{"id":63795,"date":"2017-04-30T17:25:16","date_gmt":"2017-04-30T14:25:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63795"},"modified":"2017-04-30T17:26:40","modified_gmt":"2017-04-30T14:26:40","slug":"ode-yalitim-eskisehir-fabrikasinda-uretime-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti\/","title":{"rendered":"(Turkish) Ode Yal\u0131t\u0131m Eski\u015fehir Fabrikas\u0131nda \u00dcretime Ge\u00e7ti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63795\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yal\u0131t\u0131mda d\u00fcnya markas\u0131 olma vizyonuyla faaliyet g\u00f6steren ODE, yat\u0131r\u0131m\u0131n\u0131n ilk faz\u0131n\u0131 tamamlad\u0131\u011f\u0131 Eski\u015fehir fabrikas\u0131nda \u00fcretime start verdi. Fabrikan\u0131n \u00a0ilk faz\u0131n\u0131n tamamlanmas\u0131yla faaliyete al\u0131nan 30 bin metrekarelik kapal\u0131 alanda su yal\u0131t\u0131m\u0131n\u0131n ana malzemesi olan bit\u00fcml\u00fc membran \u00fcretimine ba\u015fland\u0131. ODE Yal\u0131t\u0131m Y\u00f6netim Kurulu Ba\u015fkan\u0131 Orhan Turan, Eski\u015fehir fabrikas\u0131n\u0131n yarataca\u011f\u0131 kapasite art\u0131\u015f\u0131 ile 30 milyon metrekareye \u00e7\u0131kacak bit\u00fcml\u00fc membran \u00fcretim kapasiteleri ile su yal\u0131t\u0131m\u0131nda liderli\u011fe oynad\u0131klar\u0131n\u0131 s\u00f6yledi. <\/strong><\/p>\n<p>Yal\u0131t\u0131m sekt\u00f6r\u00fcn\u00fcn \u00f6nde gelen \u015firketlerinden ODE Yal\u0131t\u0131m, yat\u0131r\u0131m\u0131na 2015 y\u0131l\u0131nda ba\u015flad\u0131\u011f\u0131 ve tamamland\u0131\u011f\u0131nda 100 milyon TL\u2019ye mal olacak Eski\u015fehir fabrikas\u0131nda su yal\u0131t\u0131m\u0131n\u0131n ana malzemesi olan bit\u00fcml\u00fc membran \u00fcretimine ba\u015flad\u0131. ODE Yal\u0131t\u0131m, <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-63796\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti-300x206.jpg\" alt=\"DCIM100MEDIADJI_0004.JPG\" width=\"300\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/ode-yalitim-eskisehir-fabrikasinda-uretime-gecti.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Eski\u015fehir\u2019deki dev \u00fcretim \u00fcss\u00fcn\u00fc tamamlad\u0131\u011f\u0131nda \u00c7orlu fabrikas\u0131 ile birlikte toplam 100 bin metrekarelik kapal\u0131 alana ula\u015farak, T\u00fcrkiye yal\u0131t\u0131m sekt\u00f6r\u00fcn\u00fcn en b\u00fcy\u00fck kapal\u0131 alana sahip \u00fcreticisi konumuna y\u00fckselecek.<\/p>\n<p><strong>\u201cMembran \u00fcretim kapasitemiz ile en b\u00fcy\u00fck \u00fcretici olduk\u201d<\/strong><\/p>\n<p>Eski\u015fehir fabrikas\u0131n\u0131n yat\u0131r\u0131m s\u00fcrecine T\u00fcrkiye\u2019de ya\u015fanan t\u00fcm geli\u015fmelere ra\u011fmen ara vermediklerini belirten <strong>ODE Yal\u0131t\u0131m<\/strong> <strong>Y\u00f6netim Kurulu Ba\u015fkan\u0131 Orhan Turan, <\/strong>\u201cBiz bu \u00fclkeye inan\u0131yor ve gelece\u011fe yat\u0131r\u0131m yap\u0131yoruz. Bu nedenle de yat\u0131r\u0131m\u0131m\u0131za hi\u00e7 ara vermedik ve planlad\u0131\u011f\u0131m\u0131z gibi 2017 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde Eski\u015fehir fabrikam\u0131zda \u00fcretime ba\u015flad\u0131k. Tesisin devreye al\u0131nan ilk faz\u0131nda y\u0131ll\u0131k 18 milyon metrekare membran \u00fcretimi planl\u0131yoruz. \u00c7orlu fabrikam\u0131zla birlikte y\u0131ll\u0131k toplamda 30 milyon metrekare membran \u00fcretim hacmine ula\u015fm\u0131\u015f olaca\u011f\u0131z. Bu da bizi su yal\u0131t\u0131m\u0131nda liderli\u011fe ta\u015f\u0131yor. Fabrikam\u0131z\u0131 2030 y\u0131l\u0131 ihtiya\u00e7lar\u0131na g\u00f6re tasarlayarak T\u00fcrkiye\u2019nin en modern \u00fcretim tesisine imza att\u0131k. Tesisimiz tam kapasite faaliyete ge\u00e7ti\u011finde kau\u00e7uk k\u00f6p\u00fc\u011f\u00fc \u00fcretiminde ula\u015faca\u011f\u0131m\u0131z y\u0131ll\u0131k 20 bin ton kapasite ile teknik yal\u0131t\u0131m sekt\u00f6r\u00fcnde de \u00c7in ve Almanya aras\u0131ndaki co\u011frafyan\u0131n en b\u00fcy\u00fck \u00fcreticisi olaca\u011f\u0131z. B\u00f6ylelikle yal\u0131t\u0131m sekt\u00f6r\u00fcnde T\u00fcrkiye\u2019den \u00e7\u0131kan bir d\u00fcnya markas\u0131 olma hedefimize bir ad\u0131m daha yakla\u015faca\u011f\u0131z\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yal\u0131t\u0131mda d\u00fcnya markas\u0131 olma vizyonuyla faaliyet g\u00f6steren ODE, yat\u0131r\u0131m\u0131n\u0131n ilk faz\u0131n\u0131 tamamlad\u0131\u011f\u0131 Eski\u015fehir fabrikas\u0131nda \u00fcretime start verdi. Fabrikan\u0131n \u00a0ilk faz\u0131n\u0131n tamamlanmas\u0131yla faaliyete al\u0131nan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63796,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[63,67,1009,2698,165,103,33913,33914,33915],"views":771,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63795"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63795"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63795\/revisions"}],"predecessor-version":[{"id":63797,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63795\/revisions\/63797"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/63796"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}