{"id":64310,"date":"2017-05-21T12:13:36","date_gmt":"2017-05-21T09:13:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64310"},"modified":"2017-05-21T12:14:37","modified_gmt":"2017-05-21T09:14:37","slug":"teiasin-ruzgar-yarisma-takvimi-yayimlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teiasin-ruzgar-yarisma-takvimi-yayimlandi\/","title":{"rendered":"(Turkish) TE\u0130A\u015e&#8217;\u0131n R\u00fczgar Yar\u0131\u015fma Takvimi Yay\u0131mland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64310\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div style=\"color: #0a0a0a;\"><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan 24-30 Nisan 2015&#8217;te\u00a0\u00a0al\u0131nan lisansl\u0131 r\u00fczgar enerjisi santralleri ba\u015fvurular\u0131 i\u00e7in yar\u0131\u015fma takvimi yay\u0131mland\u0131.<\/strong><\/div>\n<p>TE\u0130A\u015e\u2019\u0131n yapt\u0131\u011f\u0131 a\u00e7\u0131klamaya\u00a0g\u00f6re 11 ayr\u0131 b\u00f6lgedeki 710 MW\u2019l\u0131k kapasite i\u00e7in 21, 22 ve 23 Haziran 2015 tarihlerinde yar\u0131\u015fma\u00a0ger\u00e7ekle\u015ftirilecektir.<\/p>\n<div style=\"color: #0a0a0a;\"><\/div>\n<table style=\"color: #0a0a0a;\">\n<tbody>\n<tr>\n<td width=\"537\"><strong>21.06.2017<\/strong> \u00c7ar\u015famba Saat: <strong>10:00<\/strong><\/td>\n<td width=\"537\">35 \/ Kayseri \u2013 Ni\u011fde (80 MW)<\/p>\n<p style=\"color: #0a0a0a;\">01 \/ Adana (120 MW)<\/p>\n<p style=\"color: #0a0a0a;\">07 \/ Ankara \u2013 \u00a0K\u0131r\u0131kkale \u2013 \u00a0\u00c7ank\u0131r\u0131 (60 MW) 05 \/ Aksaray \u2013 \u00a0K\u0131r\u015fehir \u2013 \u00a0Nev\u015fehir (60 MW)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"537\"><strong>22.06.2017<\/strong> Per\u015fembe Saat: <strong>10:00<\/strong><\/td>\n<td width=\"537\">24 \/ Edirne (40 MW)<\/p>\n<p style=\"color: #0a0a0a;\">44 \/ Tekirda\u011f (60 MW)<\/p>\n<p style=\"color: #0a0a0a;\">36 \/ K\u0131rklareli (70 MW)<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"537\"><strong>23.06.2017<\/strong> Cuma Saat: <strong>10:00<\/strong><\/td>\n<td width=\"537\">43 \/ Sivas (80 MW)<\/p>\n<p style=\"color: #0a0a0a;\">45 \/ Tokat (40 MW)<\/p>\n<p style=\"color: #0a0a0a;\">41 \/ Ordu (50 MW)<\/p>\n<p style=\"color: #0a0a0a;\">16 \/ Bilecik \u2013 Eski\u015fehir \u2013 K\u00fctahya (50 MW)<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan 24-30 Nisan 2015&#8217;te\u00a0\u00a0al\u0131nan lisansl\u0131 r\u00fczgar enerjisi santralleri ba\u015fvurular\u0131 i\u00e7in yar\u0131\u015fma takvimi yay\u0131mland\u0131. TE\u0130A\u015e\u2019\u0131n yapt\u0131\u011f\u0131 a\u00e7\u0131klamaya\u00a0g\u00f6re 11 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":35853,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,2698,165,34041,69,16,34042,23318,34043,22615,4784,22618,34044,34045,20446,34046],"views":845,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64310"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64310"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64310\/revisions"}],"predecessor-version":[{"id":64312,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64310\/revisions\/64312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/35853"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}