{"id":64194,"date":"2017-05-17T11:07:01","date_gmt":"2017-05-17T08:07:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=64194"},"modified":"2017-05-17T11:15:09","modified_gmt":"2017-05-17T08:15:09","slug":"bereket-enerji-yalovadaki-res-projesini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bereket-enerji-yalovadaki-res-projesini-tamamladi\/","title":{"rendered":"(Turkish) Bereket Enerji, Yalova\u2019daki RES Projesini Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/64194\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Bereket Enerji Grubu\u2019nun Yalova\u2019da s\u00fcren\u00a0r\u00fczgar enerjisi projesinin son etab\u0131 tamamlanarak devreye\u00a0girdi.<\/span><\/strong><\/p>\n<p>18 MW (Megawatt) g\u00fcc\u00fcnde 12 t\u00fcrbinin d<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-64195\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi-300x168.jpg\" alt=\"bereket-enerji-yalovadaki-res-projesini-tamamladi\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/05\/bereket-enerji-yalovadaki-res-projesini-tamamladi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>aha devreye al\u0131nmas\u0131yla beraber\u00a0grubun Yalova\u2019daki r\u00fczgar enerjisindeki kurulu g\u00fcc\u00fc 54 MW\u2019\u00a0a y\u00fckseldi.U\u015fak- Banaz\u2019da 54 MW, Ayd\u0131n- S\u00f6ke\u2019de 45 MW g\u00fcc\u00fcnde r\u00fczgar enerji santralleri bulunan grubun Yalova\u2019daki 54 MW\u2019l\u0131k projesi de tamamlanarak devreye al\u0131nd\u0131. Bereket Enerji\u2019nin r\u00fczgar enerjisindeki toplam kurulu g\u00fcc\u00fc de 153 megawatta ula\u015fm\u0131\u015f oldu.<\/p>\n<p>Bereket Enerji Grubu R\u00fczgar Projeleri Direkt\u00f6r\u00fc \u00d6zkan Ulu, r\u00fczgar santrallerinin yap\u0131m\u0131nda \u00e7evre ve do\u011fan\u0131n korunmas\u0131n\u0131 temel ilke kabul ettiklerini ifade ederek, t\u00fcm projelerde halk\u0131n bilgilendirildi\u011fini\u00a0de belirtti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bereket Enerji Grubu\u2019nun Yalova\u2019da s\u00fcren\u00a0r\u00fczgar enerjisi projesinin son etab\u0131 tamamlanarak devreye\u00a0girdi. 18 MW (Megawatt) g\u00fcc\u00fcnde 12 t\u00fcrbinin daha devreye al\u0131nmas\u0131yla beraber\u00a0grubun Yalova\u2019daki r\u00fczgar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":64195,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[4720,63,67,1009,2698,165,35370,474,69,16,231,23318,22615,4784,27654,105],"views":1532,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64194"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=64194"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64194\/revisions"}],"predecessor-version":[{"id":64198,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/64194\/revisions\/64198"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/64195"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=64194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=64194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=64194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}