{"id":64852,"date":"2017-06-12T11:24:34","date_gmt":"2017-06-12T08:24:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64852"},"modified":"2017-06-12T11:24:34","modified_gmt":"2017-06-12T08:24:34","slug":"cinli-hanergy-gruptan-cankiriya-gunes-enerji-paneli-fabrikasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinli-hanergy-gruptan-cankiriya-gunes-enerji-paneli-fabrikasi\/","title":{"rendered":"(Turkish) \u00c7inli Hanergy Grup&#8217;tan \u00c7ank\u0131r\u0131\u2019ya G\u00fcne\u015f Enerji Paneli Fabrikas\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64852\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">\u00c7inli Hanergy Grup&#8217;un \u00c7ank\u0131r\u0131\u2019da ku<img loading=\"lazy\" class=\"alignright wp-image-49433\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2016\/01\/turkiyede-uretilen-gunes-panelleri-londra-yolcusu.jpg\" alt=\"turkiyede-uretilen-gunes-panelleri-londra-yolcusu\" width=\"300\" height=\"224\" \/>rulacak g\u00fcne\u015f enerji paneli fabrikas\u0131 ile yakla\u015f\u0131k 500 ki\u015fiyi istihdam edece\u011fi\u00a0a\u00e7\u0131kland\u0131.<\/span><\/strong><\/p>\n<p>Yak\u0131nkent Organize Sanayi B\u00f6lgesi\u2019nde, Hanergy Grup taraf\u0131ndan 480 hektar alanda kurulmas\u0131 planlanan fabrikada, 36 hektar \u00fczerine proje kapsam\u0131ndaki yap\u0131lar\u0131n yap\u0131laca\u011f\u0131, 12 hektar\u0131n ise AR-GE \u00e7al\u0131\u015fmalar\u0131 i\u00e7in ayr\u0131laca\u011f\u0131\u00a0belirtildi.<\/p>\n<p>Yap\u0131lan anla\u015fma gere\u011fi Hanergy Grup&#8217;un, T\u00fcrkiye\u2019nin 2023 hedefleri aras\u0131nda yer alan yenilenebilir enerjinin y\u00fczde 30 artt\u0131r\u0131lmas\u0131 hedefine katk\u0131 amac\u0131yla G\u00fcne\u015f Enerjisi End\u00fcstri Park Projesi ile 300 megavattl\u0131k bir enerji park\u0131 kurulaca\u011f\u0131, yat\u0131r\u0131m\u0131 yapacak olan firman\u0131n, gerekli ara\u015ft\u0131rma ve haz\u0131rl\u0131\u011f\u0131n yap\u0131lmas\u0131 i\u00e7in 6 ay s\u00fcre istendi\u011fi dile getirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7inli Hanergy Grup&#8217;un \u00c7ank\u0131r\u0131\u2019da kurulacak g\u00fcne\u015f enerji paneli fabrikas\u0131 ile yakla\u015f\u0131k 500 ki\u015fiyi istihdam edece\u011fi\u00a0a\u00e7\u0131kland\u0131. Yak\u0131nkent Organize Sanayi B\u00f6lgesi\u2019nde, Hanergy Grup taraf\u0131ndan 480 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":49433,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[34258,886,63,67,1009,2698,165,227,13,34259,23133,108,22975,4269,34260,34261,105],"views":1617,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64852"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64852"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64852\/revisions"}],"predecessor-version":[{"id":64853,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64852\/revisions\/64853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/49433"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}