{"id":65334,"date":"2017-07-02T12:50:35","date_gmt":"2017-07-02T09:50:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65334"},"modified":"2017-07-02T12:50:35","modified_gmt":"2017-07-02T09:50:35","slug":"konya-ve-nigdede-gunes-enerjisi-ihaleleri-acilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konya-ve-nigdede-gunes-enerjisi-ihaleleri-acilacak\/","title":{"rendered":"(Turkish) Konya ve Ni\u011fde&#8217;de G\u00fcne\u015f Enerjisi \u0130haleleri A\u00e7\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65334\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">KPMG T\u00fcrkiye Enerji Sekt\u00f6r Lideri \u00dcm<img loading=\"lazy\" class=\"alignright wp-image-48514 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c-300x300.jpeg\" alt=\"alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c-300x300.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c-150x150.jpeg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c-400x400.jpeg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c-50x50.jpeg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/12\/alternatif-enerji-turkiye-nin-en-buyuk-gunes-enerjisi-santrali-500x500_c.jpeg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>it Bilirgen taraf\u0131ndan\u00a0\u201cG\u00fcne\u015f enerjisi ile elektrik \u00fcretimi i\u00e7in Konya\u2019n\u0131n Karap\u0131nar il\u00e7esinde ger\u00e7ekle\u015ftirilen Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) ihalesinin ard\u0131ndan bir sonraki ihalenin yine Karap\u0131nar\u2019da veya Ni\u011fde\u2019nin ilgili alanlar\u0131nda olmas\u0131n\u0131 beklemekteyiz.&#8221;denildi.<\/span><\/strong><\/p>\n<p>Bilirgen, &#8220;Konya\u2019n\u0131n Karap\u0131nar il\u00e7esinde 600 megavat, Ni\u011fde\u2019de ise 200 megavat bir potansiyel mevcut. Ge\u00e7 olmadan bu potansiyeli de\u011ferlendirmeye ba\u015flamal\u0131y\u0131z.\u201d\u00a0dedi.<\/p>\n<p>Yabanc\u0131 yat\u0131r\u0131mc\u0131lar\u0131n da enerji sekt\u00f6r\u00fcndeki ihalelere girdi\u011fini belirten Bilirgen, \u201cYabanc\u0131 yat\u0131r\u0131mc\u0131lar g\u00fcne\u015f, r\u00fczgar ve hidroelektrik projelerinde sermayedar, yerli k\u00f6m\u00fcr ile elektrik \u00fcretiminde ise bor\u00e7 veren konumunda projede\u00a0yer almaktad\u0131r. Mevcut ihalelerde verilen tavan fiyat seviyesi bu yat\u0131r\u0131mc\u0131lar i\u00e7in olduk\u00e7a cazipti. Bu noktadan sonra da \u00fclkeye s\u0131cak para giri\u015fini sa\u011flamak ad\u0131na yeni ihaleler ile yat\u0131r\u0131mc\u0131lar\u0131n \u00fclkeye \u00e7a\u011fr\u0131lmas\u0131 gerekmektedir.&#8221; ifadeleri kullan\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.KPMG T\u00fcrkiye Enerji Sekt\u00f6r Lideri \u00dcmit Bilirgen taraf\u0131ndan\u00a0\u201cG\u00fcne\u015f enerjisi ile elektrik \u00fcretimi i\u00e7in Konya\u2019n\u0131n Karap\u0131nar il\u00e7esinde ger\u00e7ekle\u015ftirilen Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) ihalesinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":48514,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,227,13,17604,23133,22975,4269,2441,34480,4899,25578,32138],"views":1233,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65334"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65334"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65334\/revisions"}],"predecessor-version":[{"id":65335,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65334\/revisions\/65335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/48514"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}