{"id":64271,"date":"2017-05-19T16:04:02","date_gmt":"2017-05-19T13:04:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64271"},"modified":"2017-05-19T16:04:02","modified_gmt":"2017-05-19T13:04:02","slug":"enerjide-bu-yil-6-milyar-295-milyon-liralik-ozellestirme-ihalesi-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjide-bu-yil-6-milyar-295-milyon-liralik-ozellestirme-ihalesi-yapildi\/","title":{"rendered":"(Turkish) Enerji&#8217;de Bu Y\u0131l 6 Milyar 295 Milyon Liral\u0131k \u00d6zelle\u015ftirme \u0130halesi Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64271\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) verilerine g\u00f6re, ge\u00e7ti\u011fimiz y\u0131l toplam 532 megavat k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-60786\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir-300x199.jpg\" alt=\"deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/01\/deriner-hes-uretilen-hidroelektrik-enerjinin-yuzde-25ini-karsilamaktadir.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>urulu g\u00fcce sahip 9 hidroelektrik santralinin \u00f6zelle\u015ftirme s\u00fcreci\u00a0tamamland\u0131.<\/span><\/strong><\/p>\n<p>Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait olan bin 14 megavatl\u0131k kapasite i\u00e7in toplamda 5 milyar 805 milyon liral\u0131k \u00f6zelle\u015ftirme ile birlikte\u00a0T\u00fcrkiye Petrolleri Petrol Da\u011f\u0131t\u0131m A\u015e\u2019den (TPPD) elde edilen \u00f6zelle\u015ftirme geliriyle beraber toplamda 6 milyar 295 milyon liral\u0131k ihale i\u015flemi\u00a0ger\u00e7ekle\u015ftirildi.<\/p>\n<p>Bununla birlikte enerjide 366 megavatl\u0131k kapasitenin \u00f6zelle\u015ftirilmesi i\u00e7in t\u00fcm\u00a0haz\u0131rl\u0131klar devam etmektedir. \u00d6zelle\u015ftirme \u0130daresi&#8217;nce y\u00fcr\u00fct\u00fclen haz\u0131rl\u0131klar E\u00dcA\u015e\u2019a ait olan 9 yeni santrali kapsamaktad\u0131r. Bu santraller, Kepez, Yenice, Kesikk\u00f6pr\u00fc, Derbent, \u00c7aml\u0131g\u00f6ze, Seyhan 1, Seyhan 2, Y\u00fcre\u011fir ile daha \u00f6nce ihalesi ertelenen \u00c7aml\u0131ca 1 hidroelektrik santralidir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) verilerine g\u00f6re, ge\u00e7ti\u011fimiz y\u0131l toplam 532 megavat kurulu g\u00fcce sahip 9 hidroelektrik santralinin \u00f6zelle\u015ftirme s\u00fcreci\u00a0tamamland\u0131. Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":60786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,1009,2698,165,1033,35370,1090,1248,34026,34027],"views":1242,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64271"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64271"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64271\/revisions"}],"predecessor-version":[{"id":64272,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64271\/revisions\/64272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/60786"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}