{"id":65143,"date":"2017-06-24T19:19:09","date_gmt":"2017-06-24T16:19:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=65143"},"modified":"2017-06-24T19:19:09","modified_gmt":"2017-06-24T16:19:09","slug":"ruzgar-yarismalarinda-trakya-bolgesine-yogun-talep","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruzgar-yarismalarinda-trakya-bolgesine-yogun-talep\/","title":{"rendered":"(Turkish) R\u00fczgar Yar\u0131\u015fmalar\u0131nda Trakya B\u00f6lgesine Yo\u011fun Talep"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/65143\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>R\u00fczgar yar\u0131\u015fmalar\u0131n\u0131n ikinci g\u00fcn\u00fcnde Trakya b\u00f6lgesine yo\u011fun talep vard\u0131. Borusan EnBW i\u015f ortakl\u0131\u011f\u0131n\u0131n i\u015ftiraki olan firmalar hem Edirneyi hem de Tekirda\u011f b\u00f6lgesindeki yar\u0131\u015fmalar\u0131 kazand\u0131. Yar\u0131\u015fmalar\u0131n ikinci g\u00fcn\u00fcnde toplamda 170 MW\u2019l\u0131k kapasite i\u00e7in yar\u0131\u015fan projelerin yakla\u015f\u0131k yat\u0131r\u0131m bedeli 240 milyon dolar.<\/strong><\/p>\n<p>2015 Nisan ay\u0131nda al\u0131nan 3.000 MW\u2019l\u0131k\u00a0 r\u00fczgar ba\u015fvurular\u0131n\u0131n 710 MW\u2019l\u0131k k\u0131sm\u0131na ait yar\u0131\u015fmalar\u0131n ikincisi de bug\u00fcn (22.6.2017) tamamland\u0131. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan Ankara \u00c7ukurambar\u2019daki\u00a0 Holiday Inn Otelinde <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-3324\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-300x197.jpg\" alt=\"5-ruzgar-enerjisi-santrali-icin-enda-enerji-kredi-sagladi\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268.jpg 408w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ger\u00e7ekle\u015ftirilen yar\u0131\u015fmalar\u0131n ikinci g\u00fcn\u00fcnde Edirne b\u00f6lgesinde 40 MW i\u00e7in toplamda 1.000 MW\u2019l\u0131k 32 proje, Tekirda\u011f b\u00f6lgesinde 60 MW i\u00e7in toplamda 1.332 MW\u2019l\u0131k 36 proje ve K\u0131rklareli b\u00f6lgesinde 70 MW i\u00e7in 1.404 MW\u2019l\u0131k 34 proje yar\u0131\u015ft\u0131.<\/p>\n<p>Bug\u00fcnk\u00fc oturumlarda da en d\u00fc\u015f\u00fck teklifi (-1.61 $\/kWh) ile yine RES Anatolia verdi.<\/p>\n<p><strong>Edirne ve Tekirda\u011f B\u00f6lgesine Borusan EnBW \u0130mzas\u0131<\/strong><\/p>\n<p>Yar\u0131\u015fman\u0131n ikinci g\u00fcn\u00fcnde k\u0131ran k\u0131rana ge\u00e7en bir m\u00fccadele sonucu Trakya b\u00f6lgesindeki 170 MW\u2019l\u0131k kapasitenin 100 MW\u2019\u0131 Borusan EnBW i\u015f ortakl\u0131\u011f\u0131n\u0131n oldu.<\/p>\n<p>Edirne b\u00f6lgesindeki 40 MW kapasite i\u00e7in Fesle\u011fen A.\u015e. ;\u00a0 Gardenya A.\u015e. ; Binres A.\u015e. ; Enyat Enerji A.\u015e ; Yurt Enerji A.\u015e. ve Ekores Enerji A.\u015e. eksi fiyat teklifi verdi. Bu b\u00f6lgedeki 40 MW\u2019l\u0131k r\u00fczgar santrali ba\u011flant\u0131 kapasitesinin tamam\u0131 (-1.51 $ \/kWh)\u00a0teklifi ileBorusan EnBW i\u015f ortakl\u0131\u011f\u0131n\u0131n i\u015ftiraki olan Fesle\u011fen Yenilenebilir Enerji ve Elk. \u00dcr. A.\u015e\u2019nin oldu.<\/p>\n<p>Tekirda\u011f b\u00f6lgesinde yar\u0131\u015fan 36 proje aras\u0131ndan 5 tanesi eksi fiyat teklifinde bulundu. Bunlardan Borusan EnBW i\u015f ortakl\u0131\u011f\u0131n\u0131n i\u015ftirakleri olan Kakt\u00fcs Yenilenebilir En.ve El. \u00dcr. A. \u015e. (-1.49 $\/kWh) ile kapasitenin 49.50 MW\u2019\u0131n\u0131, Buket Yenilenebilir En.ve El. \u00dcr. A. \u015e. ise (-1.48 $ \/kWh) ile kapasitenin 10.50 MW\u2019l\u0131k k\u0131sm\u0131n\u0131 alarak Trakya b\u00f6lgesinde toplamda 100 MW\u2019l\u0131k projenin sahibi oldu.<\/p>\n<p><strong>K\u0131rklareli B\u00f6lgesi Res Anatolia\u2019n\u0131n <\/strong><\/p>\n<p>D\u00fcnk\u00fc yar\u0131\u015fmada Aksaray-K\u0131r\u015fehir-Nev\u015fehir B\u00f6lgesinde (-1.15 $\/kWh) ile 60 MW\u2019l\u0131k kapasite tahsisi alan Res Anatolia Holding A.\u015e, bug\u00fcn de (-1.61 $\/kWh) fiyat teklifi ile K\u0131rklareli b\u00f6lgesindeki 70MW\u2019l\u0131k kapasitenin tamam\u0131n\u0131 ald\u0131.<\/p>\n<p><strong>Trakya b\u00f6lgesinde yat\u0131r\u0131mlar artacak<\/strong><\/p>\n<p>T\u00dcREB Ba\u015fkan\u0131 Mustafa Serdar Ataseven, eksi teklif veren firmalar\u0131n YEKDEM mekanizmas\u0131ndan yararlanamamas\u0131n\u0131n eksi teklifleri engellemedi\u011fini belirterek, yar\u0131n yap\u0131lacak yar\u0131\u015fmalarda da bu durumu g\u00f6rebilece\u011fimizi belirtti. Verimli bir b\u00f6lge olan Trakya i\u00e7in taleplerin yo\u011fun olmas\u0131n\u0131n \u015fa\u015f\u0131rt\u0131c\u0131 olmad\u0131\u011f\u0131n\u0131 s\u00f6yleyen Ataseven,\u00a0 Temmuz ay\u0131nda yap\u0131lacak YEKA ba\u015fvurular\u0131ndan sonra Trakya b\u00f6lgesinde r\u00fczgar yat\u0131r\u0131mlar\u0131n\u0131n daha da artaca\u011f\u0131n\u0131 ifade etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.R\u00fczgar yar\u0131\u015fmalar\u0131n\u0131n ikinci g\u00fcn\u00fcnde Trakya b\u00f6lgesine yo\u011fun talep vard\u0131. Borusan EnBW i\u015f ortakl\u0131\u011f\u0131n\u0131n i\u015ftiraki olan firmalar hem Edirneyi hem de Tekirda\u011f b\u00f6lgesindeki yar\u0131\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3324,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,69,16,23318,22615,4784,34383,9874],"views":1554,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65143"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=65143"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65143\/revisions"}],"predecessor-version":[{"id":65144,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/65143\/revisions\/65144"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/3324"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=65143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=65143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=65143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}