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[32078,5220,19,63,67,1009,1714,2698,165,5417,34535,24696],"views":2660,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65455"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65455"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65455\/revisions"}],"predecessor-version":[{"id":65456,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65455\/revisions\/65456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/53704"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}