{"id":64460,"date":"2017-05-26T13:05:48","date_gmt":"2017-05-26T10:05:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64460"},"modified":"2017-05-26T13:05:48","modified_gmt":"2017-05-26T10:05:48","slug":"bingol-kigi-hidroelektrik-santrali-valmete-emanet","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bingol-kigi-hidroelektrik-santrali-valmete-emanet\/","title":{"rendered":"(Turkish) Bing\u00f6l Ki\u011f\u0131 Hidroelektrik Santrali Valmet\u2019e Emanet&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64460\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji, sel\u00fcloz ve ka\u011f\u0131t sekt\u00f6rlerine y\u00f6nelik ileri teknoloji \u00fcr\u00fcn ve \u00e7\u00f6z\u00fcmleriyle t\u00fcm d\u00fcnyada \u00f6nemli projelere imza atan Valmet, sundu\u011fu inovatif \u00e7\u00f6z\u00fcmlerle m\u00fc\u015fterilerine sa\u011flad\u0131\u011f\u0131 f\u0131rsatlar\u0131 geli\u015ftiriyor.<\/strong><\/p>\n<p><strong>Referanslar\u0131na durmaks\u0131z\u0131n yenilerini ekleyen Valmet, Hamitabat\u2019ta kurulacak olan bin 200 MW\u2019l\u0131k kombine \u00e7evrim g\u00fc\u00e7 santralinin ard\u0131ndan, kurulumu Bilg\u00f6l\u2019de devam eden Ki\u011f\u0131 Hidroelektrik Enerji Tesisi (Ki\u011f\u0131 HEPP)\u2019ni de referanslar\u0131na ekledi.<\/strong><\/p>\n<p>M\u00fc\u015fterilerine sundu\u011fu benzersiz tekn<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-64461\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet-300x192.jpg\" alt=\"bingol-kigi-hidroelektrik-santrali-valmete-emanet\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bingol-kigi-hidroelektrik-santrali-valmete-emanet.jpg 560w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>olojiler, otomasyon ve servis kombinasyonu ile g\u00fc\u00e7l\u00fc \u00e7\u00f6z\u00fcmler sa\u011flayan Valmet, T\u00fcrkiye\u2019nin \u00f6nde gelen enerji organizasyonu ICCI \u2013 Enerji ve \u00c7evre Konferans\u0131 ve Fuar\u0131 2017\u2019de <strong>tan\u0131tt\u0131\u011f\u0131, <\/strong>ba\u015fta at\u0131ktan enerji ve biyok\u00fctle konusundaki \u00fcr\u00fcn ve \u00e7\u00f6z\u00fcmleri olmak \u00fczere enerji alan\u0131ndaki portf\u00f6y\u00fc<strong> ile b\u00fcy\u00fck ilgi g\u00f6rd\u00fc.<\/strong><\/p>\n<p>\u0130stanbul Fuar Merkezi&#8217;nde d\u00fczenlenen fuarda, enerji \u00fcretimi, biyoenerji \u00fcretim teknolojileri, anahtar teslim \u00e7\u00f6z\u00fcmleri ve t\u00fcm d\u00fcnyada referanslar\u0131na ekledi\u011fi yeni projeleri ile yer alan Valmet, T\u00fcrkiye enerji sekt\u00f6r\u00fcn\u00fcn \u00f6nemli projesi bin 200 MW\u2019l\u0131k Hamitabat Kombine \u00c7evrim Santrali\u2019nin ard\u0131ndan, halihaz\u0131rda Bing\u00f6l\u2019de kurulumu devam eden <strong>Ki\u011f\u0131 Hidroelektrik Enerji Tesisi (Ki\u011f\u0131 HEPP) i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/p>\n<p><strong>Ki\u011f\u0131 Santrali ana ekipmanlar\u0131 teslim edildi<\/strong><\/p>\n<p>Valmet\u2019in halihaz\u0131rda devam eden projeleri