{"id":65421,"date":"2017-07-05T13:46:15","date_gmt":"2017-07-05T10:46:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65421"},"modified":"2017-08-10T10:04:13","modified_gmt":"2017-08-10T07:04:13","slug":"nordexe-turkiyeden-10-adet-n1313900-turbinlik-siparis","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordexe-turkiyeden-10-adet-n1313900-turbinlik-siparis\/","title":{"rendered":"(Turkish) Nordex\u2019e T\u00fcrkiye\u2019den 10 Adet N131\/3900 T\u00fcrbinlik Sipari\u015f"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65421\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Nordex, Erdem Holding A.\u015e.\u2019den bir proje sipari\u015fi daha ald\u0131. Nordex, Eber RES i\u00e7in 10 adet N131\/3900 r\u00fczgar t\u00fcrbini tedarik edecek. 15 y\u0131ll\u0131k her \u015fey dahil \u201cPremium Servis\u201d hizmeti de anla\u015fman\u0131n bir par\u00e7as\u0131n\u0131 olu\u015fturuyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/nordex-turkiyeden-376-mwlik-turbin-siparisi-daha.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-20913\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/nordex-turkiyeden-376-mwlik-turbin-siparisi-daha-300x199.jpg\" alt=\"nordex-turkiyeden-376-mwlik-turbin-siparisi-daha\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/nordex-turkiyeden-376-mwlik-turbin-siparisi-daha-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/nordex-turkiyeden-376-mwlik-turbin-siparisi-daha-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/01\/nordex-turkiyeden-376-mwlik-turbin-siparisi-daha.jpg 485w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Afyonkarahisar\u2019\u0131n Sand\u0131kl\u0131 il\u00e7esinde yer alan proje 7.8 m\/s\u2019lik y\u0131ll\u0131k ortalama r\u00fczgar h\u0131z\u0131yla Nordex\u2019in N131\/3900 t\u00fcrbini i\u00e7in \u00e7ok uygun bir saha olma \u00f6zelli\u011fini ta\u015f\u0131yor. Ayr\u0131ca Nordex, Eber RES i\u00e7in T\u00fcrkiye\u2019de bir ilk olacak olan 84 metre \u00e7elik kuleleri kullanacak. Kurulumu 2018 bahar\u0131nda ger\u00e7ekle\u015ftirilmesi planlanan 39 MW kapasiteli r\u00fczgar santrali, 2018 y\u0131l\u0131 sonunda 136.000 MWs temiz elektrik \u00fcretecek.<\/p>\n<p>Ayn\u0131 zamanda Eber RES, Nordex\u2019in N131\/3900 t\u00fcrbinlerini tedarik edece\u011fi ilk, Erdem Holding ve Nordex&#8217;in birlikte \u00e7al\u0131\u015faca\u011f\u0131 d\u00f6rd\u00fcnc\u00fc r\u00fczgar santrali olma \u00f6zelli\u011fini ta\u015f\u0131yor. Erdem Holding telekom\u00fcnikasyon, enerji, in\u015faat, in\u015faat ve yap\u0131 malzemeleri, gayrimenkul, geri d\u00f6n\u00fc\u015f\u00fcm ve at\u0131k y\u00f6netimi sekt\u00f6rlerinde faaliyet g\u00f6stermekle birlikte yenilenebilir enerji alan\u0131ndaki yat\u0131r\u0131mlar\u0131n\u0131 giderek art\u0131r\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Nordex, Erdem Holding A.\u015e.\u2019den bir proje sipari\u015fi daha ald\u0131. Nordex, Eber RES i\u00e7in 10 adet N131\/3900 r\u00fczgar t\u00fcrbini tedarik edecek. 15 y\u0131ll\u0131k her [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20913,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,2455,69,16,23318,22615,4784],"views":2623,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65421"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65421"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65421\/revisions"}],"predecessor-version":[{"id":66373,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65421\/revisions\/66373"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/20913"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}