{"id":63718,"date":"2017-04-27T13:28:58","date_gmt":"2017-04-27T10:28:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63718"},"modified":"2017-04-27T13:29:49","modified_gmt":"2017-04-27T10:29:49","slug":"mut-un-sulama-kooperatifi-kendi-kaynagi-ile-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mut-un-sulama-kooperatifi-kendi-kaynagi-ile-gunes-santrali-kuracak\/","title":{"rendered":"(Turkish) Mut\u2019un Sulama Kooperatifi Kendi Kayna\u011f\u0131yla G\u00fcne\u015f Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63718\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #0a0a0a;\">2014&#8217;de 1 Megavatl\u0131k G\u00fcne\u015f Enerji Santrali (GES) proje \u00e7al\u0131\u015fmalar\u0131na ba\u015flayan K\u00fcrk\u00e7\u00fc Sulama Kooperatifi\u00a0projeyle yakla\u015f\u0131k 1 milyon 200 bin dolarl\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015ftirerek\u00a0ana \u015febekeye y\u0131lda 1 milyon 850 bin kilovatl\u0131k elektrik verecektir<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-46725\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/tar\u0131msal-sulama-2383203-696x385-300x165.jpg\" alt=\"tar\u0131msal-sulama-2383203-696x385\" width=\"300\" height=\"203\" \/><\/a>. 7 y\u0131lda yat\u0131r\u0131m\u0131n\u0131 amorti edecek olan tesisin hesaplanan verimlilik s\u00fcresinin ise 30 y\u0131l olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/span><\/strong><\/p>\n<p>Kooperatif Ba\u015fkan\u0131 Halil Aktepe ise; &#8221; Mahalle de i\u00e7me suyunu 50 kuru\u015ftan \u00f6derken, sulama suyumuzu 75 kuru\u015fa mal edebiliyoruz. Bu projenin ilk \u00e7\u0131k\u0131\u015f noktas\u0131 sulama maliyetlerimizi d\u00fc\u015f\u00fcrmektir. \u0130kinci olarak mahallemizde sulamaya elveri\u015fli 10 bin d\u00f6n\u00fcm\u00fcn \u00fczerinde arazi varken, biz bug\u00fcn bin 500 d\u00f6n\u00fcml\u00fck k\u0131sm\u0131n\u0131 sulayabiliyor ve tar\u0131msal anlamda de\u011ferlendirebilmekteyiz. Amac\u0131m\u0131z sulanabilir tar\u0131m arazimizi maliyetleri d\u00fc\u015f\u00fcrerek artt\u0131rmak ve tamam\u0131n\u0131 sulayabilmektir.&#8221;\u00a0ifadelerine yer verdi.<\/p>\n<p>Aktepe ayr\u0131ca &#8220;Y\u00fcklenici firma ile s\u00f6zle\u015fmemizi imzalad\u0131k. 10 aya kadar projemizi hayata ge\u00e7irerek, enerji \u00fcretmeyi hedeflemekteyiz\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.2014&#8217;de 1 Megavatl\u0131k G\u00fcne\u015f Enerji Santrali (GES) proje \u00e7al\u0131\u015fmalar\u0131na ba\u015flayan K\u00fcrk\u00e7\u00fc Sulama Kooperatifi\u00a0projeyle yakla\u015f\u0131k 1 milyon 200 bin dolarl\u0131k yat\u0131r\u0131m ger\u00e7ekle\u015ftirerek\u00a0ana \u015febekeye y\u0131lda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46725,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[19,63,67,1009,2698,165,117,2326,227,13,2569,23133,22975,4269,33896,1301,23162,33897,3558],"views":1211,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63718"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63718"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63718\/revisions"}],"predecessor-version":[{"id":63720,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63718\/revisions\/63720"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46725"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63718"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63718"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63718"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}