hakk\u0131nda bilgi veren Enerji ve Proses Otomasyon Sistemleri T\u00fcrkiye Sat\u0131\u015f M\u00fcd\u00fcr\u00fc <strong>Y\u00fccel Do\u011fan <\/strong>ise, Valmet\u2019in da\u011f\u0131t\u0131lm\u0131\u015f otomasyon kontrol sistemi Valmet DNA ile birlikte tesis bilgi ve performans izleme sistemini tedarik etti\u011fi Hamitabat Kombine \u00c7evrim G\u00fc\u00e7 Santrali projesinde <strong>ilk ate\u015flemenin May\u0131s ay\u0131 i\u00e7erisinde ba\u015far\u0131yla ger\u00e7ekle\u015ftirildi\u011fi bilgisini vererek projeyi bu y\u0131l i\u00e7erisinde tamamlamay\u0131 planlad\u0131klar\u0131n\u0131 aktard\u0131.<\/strong><\/p>\n<p><strong>Ki\u011f\u0131, y\u0131lda 450 milyon kWh enerji \u00fcretecek<\/strong><\/p>\n<p>Do\u011fan, \u00e7al\u0131\u015fmalar\u0131 s\u00fcren Ki\u011f\u0131 Hidroelektrik Enerji Tesisi (Ki\u011f\u0131 HEPP)hakk\u0131nda ise \u015funlar\u0131 s\u00f6yledi: \u201cDevam etmekte olan bir di\u011fer projemiz, Bing\u00f6l\u2019de kurulacak olan Devlet Su \u0130\u015fleri (DS\u0130)\u2019ne ait Ki\u011f\u0131 Hidroelektrik Enerji Tesisi\u2019dir. Proje i\u00e7in ana ekipmanlar\u0131m\u0131z bu y\u0131l\u0131n ba\u015f\u0131nda teslim edildi. Ki\u011f\u0131 HEPP, Bing\u00f6l\u2019\u00fcn 12 km kuzeydo\u011fusundaki Ki\u011f\u0131 b\u00f6lgesinde, Peri Suyu \u00fczerinde in\u015fa edilmektedir. Bu tesis kendi s\u0131n\u0131f\u0131nda T\u00fcrkiye\u2019nin d\u00f6rd\u00fcnc\u00fc, t\u00fcm barajlar\u0131 i\u00e7erisinde ise sekizinci en y\u00fcksek baraj olma \u00f6zelli\u011fine sahiptir. Burada 140 MW\u2019l\u0131k kurulu g\u00fc\u00e7 ile y\u0131ll\u0131k 450 milyon kWh enerji \u00fcretilmesi planlanmaktad\u0131r. \u015eu anda Ki\u011f\u0131 Baraj\u0131 ve hidroelektrik \u00fcretim tesisinin in\u015faas\u0131nda birinci ve ikinci \u00fcnite rotorlar %75 seviyesine ba\u015far\u0131yla indirildi. \u00dc\u00e7\u00fcnc\u00fc t\u00fcrbin grubunda ise %40 oran\u0131nda i\u015f devam ediyor. Ki\u011f\u0131 Hidroelektrik Tesisi\u2019ne ait ge\u00e7ici elektromekanik ekipman kabul\u00fc, baraj\u0131n tamamlanmas\u0131 ve \u00e7al\u0131\u015ft\u0131r\u0131lmaya ba\u015flanmas\u0131n\u0131n ard\u0131ndan yap\u0131lacak. Tesiste enerji \u00fcretiminin 2017 y\u0131l\u0131 i\u00e7erisinde ba\u015flamas\u0131 planlanmaktad\u0131r.\u201d Bu projelerin d\u0131\u015f\u0131nda da takip ettikleri yeni enerji yat\u0131r\u0131mlar\u0131 ve yenileme projeleri bulundu\u011funu aktaran Do\u011fan ekledi, \u201cBu y\u0131l Valmet ismini bir ba\u015fka prestijli enerji projesinde daha duyman\u0131z m\u00fcmk\u00fcn.