{"id":63745,"date":"2017-04-28T10:51:57","date_gmt":"2017-04-28T07:51:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63745"},"modified":"2017-04-28T10:52:24","modified_gmt":"2017-04-28T07:52:24","slug":"topcam-hes-yilda-198-5-milyon-kilovat-saat-enerji-uretimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/topcam-hes-yilda-198-5-milyon-kilovat-saat-enerji-uretimi-yapacak\/","title":{"rendered":"(Turkish) Top\u00e7am HES, Y\u0131lda 198.5 Milyon Kilovat Saat Enerji \u00dcretimi Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63745\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">Ordu Mesudiye&#8217;de yakla\u015f\u0131k 400 milyon lira yat\u0131r\u0131m ile\u00a0in\u015fa edilen Top\u00e7am Baraj\u0131, t\u00fcm \u00fcnitelerin devreye girmesiyle elektrik \u00fcretimine ba\u015flad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/topcam-hes-yilda-198-5-milyon-kilovat-saat-enerji-uretimi-yapacak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-63746\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/topcam-hes-yilda-198-5-milyon-kilovat-saat-enerji-uretimi-yapacak-300x145.jpg\" alt=\"topcam-hes-yilda-198-5-milyon-kilovat-saat-enerji-uretimi-yapacak\" width=\"300\" height=\"177\" \/><\/a><\/span><\/strong><\/p>\n<p>\u0130lk \u00fcnitesi 21 Aral\u0131k 2016 tarihinde devreye al\u0131nan Top\u00e7am Baraj\u0131\u2019nda elektrik \u00fcretim test a\u015famas\u0131ndan ba\u015far\u0131l\u0131 sonu\u00e7 al\u0131n\u0131nca 2. ve 3. \u00fcniteler 15 Mart devreye al\u0131narak Elektrik \u00dcretim A.\u015e.\u2019ye (E\u00dcA\u015e) devredildi.\u00a0Top\u00e7am Baraj\u0131, ilk 4 ayda \u00fcretmesi gereken enerjinin be\u015fte birini \u00fcretti.<\/p>\n<p>Devlet Su \u0130\u015fleri (DS\u0130) 7. B\u00f6lge M\u00fcd\u00fcr\u00fc Ahmet Kan\u0131k ise \u201c400 milyon TL\u2019ye mal olan, 133 metrek\u00fcp su depolayacak Top\u00e7am Baraj\u0131 ve 3 \u00fcniteden olu\u015fan, toplamda 60 MW g\u00fcce sahip olan Top\u00e7am HES&#8217;i y\u0131ll\u0131k 198.5 milyon kilovat saat enerji \u00fcretimi yaparak \u00fclke ekonomisine y\u0131lda yakla\u015f\u0131k 60 milyon TL katk\u0131 ger\u00e7ekle\u015ftirecektir.\u201d\u00a0ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ordu Mesudiye&#8217;de yakla\u015f\u0131k 400 milyon lira yat\u0131r\u0131m ile\u00a0in\u015fa edilen Top\u00e7am Baraj\u0131, t\u00fcm \u00fcnitelerin devreye girmesiyle elektrik \u00fcretimine ba\u015flad\u0131. \u0130lk \u00fcnitesi 21 Aral\u0131k 2016 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63746,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[33907,2273,1091,19,63,67,1009,2698,165,18,35370,1090,13929,33906],"views":1232,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63745"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63745"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63745\/revisions"}],"predecessor-version":[{"id":63747,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63745\/revisions\/63747"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/63746"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}