{"id":63580,"date":"2017-04-24T11:12:59","date_gmt":"2017-04-24T08:12:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63580"},"modified":"2017-04-24T17:17:41","modified_gmt":"2017-04-24T14:17:41","slug":"elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi\/","title":{"rendered":"(Turkish) Elektrik Kesintileri ve Ar\u0131zalar\u0131na Y\u00f6nelik DEPAR \u0130simli Cihaz \u00dcretildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63580\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>BEDA<\/strong><strong>\u015e<\/strong><strong> ve ASELSAN m<\/strong><strong>\u00fc<\/strong><strong>hendisleri taraf<\/strong><strong>\u0131<\/strong><strong>ndan geli<\/strong><strong>\u015f<\/strong><strong>tirilen, trafolar<\/strong><strong>\u0131<\/strong><strong>n al<\/strong><strong>\u00e7<\/strong><strong>ak gerilim kablolar<\/strong><strong>\u0131<\/strong><strong>n<\/strong><strong>\u0131<\/strong><strong> s<\/strong><strong>\u00fc<\/strong><strong>rekli izleyen ve ar<\/strong><strong>\u0131<\/strong><strong>za olu<\/strong><strong>\u015f<\/strong><strong>madan erken alarm verebilen <\/strong><strong>\u2018<\/strong><strong>DEPAR<\/strong><strong>\u2019<\/strong><strong> adl<\/strong><strong>\u0131<\/strong><strong> cihaz, 5. Uluslararas<\/strong><strong>\u0131<\/strong><strong>\u0130<\/strong><strong>stanbul Ak<\/strong><strong>\u0131<\/strong><strong>ll<\/strong><strong>\u0131<\/strong><strong>\u015e<\/strong><strong>ebekeler Kongre ve Fuar Merkezi<\/strong><strong>\u2019<\/strong><strong>nde ilk kez g<\/strong><strong>\u00f6<\/strong><strong>r<\/strong><strong>\u00fc<\/strong><strong>c<\/strong><strong>\u00fc<\/strong><strong>ye <\/strong><strong>\u00e7<\/strong><strong>\u0131<\/strong><strong>kt<\/strong><strong>\u0131<\/strong><strong>.<\/strong><\/p>\n<p>\u0130stanbul Avrupa Yakas\u0131\u2019nda elektrik da\u011f\u0131t\u0131m\u0131 hizmetini sa\u011flayan ve 7\/24 kaliteli ve kesintisiz enerji hedefi ile yat\u0131r\u0131mlar\u0131n\u0131 s\u00fcrd\u00fcren Bo\u011fazi\u00e7i Elektrik Da\u011f\u0131t\u0131m A.\u015e. (BEDA\u015e), ASELSAN ile \u00e7ok \u00f6zel bir Ar-Ge projeye imza att\u0131. BEDA\u015e ve ASELSAN <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi.png\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-63610\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi-300x200.png\" alt=\"elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi-300x200.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi-75x50.png 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2017\/04\/elektrik-kesintileri-ve-arizalarina-yonelik-depar-isimli-cihaz-uretildi.png 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>m\u00fchendisleri taraf\u0131ndan geli\u015ftirilen ve 5. Uluslararas\u0131\u0130stanbul Ak\u0131ll\u0131\u015eebekeler Kongre ve Fuar\u0131\u2019nda ilk kez g\u00f6r\u00fcc\u00fcye \u00e7\u0131kan \u2018DEPAR\u2019 ad\u0131 verilen cihaz; mahallelere elektrik sa\u011flayan trafolar\u0131 s\u00fcrekli izleyerek, normalin d\u0131\u015f\u0131nda bir durumda, ar\u0131za veya kesinti ger\u00e7ekle\u015fmeden \u00f6nce sistemin erken alarma ge\u00e7mesini sa\u011fl\u0131yor.