\u201d<\/p>\n<p><strong>At\u0131ktan enerji ve mod\u00fcler tesis konseptinde Valmet uzmanl\u0131\u011f\u0131<\/strong><\/p>\n<p>Valmet\u2019in enerji sekt\u00f6r\u00fcne y\u00f6nelik \u00e7\u00f6z\u00fcmleri hakk\u0131nda bir a\u00e7\u0131klama yapan Valmet P&amp;E Enerji Is\u0131 ve G\u00fc\u00e7 Santralleri \u0130\u015f Geli\u015ftirme M\u00fcd\u00fcr\u00fc <strong>Ikka Heikkila<\/strong>, \u201cValmet olarak T\u00fcrkiye\u2019deki a\u011f\u0131rl\u0131kl\u0131 olarak otomasyon ve ka\u011f\u0131t sekt\u00f6r\u00fcne odakland\u0131k. Ge\u00e7ti\u011fimiz y\u0131llarda Valmet\u2019in enerji i\u015f kolu ICCI Fuar\u0131\u2019nda geni\u015f \u00e7apta lanse edildi. Bu y\u0131l di\u011fer y\u0131llardan farkl\u0131 olarak WtE (Waste to Energy) \u00e7\u00f6z\u00fcmleri ve mod\u00fcler g\u00fc\u00e7 tesisi konsepti, Valmet\u2019in odakland\u0131\u011f\u0131 hizmet \u00e7\u00f6z\u00fcmleri oldu.\u201d dedi ve \u015f\u00f6yle devam etti: \u201cG\u00fc\u00e7 \u00fcretiminde at\u0131ktan faydalanma konusunda T\u00fcrkiye\u2019de ya\u015fanan h\u0131zl\u0131 geli\u015fim, Valmet i\u00e7in \u00f6ncesine oranla \u00e7ok daha b\u00fcy\u00fck f\u0131rsatlar\u0131n g\u00fcndeme gelece\u011finin bir g\u00f6stergesi.\u201d<\/p>\n<p>Enerji sekt\u00f6r\u00fcndeki yakla\u015f\u0131k 85 y\u0131ll\u0131k tecr\u00fcbesini T\u00fcrkiye\u2019deki projelerine ta\u015f\u0131yan Valmet, ak\u0131\u015fkan yatakl\u0131 enerji kazanlar\u0131, anahtar teslim mod\u00fcler enerji santralleri, FGD, ESP gibi baca gaz\u0131 ar\u0131tma teknolojileri, gazla\u015ft\u0131rma, piroliz, biyok\u00fctle kazan ve anahtar teslim santraller, biyok\u00fctle \u00f6n-hidroliz ve geri kazan\u0131m ekipmanlar\u0131 ile sekt\u00f6rde tan\u0131n\u0131yor.<\/p>\n<p>Proje dizayn a\u015famas\u0131ndan, kesin kabul testlerine, fizibilite \u00e7al\u0131\u015fmalar\u0131ndan, anahtar teslim \u00e7\u00f6z\u00fcmlere kadar hemen hemen t\u00fcm a\u015famalarda yer alan Valmet, enerji otomasyonu alan\u0131nda da sundu\u011fu Da\u011f\u0131t\u0131lm\u0131\u015f Kontrol Sistemleri (DCS), buhar ve gaz t\u00fcrbini otomasyonu, enerji analiz\u00f6r ve entr\u00fcman \u00e7\u00f6z\u00fcmleri, kestirimci bak\u0131m ve vibrasyon izleme sistemleri, emniyet, acil kapama sistemleri (ESD), geli\u015fmi\u015f proses kontrol ve optimizasyon \u00e7\u00f6z\u00fcmleri, santral y\u00f6netim ve enformasyon sistemleri (PMS, INFO) ve enerji y\u00f6netim sistemleri (EMS) ile sekt\u00f6rde \u00f6ne \u00e7\u0131k\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji, sel\u00fcloz ve ka\u011f\u0131t sekt\u00f6rlerine y\u00f6nelik ileri teknoloji \u00fcr\u00fcn ve \u00e7\u00f6z\u00fcmleriyle t\u00fcm d\u00fcnyada \u00f6nemli projelere imza atan Valmet, sundu\u011fu inovatif \u00e7\u00f6z\u00fcmlerle m\u00fc\u015fterilerine sa\u011flad\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":64461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,1009,2698,165,35370,1090],"views":2996,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64460"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64460"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64460\/revisions"}],"predecessor-version":[{"id":64462,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64460\/revisions\/64462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/64461"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}