{"id":63569,"date":"2017-04-24T01:42:18","date_gmt":"2017-04-23T22:42:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=63569"},"modified":"2017-04-24T01:44:07","modified_gmt":"2017-04-23T22:44:07","slug":"mersinde-akin-holding-30-mw-gucunde-res-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mersinde-akin-holding-30-mw-gucunde-res-kuracak\/","title":{"rendered":"(Turkish) Mersin&#8217;de Ak\u0131n Holding Taraf\u0131ndan 30 MW G\u00fcc\u00fcnde RES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/63569\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ak\u0131n Holding taraf\u0131ndan Mersin&#8217;in Mut il\u00e7esinde toplamda 30 MW g\u00fcce sahip\u00a0Ser<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-38107\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti-300x200.jpg\" alt=\"res\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/04\/epdk-res-onlisans-basvuru-kriterlerini-anlatti.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>tavul R\u00fczgar Enerjisi Santrali kurulumu yap\u0131lacak.<\/strong><\/p>\n<p>Yat\u0131r\u0131m bedeli 75.000.000 TL olan proje her biri 1.250 kWm \/ 1.250 kWe kurulu g\u00fcce sahip 24 adet t\u00fcrbinden meydana gelecektir.\u00a0Santral ile y\u0131lda 101.966.400 kWh elektrik \u00fcretiminin sa\u011flanmas\u0131 ve bu elektri\u011fin yakla\u015f\u0131k 7,5 km uzakl\u0131kta yer alan 154 kV Da\u011fpazar\u0131 RES Trafo Merkezi vas\u0131tas\u0131 ile ulusal \u015febekeye ba\u011flanmas\u0131\u00a0\u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>EPDK&#8217;n\u0131n 25.02.2016&#8217;da 40 ay s\u00fcre ile \u00d6n Lisans verilen proje hakk\u0131nda Dan\u0131\u015ftay 14. Dairesi y\u00fcr\u00fctmeyi durdurma karar\u0131 mevcuttur. \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019n\u0131n g\u00f6r\u00fc\u015f\u00fc do\u011frultusunda\u00a0projeyle ilgili bir \u00c7ED ba\u015fvuru dosyas\u0131n\u0131n haz\u0131rl\u0131klar\u0131 tamamlanm\u0131\u015ft\u0131r. Projeye ili\u015fkin olarak \u00c7ED S\u00fcreci de ba\u015flat\u0131lm\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ak\u0131n Holding taraf\u0131ndan Mersin&#8217;in Mut il\u00e7esinde toplamda 30 MW g\u00fcce sahip\u00a0Sertavul R\u00fczgar Enerjisi Santrali kurulumu yap\u0131lacak. Yat\u0131r\u0131m bedeli 75.000.000 TL olan proje her [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":38107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[33856,2878,63,67,1009,2698,165,1301,23162,474,69,16,231,23318,22615,4784,33857],"views":1705,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63569"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=63569"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63569\/revisions"}],"predecessor-version":[{"id":63573,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/63569\/revisions\/63573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/38107"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=63569"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=63569"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=63569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}