<\/p>\n<p>Elektrik da\u011f\u0131t\u0131m \u015febekelerindeki trafo merkezlerine yerle\u015ftirilen DEPAR sayesinde, al\u00e7ak gerilim \u015febekelerinin enerji, \u0131s\u0131 ve g\u00fc\u00e7 kalite \u00f6l\u00e7\u00fcmleri yap\u0131l\u0131yor; elde edilen veriler uzaktan izleme ve kontrol merkezine iletiliyor. Gelen verileri analiz eden izleme merkezi, kesinti ve ar\u0131za ihtimali \u00fczerine hen\u00fcz sorun ya\u015fanmadan m\u00fcdahale i\u00e7in ekipleri trafo merkezine y\u00f6nlendiriyor.<\/p>\n<p><strong>\u2018ASELSAN AKILLI S<\/strong><strong>\u0130<\/strong><strong>STEMLER <\/strong><strong>\u0130<\/strong><strong>\u00c7<\/strong><strong>\u0130<\/strong><strong>N <\/strong><strong>\u00c7<\/strong><strong>ALI<\/strong><strong>\u015e<\/strong><strong>IYOR<\/strong><strong>\u2019<\/strong><\/p>\n<p>Bu projenin \u015febekenin ak\u0131ll\u0131 hale gelmesinde \u00f6nemli bir ad\u0131m oldu\u011funa dikkat \u00e7eken<strong> ASELSAN G\u00fc\u00e7 Kontrol ve Yenilenebilir Enerji Program M\u00fcd\u00fcr\u00fc Dr. Tar<\/strong><strong>\u0131<\/strong><strong>k Oran<\/strong><strong>\u00e7<\/strong><strong>,<\/strong> &#8220;Savunma elektroni\u011fi d\u0131\u015f\u0131nda \u00fclkemiz i\u00e7in di\u011fer bir kritik teknoloji alan\u0131 olan enerji sekt\u00f6r\u00fcnde, ak\u0131ll\u0131 enerji y\u00f6netimi maksatl\u0131\u00fcr\u00fcnler geli\u015ftirmekteyiz. Bu alanda BEDA\u015e ile y\u00fcr\u00fctt\u00fc\u011f\u00fcm\u00fcz proje kapsam\u0131nda geli\u015ftirilen g\u00fc\u00e7 kalitesi \u00f6l\u00e7\u00fcm cihaz\u0131 ve izleme merkezi yaz\u0131l\u0131m\u0131 ile da\u011f\u0131t\u0131m \u015febekesi anl\u0131k olarak izlenip kontrol edilebilecek hale gelecek. Ayr\u0131ca trafo s\u0131cakl\u0131\u011f\u0131 ve sigorta durum bilgisi gibi di\u011fer teknik bilgiler de operat\u00f6r taraf\u0131ndan uzaktan izlenebilecek&#8221; dedi.<\/p>\n<p><strong>\u2018AKILLI <\/strong><strong>\u015e<\/strong><strong>EKEBE ALTYAPISI F<\/strong><strong>\u0130<\/strong><strong>L<\/strong><strong>\u0130<\/strong><strong>ZLEN<\/strong><strong>\u0130<\/strong><strong>YOR<\/strong><strong>\u2019<\/strong><\/p>\n<p>Kesintisiz enerji ile m\u00fc\u015fteri memnuniyetini en \u00fcst d\u00fczeye \u00e7\u0131karmay\u0131 hizmet politikas\u0131 olarak belirleyen BEDA\u015e, Ar-Ge projeleri ve teknoloji yat\u0131r\u0131mlar\u0131na b\u00fcy\u00fck \u00f6nem veriyor. Bu \u00e7er\u00e7evede BEDA\u015e olarak, savunma sanayimizin milli gururu ASELSAN ile birlikte enerji sekt\u00f6r\u00fcnde yeni bir sayfa a\u00e7maktan b\u00fcy\u00fck gurur duyduklar\u0131n\u0131 dile getiren <strong>BEDA<\/strong><strong>\u015e<\/strong><strong> Ar-Ge ve Yat<\/strong><strong>\u0131<\/strong><strong>r<\/strong><strong>\u0131<\/strong><strong>m Direkt<\/strong><strong>\u00f6<\/strong><strong>r<\/strong><strong>\u00fc<\/strong><strong>\u0130<\/strong><strong>lker Dursun <\/strong>da uzun s\u00fcren bir \u00e7al\u0131\u015fman\u0131n \u00fcr\u00fcn\u00fc olarak geli\u015ftirilen DEPAR\u2019\u0131n, T\u00fcrkiye genelinde elektrik da\u011f\u0131t\u0131m yap\u0131lan t\u00fcm b\u00f6lgelerde uygulanabilece\u011fine i\u015faret etti.