{"id":64871,"date":"2017-06-13T12:55:01","date_gmt":"2017-06-13T09:55:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64871"},"modified":"2017-06-13T12:55:01","modified_gmt":"2017-06-13T09:55:01","slug":"tamamlanamayan-enerji-projeleri-yeni-yatirimcilara-tahsis-edilebilinecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tamamlanamayan-enerji-projeleri-yeni-yatirimcilara-tahsis-edilebilinecek\/","title":{"rendered":"(Turkish) Tamamlanamayan Enerji Projeleri Yeni Yat\u0131r\u0131mc\u0131lara Tahsis Edilebilinecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64871\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Elektrik sekt\u00f6r\u00fcnde yeni yat\u0131r\u0131mc\u0131n\u0131n \u00f6n\u00fcn\u00fc a\u00e7acak yeni bir ad\u0131m at\u0131ld\u0131. Projelerini sonland\u0131rmak isteyenler herhangi bir yapt\u0131r\u0131m olmadan bunu sonland\u0131r\u0131labilecek.\u00a0<\/span>\u00d6n lisans veya \u00fcretim lisans\u0131 a<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40268\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-300x198.jpg\" alt=\"res-ve-gesler\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/res-ve-geslere-3-7-gwlik-lisanssiz-kapasite-tahsisi-2.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>l\u0131nmas\u0131na ra\u011fmen hayata ge\u00e7irilemeyen yat\u0131r\u0131mlar i\u00e7in verilen teminatlar da iade edilecek.<\/strong><\/p>\n<p>S\u00f6z konusu projelerin sonland\u0131r\u0131lmas\u0131 halinde tamamlanamayan Hidroelektrik Santralleri (HES), R\u00fczgar Enerji Santralleri (RES) ve G\u00fcne\u015f Enerji Santralleri (GES), yeni yat\u0131r\u0131mc\u0131lara tahsis edilebilecek. Bu tip HES projeleri Devlet Su \u0130\u015fleri taraf\u0131ndan yeniden projelendirilerek, ilana \u00e7\u0131kacak. RES, GES ve di\u011fer kaynaklara dayal\u0131 projelerin at\u0131l tutulan ba\u011flant\u0131 kapasiteleri ise yeni yat\u0131r\u0131mc\u0131lara tahsis edilebilecek.<\/p>\n<p>K\u0131sa bir s\u00fcre \u00f6nce yap\u0131lan kanuni de\u011fi\u015fikli\u011fe y\u00f6nelik sonland\u0131rma ba\u015fvurular\u0131 27 Temmuz\u2019a kadar yap\u0131labilecek.<\/p>\n<p>Haberin <a href=\"http:\/\/enerjienstitusu.com\/2017\/06\/13\/tamamlanamayan-enerji-projeleri-yeni-yatirimcilara-tahsis-edilebilecek\/\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Elektrik sekt\u00f6r\u00fcnde yeni yat\u0131r\u0131mc\u0131n\u0131n \u00f6n\u00fcn\u00fc a\u00e7acak yeni bir ad\u0131m at\u0131ld\u0131. Projelerini sonland\u0131rmak isteyenler herhangi bir yapt\u0131r\u0131m olmadan bunu sonland\u0131r\u0131labilecek.\u00a0\u00d6n lisans veya \u00fcretim lisans\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40268,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[2273,63,67,1009,2698,1306,247,165,750,2326,227,13,35370,474],"views":1094,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64871"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64871"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64871\/revisions"}],"predecessor-version":[{"id":64872,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64871\/revisions\/64872"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40268"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}