{"id":65394,"date":"2017-07-04T10:20:45","date_gmt":"2017-07-04T07:20:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65394"},"modified":"2017-07-04T10:21:20","modified_gmt":"2017-07-04T07:21:20","slug":"silivride-evsel-coplerden-elektrik-uretilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/silivride-evsel-coplerden-elektrik-uretilecek\/","title":{"rendered":"(Turkish) Silivri&#8217;de Evsel \u00c7\u00f6plerden Elektrik \u00dcretilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65394\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi \u015firketi olan \u0130stanbul Enerji A.\u015e. taraf\u0131ndan \u0130stanbul<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-11529\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg\" alt=\"biyogaz-tesisi\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/kirsehir-biyogaz-tesisi.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> \u0130li, Silivri \u0130l\u00e7esi, Seymen K\u00f6y\u00fc, Seymen Kat\u0131 at\u0131k d\u00fczenli depolama tesisi i\u00e7inde 2.265.312m2 arazi \u00fczerinde, 56.700m2 alanda \u00a0\u201cMetan Gaz\u0131ndan Elektrik \u00dcretimi (22,64MWe -53,632MWt), Elektrik \u0130letim Hatt\u0131 (14,6km Uzunlukta) Ve Kojenerasyon Tesisi(4,6MWh)\u201d projesinin hayata ge\u00e7irilmesi planlanmaktad\u0131r.<\/strong><\/p>\n<p>63.292.400 TL yat\u0131r\u0131m bedeline sahip\u00a0proje kapsam\u0131nda ayr\u0131\u015ft\u0131r\u0131lm\u0131\u015f evsel at\u0131klarda ortaya \u00e7\u0131kan \u00e7\u00f6p biyogazdan, 22,64MWe elektrik, \u00a0Gaz Motorlar\u0131 At\u0131k Is\u0131s\u0131ndan (Baca Egzozu ve Ceket Suyu) ise 4,6MWh\u2019l\u0131k elektrik \u00fcretimi (Kojenerasyon)\u00a0ger\u00e7ekle\u015ftirilecektir.<\/p>\n<p>\u00c7\u0131kar\u0131lan biyogaz\u0131n depolanmas\u0131 da planlanmaktad\u0131r. Tesiste 2 adet toplam 32.000m3 gaz depolama kapasiteli gaz balonun y\u0131ll\u0131k 10.720.000Nm3 Biyogaz depolamas\u0131 5.896.000Nm3 metan gaz\u0131) depolanacakt\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/icerik\/23392\/istanbul-silivride-evsel-copler-elektrige-donusturulecek.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi \u015firketi olan \u0130stanbul Enerji A.\u015e. taraf\u0131ndan \u0130stanbul \u0130li, Silivri \u0130l\u00e7esi, Seymen K\u00f6y\u00fc, Seymen Kat\u0131 at\u0131k d\u00fczenli depolama tesisi i\u00e7inde 2.265.312m2 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[6100,1901,68,63,67,1009,2698,165,5417,1967,34502,2619],"views":2817,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65394"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65394"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65394\/revisions"}],"predecessor-version":[{"id":65396,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65394\/revisions\/65396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/11529"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}