<\/p>\n<p>\u0130lker Dursun, \u201cOtomatik Saya\u00e7 Okuma Sistemi (OSOS) ile b\u00fcy\u00fck elektrik t\u00fcketicilerini anl\u0131k olarak takip edebiliyoruz. ASELSAN ile birlikte hayata ge\u00e7irdi\u011fimiz DEPAR sayesinde ise art\u0131k mahalle ve sokak baz\u0131nda enerji kalitesini de anl\u0131k olarak izleme ve \u015febekenin t\u00fcm\u00fcm\u00fcn r\u00f6ntgenini \u00e7ekme imk\u00e2n\u0131na sahip olaca\u011f\u0131z. Bu, daha \u00f6nce farkl\u0131 bir\u00e7ok proje ile tohumlar\u0131n\u0131 att\u0131\u011f\u0131m\u0131z ak\u0131ll\u0131\u015febekeler altyap\u0131s\u0131n\u0131n filizlenmesi anlam\u0131na geliyor. Bundan sonraki d\u00f6nemde de, sekt\u00f6r\u00fcn amiral gemisi olarak yat\u0131r\u0131m ve Ar-Ge faaliyetlerimize h\u0131z kesmeden devam edece\u011fiz\u201d de\u011ferlendirmesinde bulundu.<\/p>\n<p><strong>\u0130<\/strong><strong>LK ETAPTA 5 MAHALLEDE P<\/strong><strong>\u0130<\/strong><strong>LOT UYGULAMA BA<\/strong><strong>\u015e<\/strong><strong>LIYOR<\/strong><\/p>\n<p>\u0130stanbul Avrupa Yakas\u0131\u2019nda 4,8 milyon aboneye hizmet veren BEDA\u015e, yeni sistemin pilot uygulamas\u0131n\u0131 h\u0131zla hayata ge\u00e7irecek. \u00d6n\u00fcm\u00fczdeki g\u00fcnlerde ilk etapta 5 mahallenin trafo merkezine yerle\u015ftirilecek DEPAR sayesinde enerji, \u0131s\u0131, g\u00fc\u00e7 kalitesi vb. \u00f6l\u00e7\u00fcmleri uzaktan izlenecek ve kontrol merkezine anl\u0131k olarak iletilecek. Pilot \u00e7al\u0131\u015fman\u0131n tamamlanmas\u0131ndan sonra, ba\u015fta \u0130stanbul olmak \u00fczere T\u00fcrkiye\u2019deki ve yurtd\u0131\u015f\u0131ndaki bir\u00e7ok trafo merkezinde DEPAR cihaz\u0131n\u0131n yayg\u0131nla\u015fmas\u0131 ve sekt\u00f6re yeni bir \u00e7\u0131\u011f\u0131r a\u00e7mas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.BEDA\u015e ve ASELSAN m\u00fchendisleri taraf\u0131ndan geli\u015ftirilen, trafolar\u0131n al\u00e7ak gerilim kablolar\u0131n\u0131 s\u00fcrekli izleyen ve ar\u0131za olu\u015fmadan erken alarm verebilen \u2018DEPAR\u2019 adl\u0131 cihaz, 5. Uluslararas\u0131\u0130stanbul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":63610,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[33859,21546,1506,33860,68,11628,1266,61,19638,11276,1451,2873,63,67,1009,2698,165],"views":979,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63580"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63580"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63580\/revisions"}],"predecessor-version":[{"id":63611,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63580\/revisions\/63611"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/63610"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}